Loading...
HomeMy WebLinkAbout193JEFFERSON COUNTY DEPARTIfr ENT OF CO[fr MUNITY T}EVELOPMENT 621 Sheridan Street, Port Townsend, WA 98368 | Web: www.co.jefferson.wa.us/communitydevelopment Tel: 360.379.4450 | Fax 360.379.4451 | Email: dcd@co.iefferson.wa.us SquareOI{E Resource Center I Building Permits & lnspections I Development Review | long Range Planning October 19,2016 Mr. Garth Mann, CEO Statesman Corporation 9300 E. Raintree Drive, Suite 100\ Scottsdale, AZ 85260 Re: Document dated August 19, 2016 "The Pleasant Harbor Marina and Recreation Community" Dear Mr. Mann The purpose of this letter is to get clarification regarding the status of the above-referenced document and to address next steps that the Statesman Corporation can take to move forward in the County's project application review process. The document entitled "The Pleasant Harbor Marina and Recreation Community was handed to Michelle Farfan, an Associate Planner on my staff, on October 3, 2016 by Don Coleman during a site tour of the Pleasant Harbor Resort and Marina project area. Later that same day, Mr. Coleman included a pdf of the document as an attachment to an email to Ms. Farlan recapping the site visit. The document was originally prepared and enclosed with a letter, dated September 19, 2016, from you to Jeromy Sullivan, Chairman of the Port Gamble S'Klallam Tribe (PGST). We are happy to consider the document Mr. Coleman provided to Ms. Farfan as a formal submittalto the County of proposed revisions to the project that was the subject of a Final Supplemental Environmental lmpact Statement (FSEIS). We understand that the proposed revisions are addressing, in part, the avoidance and minimization of potential impacts to tribal treaty rights that were raised by the Port Gamble S'Klallam, Tribe. We appreciate your etforts to arrive at a modified project proposal with respect to tribal treaty rights. We would appreciate confirmation that on October 3, 2016, Statesman did in fact intend to submit to the County "The Pleasant Harbor Marina and Recreation Community," dated August 19, 2016, as a project revision. ln December, 2015 a Final Supplemental Environmental lmpact Statement (FSEIS) was issued analyzing your proposed project's impacts on the environment, as information required by Washington's State Environmental Policy Act (SEPA) to support informed decision making by the County on approving Development Regulations and a Development Agreement for the Pleasant Harbor Master Planned Resort. Because Statesman is now proposing changes to the original project proposal that the FSEIS addressed, it is necessary to confirm whether the modified proposal is adequately addressed in the existing FSEIS, or whether an addendum or even a further supplement is necessary. The County understands Statesman's desire for County approval of Development Regulations and a Development Agreement, so you can move on to preparing building permit applications, but State law requires that this SEPA work be completed before the County can take action on the Development Regulations and the Development Agreement. The purpose of this letter is to request additional analysis and information regarding proposed revisions to site development and stormwater management. Specifically: 1. Consistent with Jefferson County Code (JCC) 18.22.240, a geotechnical report prepared by a licensed geotechnical engineer, a professional geologist, or a licensed professional engineer knowledgeable in regional geologic conditions with professional experience in landslide, erosion, or seismic hazard Mr. Mann Page2 October 19, 2016 evaluation shall address the bluff stability with the proposed new location of the stormwater retention facilities.2. A revised drainage plan/report that addresses the proposed new location and best management practices and design standards established in accordance with the Department of Ecology's Stormwater Management Manual shall also be submitted. Preparer for the drainage plan/report shall be prepared by a licensed professional engineer consistent with JCC 18.22.410. These actions will assist the County in determining the appropriate level of publication for the proposed revisions. To clarify: should this follow-up information reveal that the proposed revisions result in lesser impacts than those that were analyzed in the FSEIS, a State Environmental Policy Act (SEPA) addendum will be prepared and published. We cannot make that determination without the requested information described above. Several other items still need to be addressed regarding Ordinance 08-0128-08 (Comprehensive Plan Amendment creating the Brinnon Master Planned Resort). These items are identified in the FSEIS Table 3.18-1 and may require additional reports or updates. The County will schedule and host technical meetings to help facilitate getting these remaining items resolved. We ask for a formal representative from your group to participate in those technical meetings. The PGST and this office have already identified technical representatives (Roma Call and Michelle Farfan, respectively). This Department foresees these technical meetings as substantially facilitating and completing the remaining tasks (e.9., final draft development regulations, development agreement) before site development commences. We look forward to continuing to work with you. lf you have any questions or need anything further relative to this letter, please contact either myself or Michelle Farfan. Thank you for your prompt reply regarding your timeline to provide the additional requested information as soon as possible and a person to participate in the technical meetings. Sincerely, Patty Director Enclosure: FSEIS Table 3.18-1 Mr. Garth Mann, CEO Statesman Corporation 7370 Sierra Morena BLVD SW Calgary, Alberta, Canada T3H 4Hg Mr. Garth Mann Pleasant Harbor Marina 308913 Highway 101 Brinnon, WA 98320 Philip Morely, County Administrator David Sullivan, Commissioner, District 2 cc: 2 layout of the golf course in Altematives 2 ffi is also revised to reduce the amount of cut and f,lin"c"ssary as compared to Alternative 1, and more closely follow the existing topography- As well, Alternatives 1,2 ffi relocate the proposed Maritime Village out of the shoreline management area to a new location near U.S. Hwy 101. Redevelopment of the marina area is oermitted under an existing Binding Site Plan (BSP) which allows for re-modeling or completion of previously approved structures within their building footprints. As a result, a portion of the Maritime Village is no longer included as a part of the site and the overall site area analyzed in this SEIS is less than that analyzed in the 2007 EIS' Gompliance with BoGG Gonditions Table 3.18'1 below outlines allthi BoCC conditi several of these conditions that have yet to be finalized or would be addressed in the Development Agreement between the County and the Applicant Table 3.18-1 BoCG CONDITIONS BoGC Condition Measures lntended for Compliance ,Status a Any analysis of environmental imPacts is to be based on science and data pertinent to the Brinnon site. This includes rainfall projections, runoff projections, and Potential impacts on Hood Canal. The analysis of environmental impacts contained in the SEIS is based on site specific data, including rainfall projections, runoff projections and potential impacts to Hood Canal. See SDEIS Section 3.2, Water Resources, and Appendix F for more information. b All applications will be given an automatic SEPA threshold determination of Determination of Significance (DS) at the project level except where the SEPA- responsible official determines that the application results in onlY minor construction. The proposal was automatically g,.u"La oeteryi-ng,SX 9[5rg nmcance, io[latmg tnts ect-level lemental ElS. C The project develoPer will be required to negotiate memoranda of understanding (MOU) or memoranda of agreement (MOA) to Provide needed support for the Brinnon school, fire district, MOU's have been negotiated with Brinnon School District #46, Jefferson County Fire Protection District #4, Jefferson County Sherriff s Office, Jefferson Transit, Jefferson Healthcare, and Jefferson County (housing). The following MOU's are in draft form and/or have P I e asant Harbo r F,i n a l. S u p p I em e ntal El S December2|l5-' 3.18'2 3.Ttteasant fiatt BoCC Condition{';. - *1.- . - ^ I H Status Emergency Medical Services (EMS), housing, police, public health, parks and recreation, and transit prior to approval of the development agreement. Such agreements will be encouraged specifically between the developer and the Pleasant Harbor Yacht CIub, and with the Slip;,., owner's Association regarding marina use, costs, dock access, loading and unloading, and parking. No MOU has been negotiated for parks and recreation; however, public amenities are proposed within the development (see Conditions 63d below). Some of the MOU's are in draft form and have yet to be signed by the Applicant and agency/district. The marina area has been removed from the SEIS site boundary, as this area is now subject to an existing Binding Site Plan, which does not require additional environmental review. As the upland marina area is no longer being reviewed under this SEIS, no agreements have been negotiated with the Pleasant Harbor Yacht Club or the Slip owner's Association. yet to be signed by the agency/district: Fire District; Sherriffls Office; Jefferson Transit; and Housing (County). The MOU with Jefferson Healthcare and Brinnon School District have been signed by the appropriate agencies. d A list of required amenities shall be in the development agreement along with conditions for public access A list of amenities that would be provided as part of the proposal is summarized in Chapter 2 of this SEIS, with a detailed list in Appendix S. Public access conditions shall be included in the Development Agreement between the Applicant and the County. u*$,Q"e**{s oe addressed in the Development Agreement e Statesman shall advertise and give written notice at libraries and post offices in East Jefferson County and recruit locally to fill opportun ities for contracting and employment, and will prefer local applicants provided they are qualified, available, and competitive in terms of pricing. This condition shall be negotiated in the Development Agreement between the Applicant and the County. be addressed in the Development Agreement f Statesman will prioritize the sourcin g of construction materials from within This condition shall be negotiated in the Development Agreement between the be addressed in the Devel ent l 3J&'i,i;'rarri i. rr';.ir t- BoCC Conditions # I I I I I I I Pleasant Harbor Final,Supplemental EIS - . ' ;)v=-'-:--r; ';.: - l Jefferson County.Applicant and the County Agreement The developer shall commission a study of the number of jobs expected to be created as a direct or indirect result of the MPR that earn 80% or less of the Brinnon area average median income (AMl). The develoPer ghall provide affordable housing (e.9., no more than 30o/o of household income) for the Brinnon MPR workers roughly proportional to the number of jobs created that earn 80% or less of the Brinnon area AMI. The developer may satisfY this condition through dedication of land, payment of in lieu fee, or onsite housing development. A study on the number of jobs expected to be created as a result of the MPR was completed: Summary of Pleasant Harbor lmpacts: Job Creation and Value Added to National Economy (2012). The report is included in this SEIS as Appendix N. Of the 890 housing units proposed as part of the project, 52 units would be staff housing for resort employees. availability of affordable employee housing for positions earning less than 80% of the AMI shall be addressed in the Housing MOU. The g The possible ecological impact of the develoPments water plan that alters kettles for use as water storage must be examined, and PossiblY one kettle preserved. The2012 Grading and Drainage Report (Appendix E) includes an analysis of the interconnection between stormwater, water storage, irrigation, groundwater recharge, and wetlands. The SEIS identifies the retention and enhancement of the wetland contained within Kettle C. See Section 3.2, Water Resources, for a summary of this analysis. h An aquifer test was conducted by the Subsurface Group in 2008 and subsequent analysis by the Pacific Groundwater Group was performed in 2009. These analyses, which are incorporated into this SEIS, were confirmed by the Department of Ecology in 2010 (Appendix F). See Section3.2, Water Resources, for a summary of i Any study done at the Project level pursuant to SEPA (RCW 43.21C) shallinclude a distinct report by a mutually chosen environmental scientist on the impacts to the hydrology and hydrogeologY of the MPR location of the develope/s intention to use one of the existing kettles for water storage. SaLdEPgrt P teasdnt H arborFi n dl S u p p le m enta ! El S December2ift- - 3-18-4 -1 3'1PgilF.a;ti.I,ta;. BoCC Conditions''- ---"^.. BoCG # Gondition Status shall be peer-reviewed by a second scientist mutually chosen by the developer and the county. The developer will bear the financial cost of these reports. these analyses j Tribes should be consulted regarding cultural resources, and possibly one kettle preserved as a cultural resource. Six tribes were consulted regarding the proposed Cultural Resource Management Plan and three tribes concurred. See Appendix O for copies of email correspondence. k As a condition of development approval, prior to the issuance of any shoreline permit or approval of any preliminary plat, there shall be executed or recorded with the County Auditor a document reflecting the developer's written understanding with and among the following: Jefferson County, local tribes, and the Department of Archaeology and Historical Preservation, that includes a cultural resources management plan to assure archaeological investigations and systematic monitoring of the subject property prior to issuing permits; and during construction to maintain site integrity, provide procedures regarding future ground- disturbing activity, assure traditional tribal access to cultural properties and activities, and to provide for community education opportunities. To avoid potentially adverse impacts to cultural resources, periodic archaeological monitoring would be cdrried out during construction excavations and other below-fi11, ground- disturbing project actions. Monitoring would occur at those locations within the site area that have previously been identified as high probability areas (i.e., kettles, vantage points, and bluff edge) until it could be determined with greater assurance that continual monitoring would not be necessary. Monitoring results would be reviewed with Department of Archaeology and Historic Preservation staff and tribal representatives prior to adjusting the monitoring schedule. See Appi-bndix O of this SEIS for details of the monitoring plan. the monitoring plan, along with the letters of concurrence, shall be executed or recorded with the County Auditor prior to approval of the Development Agreement. I A wildlife management plan focused on non-lethal strategies shall be developed A Habitat Management Plan was completed January 27, 2012 by GeoEngineers. See Appendix H I I I I I I I I t F lb asa nt, H a rbo r F i n a{E dppletn ental El 51,.I 3.7Pltas**r, li.tttl'_;.* BoCC Co'nditi6ns--I --' r':./ r'r-r I ! and Section 3.4, Fish and Wildlife, of this SEIS for additional detail. consultation with the Department of Fish and Wildlife and localtribes, to prevent diminishment of tribal wildlife resources cited in the Brinnon Sub- Area Plan (e.9., deer, elk, cougar, waterfowl, osprey, eagles, and bear), to reduce the Potential for vehicle collisions on U.S' ighway 1Q1, to reduce the conflicts resulting from wildlife foraging on high-value landscaping and attraction to fresh water sources, to reduce the dangers to predators attracted to the area by prey or habitat, and to reduce any danger to humans. in the public interest in Water rights have been negotiated and a permit received from Department of Ecology (G2-30436). An adequate water supply has been determined to be available. See Section 3.16, Utilities, of this SEIS for additional detail. No deforestation or g will be permitted Prior to establishing adequate water rights and an adequate water supply. radingm Water rights permit G2-30436 granted for (3) wells on the Pleasant Harbor site - (1) year round domestic & commercial, (2) summer inigation - total of 300 gallons per minute. See Section 3.16, Utilities, of this SEIS for additional detail. Approval of a Class System by the Washington Department of Health, and approval of a Water Rights Certificate bY the DePartment of Ecology shall be required prior to applying for anY Jefferson CountY Permits for plats or any new development. A Watern Water quantity issues are addressed in this SEIS in Section 3.16, Utilities, and water quality in Section 3.2, Water Resources. Refer to Appendix F of this SEIS for o Detailed review is needed at the project-levelSEPA analysis to ensure that water quantity and water qualitY issues are addressed. The water useestimated ;, Fleasantllarbor Final Supplemental E'S 3.,1*lga*ant t{a;.i BoCC Conditiont r.),,, - ..December 2015 'l 3.18-6 I I I I ! I I I I T fl Condition :' Measures lntended for: Gomptiance Status is based on a daily residential demand used to establish the Equivalent Residential Units (ERU) for the development using a standard of 175 gallons per-day (gpd). The goal of the development is 70 gpd. All calculations for water use at any stage shall be based on the standard of 175 gpd. additional detail on Water Resources. The water rights approval based is on 175 gallons per day per equivalent residential unit. See page 8 of the DOE report for reference that is contained in Appendix F of this SEIS. p An NWP shall be established that requires Statesman to provide access to the water system by any neighboring parcels if saltwater intrusion becomes an issue for neighboring wells on Black Point, and reserve areas for additional recharge wells will be included in case wells fail, are periodically inoperable, or cause mounding. A Neighborhood Water Policy was drafted and reviewed on January 2011, butis notyet finalized (SEIS Appendix F). The NWP iiit6ii'd6d ffi oe nnatiililrioi to approval of the development agreement. q Stormwater discharge from the golf course shall meet requirements of zero discharge into Hood Canal. To the extent necessary to achieve the goal of designing and installing stormwater management infrastructures and techniques that allow no stormwater run-off into Hood Canal, Statesman shall prepare a soil study of the soils present at the MPR location. Soils must be proven to be conducive to the intended infiltration either in their natural condition or after amendment. Marina discharge shall be treated by a system that reduces contamination to the greatest possible extent. The soil study has been completed (Subsurface Group, LLC. November 21,2008) and the infiltration rates to be used for final design of stormwater facilities are presented in the 2012 Grading and Drainage Report (SEIS Appendix E). No stormwater from the golf course fairways would discharge to Hood Canal. See Section 3.2, Water Resourceq:pf this SEIS for additional detail. . I 3'78'tt:,".: '! t:,' BoCC Conditions r;.,'''mn+'#Pleasant Harbor FinahSupplemental E/Sr 1r:":;" 5-r-'.- Decembeiffi7l'$c -.+:'" ;:;;' 3.18-7 ?' ,BoGG #. A draft Water Quality Monitoring Plan was completed by the applicant and reviewed by the Jefferson County Water Quality Department in June 2011 (SEIS l\ppendix F). A County-based comprehensive water q ualitY monitoring Plan sPecific to Pleasant Harbor requiring at least monthly water collection and testing will be develoPed and approved in concert with an adaptive management program prior to anY site- specific action, utilizing best available science and appropriate state agencies. The monitoring Plan shallbe funded by a YearlY reserve, paid for by Statesman, that will include regular offsite sampling of Pollution, discharge, and/or contaminant loading, in addition to anY onsite mon me. Plan requires finalization and approval prior to approval of the Development Agreement The draft r The developer must ensure that naturalgreenbelts will be maintained on U.S. HighwaY 10'1 and as apPropriate on the shoreline. Statesman shall record a conservation easement protecting greenbelts and buffers to include, but not be limited to, a 200-foot riparian buffer along the steeP bluff along the South Canal shoreline, the strip of mature trees between U.S. HighwaY 101 and the Maritime Village, wetlands, and wetland buffers. Easements shall be perpetual and irrevocable recordings dedicating the property as natural forest land buffers. Statesman, at its expense, shall manage these easements to include removing, when aPProPriate, naturally fallen trees, and replanting to retain a natural visual separation of the The proposal includes preserving a riparian buffer along the south/southwest bluff of the peninsula. This buffer would permanently preserve the 200-ft wide Shoreline Environment and a steep slope setback (up to an additional 30 feet wide in places) in a conservation easement. Note that redevelopment for maintenance, repair and renovation in the Marina Center (marina upland) area is now limited to occur within,existing building footprints, under a separate existing Binding Site Plan permit. The Maritime Village building is now proposed to be located north of the Black Point Road and U.S. Highway 101 intersection. These S ) 1) P leasant' Harhar; F ih al S upp I em e nta I E I S December 2015 3-18-8 r 3.1&tea_s?rtt B o C C C o n d i ti o n Sa; r-^ --;' ri&rb.. 3oGG # Condition easements shall be finalized and recorded prior to approval of the Development Agreement. I BoCG # Condition I status development from Highway 101. The mariha operations shall conduct ongoing monitoring and maintain an inventory regarding Tunicates and other invasive species, and shall be required to participate with the County and state agencies in an adaptive management program to eliminate, minimize, and fully mitigate any changes arising from the resort, and related to Pleasant Harbor or the Maritime Village. An lnvasive Tunicate Monitoring Agreement between the applicant and the Department of Fish and Wildlife was drafted in October 2010 (SEIS Appendix l). See Section 3.5, Shellfish, of this SEIS for additional detail This agreement shall be finalized prior to final BoCC approval of the Development Agreement. u ln keeping with the MPR designation as located in a setting of natural amenities, and in order to satisfy the requirements of the Shoreline Master Program (JCC 1 8.1 5.1 35(1 ),(2),(6), the greenbelts of the shoreline should be retained and maintained as they currently exist in order to provide for "the screening of facilities and amenities so that all uses within the MPR are harmonious with each other, and in order to incorporate and retain, as much as feasible, the preservation of natural features, historic sites, and public views." ln keeping with Comprehensive Plan Land Use Policy 24.9,the site plan for the MPR shall "be designed to blend with the natural setting and, to the maximum extent possible, screen the development and its impacts from the adjacent The proposal includes preserving a riparian buffer along the south/southwest bluff of the peninsula. This buffer would permanently preserve the 200-ft wide Shoreline Environment and a steep slope setback (up to an additional 30 feet wide in places) in a conservation easement. The proposal includes landscaping throughout the site, including reuse of healthy trees and shrubs. See Section 3.3, Plants, of this SEIS for additional detail regarding retention"of existing trees and vegetatioii. and transplanting of viable trees and vegetation within the development. Decembe?2W'f.'=:--'' 3.18-9 r:3.1biet:. ;,, ;-i 1, ;v,:,,BoCC Cdnditions- I Measures lntended for ' , ,, Compliance t rural areas." Evergreen trees and understory should remain as undisturbed as Possible- Statesman shall infill Plants where apProPriate with indigenous trees and shrubs. ln order to blend into the terrain, the largest structure within the Maritime Village area (Maritime Village Building, no longer located at the marina but near Black Point Road) would be built into the existing topography, with two stories visible from U.S. Hwy 101 to the west and three stories visible internalto the site. Areas of disturbance would include transplanted healthy vegetation from the site, as well as native and low water consumption plants. See Sections 3.3, Plants, and 3.15, Aesthetics, of this SEIS for additional detail. The landscape plan for the single Marina Village Building will provide native vegetation plantings islands in the parking area and along the U.S. Hwy 101 and Black Point Road rights- of- way, while providing adequate visual access from the highway needed for the retail/commercial structure. The building will be placed near the rear property line and.. adjacent to the stream buffer. to take advantage of the sloped area of the site. The stream buffer vegetation will be enhanced after removing invasive plant species. Building architecture will share similar features to those at the marina and within the golf resort. ln keeping with an aPProved landscaping and grading plan, and in order to satisfY the intent of JCC 18.15.135(6), and with special emPhasis at the Maritime Village, the buildings should be constructed and Placed in such a way that theY will blend into the terrain and landscape with Park-like greenbelts between the buildings. v been co eted for health and An individualtree survey has not in Construction of the MPR bui will be com w F.leasanbHarb.qr December 2015 Firta! Supplernenta!,,i.r * o 3.l04.eiiasar! *l*rtj BoCC Conditions-;,.-., ;*l: -^ , I BoCG # a manner that strives to preserve trees that have a diameter of 10 inches or greater at breast height (dbh). An arborist will be consulted and the ground staked and flagged to ensure the roots and surrounding soils of significant trees are protected during construction. To the extent possible, trees of significant size (i.e., 10 inches or more in diameter at breast height (dbh)) that are removed during construction shall be made available with their root wads intact for possible use in salmon recovery projects. size, but during construction, viable trees within proposed development areas that can be transplanted would be relocated on a temporary basis to an on- site nursery located in the western edge of the development. These trees would be irrigated and cultivated until replanting is possible within designated areas of the development. See Section 3.3, PIants, for additional detail. lndividualtrees will be inventoried to account for size and health prior to construction for viability of transplanting per the arborist report and tree protection plan x Statesman shall use the LEED (Leadership in Energy and Environmental Design) and "Green Built" green building rating system standards. These standards, applicable to commercial and residential dwellings respectively, "promote design and construction practices that increase profitability while reducing the negative environmental impacts of buildings, and improving occupant health and well- being." The Narrative Demonstrating Compliance with the lntent of LEED standards is provided in Section 3.8, Energy and Natural Resources, and Appendix K of this SEIS and addresses this condition. v There shall be included as a best management practice for the operation and maintenance of a golf course within the MPR that requires the developer to maintain a log of fertilizers, pesticides, and herbicides used on the MPR site, and this information will be made The Golf Course Development Best Management Practices (SEIS Appendix F) are intended to comply with the Jefferson Coun$ Code Chapter 18.20, Part 190 Performance and Use- Specific Standards for golf courses. The development agreement will address the maintenance of the golf course chemical appliqation tog. I I I i I P I e a s a n t H a rbo r F i n a E S tfi p I e m e nta l,El S- : i rte ! Su p p !a-!n ::. )': :- ;:. : ; DecembCr.XIiS'';,', '.;':.;*-- 3.18-11 . 3.1Pla:;ii-r-:i i;;i*r.:l BoCC Conditions " 'n-\4' .q'4{ Measures lntended for Gompliance ' Status ' aocG I#_L Measures.lntended for Gompliance Status available to the public. z aa Statesman shall use the !nternational Dark SkY Association (lDA) Zone E-1 standards for the MPR. These standards are recommended for "areas with intrinsically dark landscaPes" such as national parks, areas of outstanding natural beautY, or residential areas where inhabitants have exPressed a desire that all light tresPass be limited. ln fostering the economY of South Jefferson CountY bY promoting tourism, the housing units at the Maritime Village should be limited to rentals and time-shares; or, at the very least, it should be mandated that each section be required to keeP the ratio of 65% to 35% of rental and time-shares to Permanent residences per JCC 18.15.123.(2). General guidelines that would be followed to minimize potential light and glare impacts include the following: a a a a a lllumination would be to the minimum practical level. The affected area of illumination would be as confined to specific areas as practical. The duration of illumination would be as short as practical for Resident Safety. lllumination technology would minimize the amount of blue spectrum in the light. Technology would utilize High Efficiency Lighting Standards (Energy Star Guidelines). See Section 3.14, Light and Glare, of this SEIS for further information. Alternative s 1, 2 ?n*Q include 890 units, including 52 units for staff housing. To meet the BoCC conditions of approval of the MPR, the majority of this housing (67%) would be for short-term visitors and 33% would be for permanen! residents. See Sectioii,3.11, Housing and Employment, of this SEIS for additional detail. bb Verification of the abilitY to provide adequate electrical power shall be obtained from the Mason CountY Public Utility District. A report is currently being drafted with the Mason County PUD but will not be complete until after the scheduled issuance of this Draft SEIS. This report will address the demand, The Applicant in conjunction with Mason County PUD willcomplete the report on the capacity of ,F.lea:san&Harbon Einal Supplein entat El S December2t'|T 3.18-12 3, fFl;;rSaraj, ].iar* B o Ce Co nd iti o ngr.- : i- =;:' ---- ;*3,,:'L..-;;lit BoCG # Condition Status capacity and availability of electric power from the PUD. See Section 3.8, Energy and Natural Resources, for additional detail. infrastructure to serve the energy demands of the project prior to approval of the Development Agreement cc Statesman Corporation shall collaborate with the Climate Action Committee (CAC) to calculate greenhouse gas emissions (GHGs) associated with the MPR, and identify techniques to mitigate such emissions through sequestration and/or other acceptable methods. A Greenhouse Gas Emissions Report was prepared for the Draft SEIS by Failsafe Canada (May 2012) that reviewed and analyzed the source GHG emissions for the first flve year construction period of development, as well as the annual emission profile when in full operation, of the project under Alternative 2. The report is included in this SDEIS as Appendix M. Numerous potential mitigation measures are identified and detailed in Section 3.10, Air Quality/GHG and Appendix M of this SEIS. dd Statesman Corporation is encouraged to work with community apprentice groups to identify and advertise job opportunities for local students. I I Prelimin ary Zoning Regulations Jefferson County has drafted a preliminary set of draft zoning regulations for the Brinnon MpR designation, labeled the Brinnon MPR code (JCC 17.60-17.80, Appendix S). The zoning regulations would be adopted prior to approval of the preliminary plat for the Pleasant Harbor Golf Course Resort. The zoning regulations set a cap of 890 residential units and 125,000 square feet of commercial and conference space. Alternatives 1, 2 mm of this SEIS include the maximum number of residential units allowed under this proposed zoning (890 units), but propose significantly less than the 125,000 square feet of commercial/conference space allowed under the preliminary zoning (49,772 sq. ft. under Alternative 1 and 56,680 sq. ft. under Alternatives 2 ffi|). H L I I I I3.19..- -ia-i; #.:r.si;r , BoCC Conditioni :- ""' I Pleasant Harbor Fina4stipplemental:ElS, -iiri; S .'-,r-'E-iri?.!:",; :"j '' Decembeir*oTi ---- 3.1t-13 . -i '' Related. to, condition (e)