Loading...
HomeMy WebLinkAbout125Michelle Farfan From: Sent: To: Cc: Subject: Attachments: David W. Johnson < djoh nson @co jefferson.wa.us > Tuesday, )une L4,2016 2:53 PM Mike Nilssen David W. Johnson RE: Planning document PHMPR Baskets.ppt; PHMPR Chronology.doc Mike, Attached is some background information. I will also forward the current Planning Commission version of the regulations. Welcome aboard From: Mike Nilssen [mailto:nilssenSl@gmail.com] Sent: Tuesday, June 1.4, 2016 t:42 PM To: David W. Johnson <djoh nso n @co.jefferson.wa.us> Subject: Planning document Hello David: Can you send me all pertinent documents pertaining to tomorrows Planning Commission meeting. Thank you, Mike Nilssen 51 Harms Lane Port Ludlow, WA 98365 Nilssen5l@gmail.com (360) 473-3236 1 Programmatic EIS wAc 197-11-192 1 Non-project SEPA EIS BoCC Public Comment Completed January 2008 Today Project-level SE SEIS BoCC Pleasant Harbor MPR Review Phases 3 Administrative and Hearing Examiner Public Comment Pre-application Conferences for Development Permits 2 Public Comment Comprehensive Plan Amendment MPR Boundary 30 conditions Draft & Final SEIS Development Regulations - Zoning Amends JCC Title 17 Development Agreement (Contract between Applicant and County) Applications for Development Permits - Plat or Binding Site Plan - Forest Practice, Stormwater, etc. 4 Administrative Oversight (with Legislative action on ConsentAgenda) Complete PIaUBSP Build lnfrastructure Project Level EIS 5 Administrative Building Permits Programmatic EIS wAc 197-11-192 Comprehensive Plan (CP) Policy Guidance Conceptual Master Plan Change CP Land Use l\4ap to one color for B[VIPR Draft Environmental lmpact Statement (DEIS) Final Environmental lmpact Statement (FEIS) -Chapter 5: Mitigations. Shellfish. Water resources. Transportation. Rural character. Public services. Critical areas D Type V (Legislative) Review Planning Agency advises BoGC decision (January 14,2008) ase Project level EIS Phase 2 Supplement Environmental lmpact Statement (SEIS) Type V (Legislative) UDC Amendment Review PC Recommendation & BoCC Decision Zoning Regulations Zones (including open space and natural areas) Bulk and dimension Setbacks Height lmpervious surfaces Uses Development standards Zoning map (denoting zones with colors within BMPR) Development Agreement Requirement to have MOUs Land use and density Goals and Objectives Standards for review SEPA Vesting Phasing Amenities Disputes Must be consistent with CP, Land Use Map, and Adopting Ordinance a o Project Level EIS Applications for Development Permits P re-appl icatio n Co nferen ces PlaUBinding Site PIan (BSP) Preliminary Approval Forest Practice Class lV General "Conversion to another use" Permit Shoreline Permits Stormwater Permits. Entire site. Habitat plan Water System PIan Approval (DOE and DOH) Sewer Plan (DOE) Resort Plan Approval w/ construction-level detailo Buffers o Open space Mitigations Types l, ll, and lll (Administrative and Quasi-Judicia!) Review Administrative and Hearing Examiner Decisions Phase 3 Project Level E!S Final PIat/ Binding Site Plan approved by BoCC & recorded Phase 1 of Resort build-out starts I nfrastructu re Construction Roadso a Sewer . Water o Sewer treatment plant ype lV Review (Administrative Oversight with Legislative on Consent Agenda) Phase 4 Project Level EIS B u it d n g Permits Construct Buildings Open for Business! Phase 5 Type I (Administrative) Review o o O o o a o Pleasant Harbor Master Planned Resort Chronology 2002-20t6 The Brinnon Subarea Plan (BSAP) of 2002 identified the existing, yet idle NACO Campground on Black point (BSAP page 45) as an ideal location for a Master Planned Resort (I\rIPR). In October 2003, Black Point Properties applied for a Conditional Use permit (MLA03-00577) to re-establish a portion of the original 500 site NACO campground as a 60 site campground on 20 acres with existing septic and well water systems. That permit was issued on December 27, 2006. A pre-application conference for an MPR on Black Point was requested by The Statesman Group of Calgary, Alberta, Canada and held on January 10, 2006. On March 1,2006 The Statesman Group submitted to Jefferson County a Comprehensive Plan Amendment to re-zone a portion of Black Point from Rural Residential to MPR (MLA06-87). Initial Environmental Impact Statement (EIS) scoping, conducted in May 2006, identified probable signifi cant adverse impacts. On October 2, 2006, The Statesman Group, formally requested that the Environmental Impact Statement be changed from a permit-level, project EIS to a non-project, or programmatic EIS, necessitating the need for a Supplemental or project level EIS (SEIS) prior to development. In the fall of 2007, a citizen' s group opposing the project was formed, which eventually became known as the Brinnon Group. The Board of County Commissioners (BoCC) deliberated and voted to approve MLA06-87 on January 14,2008, under Ordinance 01-0128-08 with thirty attached conditions. In April of 2008, The Statesman Group applied for a Unified Development Code (UDC) Text Amendment and Development Agreement (MLA08- 00188) to implement the MPR. These Type V applications required an SEIS as condition (b) of Ord. No. 0l-0128-08. o On March 17,2009 DCD held a SEIS Team meeting to discuss and plan for "Scoping" of the SEIS with the Applicant's Representative Craig Peck, EIS writer Vicki Morris, and DCD's Peer Review Consultant Lloyd Skinner. o I public "Scoping Meeting" was held at the Brinnon School house on October 28th,2009 o On March 31,2010, DCD issued a Scoping Memo to Statesman defining the scope of the SEIS. . EIS writer Vicki Morris resigned from the Project on April 6,2011 o On April 20,201I DCD assumed authorship of the EIS "in-house." o DCD issued a revised Scoping Memo on October 12, 20ll to address applicant initiated changes to the alternatives of the project due to the adoption on new Shoreline regulations. o On July 3, 2012, DCD informed the applicant that it would be hiring a third par:ty consultant to draft the SEIS. o On February 11,2013, DCD signed a contract with EA Blumen (now EA Engineering) to author the SEIS. A contract extension required due to plan changes was approved and signed on March 16,2015. o { Draft SEIS was released for public and agency review and comment on November 19,2014. o Re-development and renovation of the Marina under an existing Binding Site plan began in May 2010 and was completed in April 2015. o In July 2015, the applicant revised the resort plan to include a new preferred altemative #3, which reduced the size of the golf course from 18 to 9 with a 3-hole practice course. This change necessitated re-review of environmental elements. o The Final SEIS was released on December 9,2015. The FSEIS may be appealed with the Ordinances for either the Development Agreement or Development Regulations as the associated final action. . The FSEIS and drafts of the Development Agreement and regulations were presented to the Planning Commission on January 6, 2016 to review, deliberate and make recommendation to the BoCC for approval, approval with modifications, or denial of the Development Regulations. o The BoCC may either accept the Planning Commission's recommendation, or hold their own public hearing on the development regulations, but they o must hold a public hearing before making a decision on the Development Agreement, anticipated in winter/spring 20 I 6. Should the BoCC approve the Development Agreement, development and building permits may be applied for.