Loading...
HomeMy WebLinkAboutBLD2021-00236 - 05 Approved Stormwater______2,210 ______1,217 ______3,427 *Edits by DCD (A.H, 07/07/2021* _____3,427 3,427_____ ______2,210 *Edits by DCD (A.H, 07/07/2021)* Worksheet B1 Construction Protection: Medium and Large Projects(SWPPP: Stormwater Pollution Prevention Plan) C102 Buffer Zone C103 High Visibility Fence C233 Silt Fence C231 Brush Barrier C234 Vegetated Strip Applicant or Representative Signature Element 13: Protect Low Impact Development BMPs page 6 of 6 The goal of this element is to protect permanent stormwater management BMPs from siltation and compaction during construction. The permanent stormwater management BMPs used for runoff from roofs and other hard surfaces include: full dispersion, roof downspout full infiltration or dispersion systems, perforated stubout connections, rain gardens, bioretention systems, permeable pavement, sheetflow dispersion, and concentrated flow dispersion. Methods that will be used to protect permanent stormwater management BMPs include: Sequencing the construction in a fashion to install these permanent BMPs at the latter part of the construction grading operations, Excluding equipment from the BMPs and the associated areas, Using the erosion and sedimentation control BMPs listed below to protect facilities such as drywells, raingardens, permeable pavement, or bioretention from accumulating sediment during construction and before site restoration. If this option is selected check the BMPS you will use below: Other Jun 16 2021