Loading...
HomeMy WebLinkAbout107Michelle Farfan From: Sent: To: Cc: Subject: Attachments: t,f fhrrld$ ,1. gqnt &imrd, [,A tatL l !dqif6.ra{a I t .{|}!aJtttr$.r.s David W. Johnson < djoh nson @co jefferson.wa,us > Thursday, June 02, 2016 1:26 PM Cynthia Koan; Gary Felder; Kevin Coker; Lorna Smith; Mark Jochems; Matt Sircely; Richard Hull;Tom Giske David W. Johnson Building Height Port Ludllow Height Restrictions.pdf; MOU dist4 Draft 7 dc edit 3-4-20L1.doc Attached is the Port Ludlow code that allows building height in excess of 50 feet with fire district approval. Also attached is the Brinnon Fire District MOU. See section 2.4.1 that requires the resort provide aerial apparatus of at least 75 feet to a address the 80 foot building. David Wayne Johnson - LEED AP - Neighborhood Development Associate Planner - Port Ludlow Lead Planner Department of Community Development Jefferson County 360.379.4465 Mission: To preserve and enhance the quality of lfe in Jefferson County by promoting a vibront economy, sound communities and a healthy environment. 5f, SAVe PAPER - Pleose do not print this e-moil unless obsolutely necessory All e-mail may be considered subl?d to the Publb Records Act and as such may be disclosed to a third-party requestor. Jrffersoqr County Dep*rtrnent ol 0omrnunity O*uelopment ffi sWuA.RHW,ffffi 1 il.EET} NO lffiffiffilfilllfiffilfi ffi[ffinfi$ffiHT;,-RE3fincE6 RElo 608.00Jollrmcr OentYr IA POPE ORDINANCE nruletiom for NO.0t-:100{-99_cpcrlio3tlrcintcrimdcvelopmcntcoolrolro(Ordinance l0-l2t,t-9iand:dogtiogn*&vclopment hc Pon Ludlorr Planncd Rcson Section-,3.40{ Il$ight-ReF,tric.{ions: No buitding or structure shall be erccted, enlarged or structumlly modified to exceed 35 fect in height, excluding roof projections, as mcasured bt UBC standards, except that Hotels and associated Conference Center faciliticg as specified in the Resort PIan (see section 3.90) may be allowed to a heiight not exceeding 50 feet as rmsured by UBC standards when the Jeflbrson County Fire District (#3) Iinds that fire-fightingard.tife safety issues have been adequately addressed. Section 3.4L5 Bulk and Dimcnsiongl Rtguircments: Bulk and dimensional requirements foi commercial uses in the MPR-RC/CF zone are contained in the table below. Singte family residential uses are subject to the requirements of section 3.10;that shall not bc required for single family attachcd development.are Tkil SECTION 3.50 VLLAGE COMMERCTAL CENTER ZONE (MPR-VC) Section 3.501 Puroose: The MPR-VC zone provides retail and comrnercial uscs and other services to meet the needs of resort visitors and commrmity residents. In addition to retail and commercial uses or services, other uses such as goverrunent or conununity offrces and facilities, long-term care facilities, rcsidential uses, and visitor services are permined within this zone. $ectiqL3.502 Permlfted Uses: The following uses are permitted in the MPR-VC zone: IVIPR.VC PERMITTED US ES RETAIL SERVICES OTHER Bank and Financial Institutions Travel Consultant Art Gallery Variety Stores Dry Cleaner/ Laundry Theater Grocery Stores Barber and Beauty Shops Post Offrce Hardware Stores GeneiaUBusiness Oflices Recycling Drop-off Facility Pharmacy and Drug Stores Pioftsiional Oflices Library Liquor Stores (state)Real Estate Museum Personal Medical Supply Stores Day Care Center Community Center Florist Shops CliniCs (Medical, Dental, Mental Health, C hiropractic) Police Facility Specialty Food Stores Social Services Fire Station Y ,vvbL , Density Minimum Lot Area Minimum LotWidth Front Yard Setback Side Yard Setback RearYard Setback Maximumlmpcrvious Coverage N/A N/A N/A UBC UBC UBC 5V/o Page 13 of 26 to the requirbments of section 3.30. 3089t3 US Hwy lOl, Brinnon WA 98320 (360) 796-46r r (8OO) 547-3479 Fox: (866) 848-4612 PLEASANT HAE&R) January9. 2017 \1..t.r\^ ^r,t (,\r:, (t,,,\ ir P H M P R D ev e lo p ment A e reement THIS AGREEMENT, by and between Pleasant Harbor Marina and Golf Resort LLP (Resort), any future owners and Jefferson County Fire District #4, DBA Brinnon Fire Department (Department) is designed to address impacts associated with development of the Pleasant Harbor Marina and Golf Resort (Resort), now under regulatory review by the County, not addressed by increased revenue from the proposed Resort and subject to supplemental mitigation to assure concurrency in accordance with the ordinance ofapproval, Ordinance 01-0128-08, paragraph 63(c), which provided a requirement that the SEIS review memoranda of understanding on appropriate mitigation for the following: To provide needed support for the Brinnon School, Fire District. Emereencv Service (EMS). Staff Housing, Police, Publ ic Health, Parks and Recreation and Transit. . . November 2007 FEIS 3.5.1.5 Fire Protection and Emersency Service Mitisations Any preliminary plat for the development of a portion of the resort shall require the following:1. Ensure the onsite water system will provide for adequate sustainable fire flow. 2. All resort buildings to include internal sprinkler systems with FDC connections. lncorporate Firewise site design standards in the layout ofthe proposed resort, as appropriate and approved by the local fire authority. 3. All subsurface parking will have to provide fire systems, including air handling, water, and emergency access and egress. 4. lnstall hydrants, two portable fire pumps with hoses and related fire suppression equipment at the marina and maintenance area as approved by the local flre authority. 5. Develop an 'emergency action plan" with the Fire District in conjunction with predevelopment, development, and operation to assure clear lines of responsibility and response in the event of any incident requiring emergency response. 6. Any development of the existing marina complex as part of an MPR shall include improving emergency vehicle access to this portion of the resort. 7. Through a memorandum of agreement with District #4, provide the equipment necessary to mount rescue and fire fighting operations on any structure over '18 feet from ground level, including but not limited to the Golf Terraces and Conference Center/Spa Building. 8. Enter into an "action plan" with the local lire authority at District#4 to assure coordinated control of additional services necessary to achieve an adequate level of service to the resort. 9. Provide a back-up electrical power supply to the resort to ensure continued operation of emergency systems and water supply during any outage. 10. Comply with the provisions of a memorandum of agreement with local service providers to address service equipment and personnel needs created by the resort, taking into consideratron increased tax revenues from the resort activity. 11. Enter into a memorandum of understanding with the local fire authority to address the following issues: . "Firewise" design standards. "Emergency action plan" for predevelopment and operational service for each phase of development . Provide necessary facilities to mount rescue and fire fighting operations in all phases of the resort . "Action plan" for coordinated control and additional services iL Page I ofl0 DEVELOPMENT AGREEMENT Pleasant Harbor Marina and Golf Resort Jefferson County Fire Protection Disttict #4W Draft (7) January 9. 2017M -a+** Purpose This agreement is to cover the cunent proposed impacts and their mitigations as it applies to the proposed Pleasant Harbor Master Planned Resort (PHMPR) at Black Point in Brinnon, Washinglon. The impacts in question are those that directly or indirectly affect the provision of fire and EMS services to the PHMPR. This agreement is to also address impacts identified in the 2007 FEIS as well as conditions ofthe Jefferson County Ordinance 0l-0128-08 General Requirements l. The Deoartments ResponsibiliW: l.l.To maintain Fire Headquarters at272 Schoolhouse Road as well as any necessary substations in the locations and at the capacities that the Board of Fire Commissioners of the Department deem appropriate in order to provide adequate fire and EMS coverage to the Brinnon Community. As well as to maintain all licenses and insurances to effect the same. l.2.Provide first due fire and EMS services to include equipment and personnel to over 1000 residential homes, a 2 sq mile commercial area, US National Parks, WA State Parks, private recreation areas as well as the proposed Pleasant Harbor Master Planned Resort (PHMPR). All contained within the l3l sq mile boundaries of the fire district. 2. The Resort's Resnonsibilitv 2,l.To provide mutually agreeable mitigation measures for all impacts on the fire & EMS services that the Department provides as identified with in the 2007 FEIS and Jefferson County Ordinance 0l-0128-08 as a result of the construction and continued operation of the PHMPR at Black Point. 2.2.The Resort agrees to comply with all negotiated mitigations at the start of each specified phase of construction. The mitigation will be considered complied with, when the mitigations are actually completed or a signed waiver has been executed by both parties involved. The waiver shall stipulate the reason for not meeting the negotiated mitigation as well as the mutually agreed upon solution. 2.3, General Access 2.3.1. All alarmed structures shall have a remote alarm enunciator panel located outside at the main entrance of the structure with a KNOX key box. Actual physical location shall be mutually agreed upon by the Department and the Electrical Engineer. 2.3.2. All structures within the PHMPR shall have KNOX box access. Page 2 of l0 DEVELOPMENT AGREEMENT Pleasant Harbor Marina and Golf Resort Jef/erson CounE Fire Protection District #4 @ Draft (7) Januarv 9. 2017M -a+** 2.3.3. Multi occupancy structures will have one centrally located KNOX key box at the buildings alarm enunciator panel. 2.3.4. All electric gates shall have KNOX key switches 2.3.5. All manual gates shall have KNOX padlocks. 2.3.6. FDC connections shall have KNOX FDC covers. 23.7. All roadways in the PHMPR shall be clearly marked so as to not allow any parking on the shoulders for any reason. The only exception will be a tumout adjacent to the path to G thru K dock for loading and unloading. 2.4. Aerial Aoparatus 2.4. l.The-Resort shall Lease/obtain and provide to the Department one aerial type apparatus with a reach ofnot less than 75 feet.lrn.aerial apparatus shall be no more then and atl0 years a chosen the the Department's expense. 2.4.2.The Resort shall provide a bond for the total cost ofthe aerial apparatus, to include the final lease payment prior to ownership, to ensure the Department will not be obligated under any circumstances for the lease payments ofthis equipment. The title for the aerial apparatus shall show the Department and the lease company as the legal owners ofthe apparatus and must also show the Department as the registered owner ofsame. 2.4.3. The aerial apparatus shall comply with the most current edition of the NFPA l90l "Automotive Fire Apparatus" as to all applicable chapters, [Vfla tet t "lnspection, Maintenance, Testing and Retirement of in Service Automotive Fire Apparatus" as to all applicable chapters and NFPA 1912 "Fire Apparatus Refurbishment" as to chapters. As to the construction, equipment and function ofsaid apparatus. applicable 2.4.4.5aid Aerial device shall comply with all Washington State Fire Apparatus Vehicle laws, with regards to weight and size. 2.4.5.The aerial apparatus shall be provided to the Department by the Resort fro later then the start ofvertical construction in phase I. 2.4.6.At such time as the Aerial device is ready for delivery the Resort will pay all fees required to secure the lease and delivery ofthe aerial apparatus after the Department has conducted the final inspection and has accepted delivery. 2.4.7 .The Department shall be solely financially responsible for all training of Department personnel in the safe operation, maintenance and testing ofsaid aerial app,uatus. 6 spoified rc more the 7 yws old. indushy standards for age./milwft orc Commented Dmftldcll: findto r6oMble Commented dofts. [dc2l: These sundards were not mentioned in I will research. don itemThis ig rep@ted to of th6 to would thethat bonotsuggest until framad abov6to th€ Page 3 of I0 DEVELOPMENT AGREEMENT Pleasant Harbor Marina and Golf Resort Jefferson County Fire Protection District #4W 2.4.8.After the Draft (7) January 9. 20l7May-l* has accepted the aerial apparatus [nd the aerial apparatus has been the and upkeep ofsaid apparatus. 2.5. General Requirements During Construction 2.5.l.The Resort shall provide to the Department the days before the anticipated of providing EMS hnd fire start of construction Ir for all future sum of$10,000.00 per quarter commencing 45 demolition to offset the cost responses the construction period. This amount will continue until the increase in Property Assessment reflected in the Resort's tax payments and the Resort has paid their property taxes for the year of the increase. 2.5.2.During construction of the Maritime Center offBlack Point Road and the Reunion House and Harbor View House, the Resort will provide reasonable access to the Department to conduct training and familiarization with the actual construction type of the buildings. This access is not to interfere with the construction ofthe structures and may be conducted after normal working hours. This is to include photographs by the Department at each phase ofconstruction as well as a complete set ofas built drawings for each type of building. 2.5.3.A11 entrances to structure within the PHMPR shall be designed so as to allow the ingress [imensions are 6 feet long by 2 feetandof the Department gumey. Said gumey Commented [dc4l: This @mment edded in dmfl 7, I don't s@ a problem with this. Commented [dcsl: Reduced price from $15,000 in previous drafts Comtnented [dc6l: Demolition wo not mentioned in prflious dmfts Commented [dc7]: Fire response not mentioned in previous drafls, EMS response was the shted reason for this expense in sll previous drafts This also include all elevators and The Resort ates that all entrances compliant as required by building codes. 3, Stase I Phase l- Marina Lands - Remodel of Maritime Village, Remodel exisisting pool and building, construct wastewater treatment plant, create construction materials processing site, conshuct water storage vault and associated piping, Construct first Co-generation unit and construct Marina access drive off Highway l0l. 3.1. Roadwavs: 3. L l.As a minimum all roadways shall be constructed in accordance with the Driveway and Road standards adopted by the Department in 1994. (See attachment l). Any deviation from standards will require a specific waiver, in writing, from the Department for each occurTence. 3.1.2. All roadways within the PHMPR shall be named in accordance with the most current edition of the Jefferson County 9l I Locator Ordnance. 3.2. FDC/[Ivdrants: Commentcd Page 4 of I0 DEVELOPMENT AGREEMENT Pleasant Harbor Marina and Golf Resorl Jefferson County Fire Prolection District #4W Draft (7) Januar.v 9. 2017M -a+** 3.2.1. The placement ofall fire hydrants through-out the PHMPR shall be approved by the Department prior to the infrastructure improvements 3.2.2.The FDC connection for the Marina Store, laundry and Docks A-F shall be placed on the upper roadway south of the store building with a minimum flow rate of 11500 CPM hydrant within 6 feet. As improvements are made to Docks A-C and E-F a dry standpipe system will be connected to this FDC location. 3.2.3. The existing FDC connection for docks G through K will be relocated to the shoulder area ofHighway l0l, north ofthe Marina entrance to facilitate tender shuttle operations for docks G through K. Specific design to be by mutually agreed upon between the Developer and the District. This fire protection service area shall be clearly marked and protected with bollards ofthe appropriate design. 3.2.4. Should section 3.2.3 not be possible due to failure to obtain WADOT approval the following shall apply; The Resort will install one 6 inch galvanized pipe from the FDC connections south of the Maritime Village to the exisisting FDC connection for docks G thru K. This pipe shall be dry and shall have a 5" Storz type fitting on each end. The fitting shall be clearly marked at the supply end as to what area it supplies. 3.2.5. There shall be a FDC connection within 6 feet ofthe hydrant on the upper roadway south ofthe store that will feed FDC connections for the FDC for D dock. The FDC shall be clearly marked as to the area it supplies. 3.2.6. There shall be a FDC connection within 6 feet ofthe hydrant on the upper roadway south ofthe store that will feed the future FDC connections for A through F docks. The FDC shall be clearly marked as to the arca it supplies. 3.2.7. All fire hydrants within the PHMPR shall have three ports, two ports shall be 2.5 inch NH thread and the steamer port shall be a 4 inch Storz type fitting. 3.2.8. All fire hydrants shall have a minimum flow rate of not less ttran IISOO GfVt confirmed by actual flow testing by the Department. Each hydrant shall be color as per NFPA 24 Annex D.Exceptions may be made to the flow rate by the District on a case by case basis,l*itt the exceptions noted in J.J, \\'astcn'atcr / Scwage Treatment Plant 3.3.1. DuringtheconstructionphaseofthewastewatertreatmentplanttheResortwill provide the Department with reasonable access for training. This access is not to interfere with the actual construction and may be conducted after normal working hours 3.3.2. The Department and the Resort will work together to develop an emergency response plan for the wastewater treatment and sewage treatment plant during its construction. 3.3.3.The Resort shall provide on-site, in a separate structure at the Agri-Center all necessary personnel HAZMAT equipment as required by State, County and industry standards. Page 5 of l0 I 200 CPM inCommented drafts l20O GPM inCommented dnfls This @mmflt not inCommented dmtu DEVELOPMENT AGREEMENT Pleasant Harbor Marina and Golf Resort Jefferson County Fire Protection District #4W Dralt (7) January 9. 201 TMaf-{4 The specific criteria and equipment to be identified in the Emergency Response Agreement. .1. Staec I Phase 2 - Nlarina Lands - Construct Marina Lofts 36 units, Construct Reunion House and Harbor View House 24 units, Highway l0l and Black Point Road improvements, Develop Second Well and Construct additional water storage vault. 4.1. Roadwavs: 4. I . I . As a minimum all roadways shall be constructed in accordance with the Driveway and Road standards adopted by the Department in 1994. (See attachment l). Any deviation from standards will require a specific waiver from the Department for each occurrence 4.l.2.All roadways within the PHMPR shall be named in accordance with the most current edition ofthe Jefferson County 9l I Locator Ordinance. 4.2. FDC/Hvdrants: 4.2.1 .The placement of all fire hydrants through-out the PHMPR shall be approved by the Department prior to the infrastructure improvements, 4.2.2,There shall be a fire within 500 feet of any occupied structure with a minimum flow rate Reference A 4.2.6._lf constructed this dry hydrant shall comply with NFPA ll42 and the Department connection will be placed no further then I 0 feet from the edge of the roadway. 4.2.3.There shall be an FDC lor all multi occupancy residential structures. The FDC shall be at the curb for each unit and within 6 feet ofthe fire hydrant. The fire hydrant shall have aminimumflowrateor|tsoocerv{-------- 4.2.4. FDC connectrons shall have KNOX FDC locks. Page 6 ol l0 1200 GPM inCommented 4.2.5 ht the meeting ll/lzl2}l},between the Fire Chief, Mr. Craig Peck - Engineer, Mr. Don Coleman and Mrs. Diane Coleman - PHMPR Representatives, it was agreed that this dry hydrant was not required. However, it may be desirable as a redundant emergency water supply. The Resort will consult with the Department, at a decision is made to install this dry standpipe to draft water from later date, the Commented [dc14]: Ar carth's request we deleted this itm in Drali 6. I do not see a problem leaving it o writen. I believe th€ final design ofthe fire flow system will dotemine ifthis is a reasonablo redundut option for warer supply. This would cost very little. DEVELOPMENT AGREEMENT Pleasant Harbor Marina and Golf Resort Jefferson County Fire Protection District #4W Draft (7) January 9. 20l7llg#-11 5. Stase II Phase l: Site Servicinq and Golf Course Construction and Road Network - Construct Wetlands Kettle C, Construct Golf Terrace & Conference Center/Sp4 Begin Golf Course Construction, 5.1. Roadwavs 5.1. l. As a minimum all roadways shall be constructed in accordance with the Driveway and Road standards adopted by the Department in 1994. (see attachment I ). Any deviation from standards will require a specific waiver, in writing, from the Department for each occurTence. 5. L2.All roadways within the PHMPR shall be named in accordance with the most current edition oithe Jefferson County 9l I Locator Ordinance. 5.2. FDC / Hvdrants 5.2. l. The placement of all fire hydrants through-out the PHMPR shall be determined by the Department prior to the infiastructure improvements 5.2.2. All fire hydrants within the PHMPR shall have three ports, two ports shall be 2.5 inch NH thread and the steamer port shall be a 4 inch Storz type fitting. 5.2.3.A11 fire hydrants shall have a minimum flow rate of not less ttranltsOO CfU confirmed by actual flow testing by the Department. Each hydrant shall be as per NFPA 24 Annex D. Exceptions may be made to the flow rate by the District on a case by case basis. 5.2.4.The FDC connections for each building sprinkler system or zone shall be accessible 2417 and must not be covered over. There shall also be a fire hydrant with a minimum sustainable flow rate ofltSOO CfU within 500 feet ofeach FDC connections 5.2.5.The FDC connections for each floor / wing ofthe GolfTerraces and Conference Center/Spa shall be placed at the NE comer and at the NW comer of the building, respectively. There shall also be a fire hydrant with a minimum sustainable flow rate of 1500 GPM hydrant within 6 feet ofboth connections. 5.3. General 5.3.1. AII alarmedstructuresshallhavearemotealarmenunciatorpanel locatedatthemain entrance. Physical location shall be mutually agreed upon by the Department and the Electrical Engineer. dntu 5.3.2. All structures within the PHMPR shall have KNOX box access. Page 7 of l0 Commented I2OO GPM dmfts DEVELOPMENT AGREEMENT Pleasant Harbor Marina and Golf Resort Jefferson County Fire Protection District #4 @ Draft (7) Januar),9. 2017M -ay-{* 5.3.3. Multi occupancy structures will have one centrally located KNOX key box at the buildings alarm enunciator panel. 5.3.4. All electric gates shall have KNOX key switches. 5.3.5. FDC connections shall have KNOX FDC covers. 6. Staee 2 Phase 2 - Golf Course & Residence Construction - Construct Golf Terraces units 2&3 220 units, Sea View Villas 57 units, Golf Vistas 28 units, Maintenance unit & Staff quarters 52 units, Complete Golf Course, Reconstruct Black Point Road, and Construct Sanitary Sewer Pumping Stations. 6.1, Roadwavs 6. I . I . As a minimum all roadways shall be constructed in accordance with the Driveway and RoadstandardsadoptedbytheDepartmentinl994.(Seeattachmentl). Anydeviation from standards will require a specific waiver from the Department for each occurrence. 6.l.2.All roadways within the PHMPR shall be named in accordance with the most current edition of the Jefferson County 9l I Locator Ordinance. 6.2. FDC / Hvdrants 6.2.1. Theplacementofallfirehydrantsthrough-outthePHMPRshallbeapprovedbythe Department prior to the infrastructure improvements 6.2.2. All fire hydrants within the PHMPR shall have three ports, two ports shall be 2.5 inch NH thread and the steamer port shall be a 4 inch Storz type fitting. 6.2.3.Al|fire hydrants shall have a minimum flow rate of not less than ll confirmed by actual flow testing by the Department, Each hydrant shall be as per NFPA 24 Annex D. Exceptions may be made to the flow rate by the District on a case by case basis. 6.2.4.The FDC connections for each building sprinkler system or zone shall be accessible 2417 and must not be covered over. There shall also be a fire hydrant with a minimum sustainable flow rate of[ SOO CfUt 6.3. General 6.3.1. Allalarmedstructuresshallhavearemotealarmenunciatorpanel locatedatthemain entrance. Physical location shall be mutually agreed upon by the Department and the Electrical Engineer. Page 8 of l0 1200 GPM inCommented Draft (7) January 9. 20l7Mayl* 6.3.2. All structures within the PHMPR shall have KNOX box access. 6.3.3. Multi occupancy structures will have one centrally located KNOX key box at the buildings alarm enunciator panel. 6.3,4. All electric gates shall have KNOX key switches. 6.3.5. FDC connections shall have KNOX FDC covers 6.3.6. Prior to the opening of the golf course at the end of Stage II Phase 2 the Resort shall have one ATV type vehicle equipped to transport a patient from out on the golfcourse to the ambulance. The Resort has agreed to provide an electric golfcart for EMS usage. The golf cart will need to be capable of carrying I full size stokes type patient litter with an EMS attendant and a driver. 7. Stase 2 Phase 3Golf Course [,ands Completion - Construct Golf Tenace 4 - 126 units, Construct Sea View Villas - 200 units, Construct Golf Vistas - 48 Units and Construct remaining sanitary pumping stations. 7,1. Roadwavs 7. I . I . As a minimum all roadways shall be constructed in accordance with the Driveway and Road standards adopted by the Department in 1994. (See attachment l). Any deviation from standards will require a specific waiver, in writing, from the Department for each occurrence. 7.l.2.All roadways within the PHMPR shall be named in accordance with the most current edition of the Jefferson County 9 I I Locator Ordinance. 7.2.FDC / Hvdrants 7 .2.1. The placement of all fire hydrants through-out the PHMPR shall be approved by the Department prior to the infrastructure improvements 7.2.2, All fire hydrants within the PHMPR shall have three ports, two ports shall be 2.5 inch NH thread and the steamer port shall be a 4 inch Storz type fitting. 7.2.3.A11fire hydrants shall have a minimum flow rate of not less ttran ISOO confirmed by actual flow testing by the Department. Each hydrant shall be color coded as per NFPA 24 Annex D. Exceptions may be made to the flow rate by the District on a case by case basis. 7.2.4. The FDC connections for each building sprinkler system or zone shall be accessible DEVELOPMENT AGREEMENT Pleasant Harbor Marina and Golf Resort Jefferson County Fire Protection District #4 @ 2417 and must not be covered over. sustainable flow rate ofll500 GPM There shall also be a fire hydrant with a minimum within 500 feet of each I2OO GPM dmfu Page 9 of l0 Commented l20O GPM inCommeDt€d DEVELOPMENT AGREEMENT Pleasant Harbor Marina and Golf Resort Jefferson County Fire Protection District #4 @ Draft (7) January 9. 2017Mai ** 7.3. General 7.3.1. All alarmed structures shall have a remote alarm enunciator panel located at the main entrance. Physical location shall be mutually agreed upon by the Department and the Electrical Engineer. 7.3.2. All structures within the PHMPR shall have KNOX box access. 7.3.3. Multi occupancy structures will have one centrally located KNOX key box at the buildings alarm enunciator panel. 7.3.4. All electric gates shall have KNOX key switches. 7.3.5. FDC connections shall have KNOX FDC covers. 7.3.6. Prior to the Final Inspection and issuance ofthe Certificate ofOccupancy, the Resort and the Department shall cooperate to develop an Emergency Response Protocol for all at the PHMPR. Aoproved By Jefferson County Fire District #4 Signature-Date Mr. Ronald Garrison Chairman of the Board of Fire Commissioners Signature- Mr. Kenneth McEdwards Fire Commissioner Signature- Mr. Meril Smith Fire Commissioner Approved By Pleasant Harbor Marina and ColfResort LLP Signature_ Mr. Garth Mann Date- Date- Date Page l0 of l0 commissioner Commented [dc21]: Item 7.3.7 regarding unforeseo imprct fee h* bem removed from the document s agr@d at the February