Worksheet B1
Construction Protection: Medium and Large Projects(SWPPP: Stormwater Pollution Prevention Plan)
C102 Buffer Zone C103 High Visibility Fence
C233 Silt Fence
C231 Brush Barrier
C234 Vegetated Strip
Applicant or Representative Signature
Element 13: Protect Low Impact Development BMPs
page 6 of 6
The goal of this element is to protect permanent stormwater management BMPs from siltation and compaction
during construction. The permanent stormwater management BMPs used for runoff from roofs and other hard
surfaces include: full dispersion, roof downspout full infiltration or dispersion systems, perforated stubout
connections, rain gardens, bioretention systems, permeable pavement, sheetflow dispersion, and concentrated
flow dispersion.
Methods that will be used to protect permanent stormwater management BMPs include:
Sequencing the construction in a fashion to install these permanent BMPs at the latter part of the
construction grading operations,
Excluding equipment from the BMPs and the associated areas,
Using the erosion and sedimentation control BMPs listed below to protect facilities such as drywells,
raingardens, permeable pavement, or bioretention from accumulating sediment during construction and
before site restoration. If this option is selected check the BMPS you will use below:
Other
Jun 16 2021