HomeMy WebLinkAbout080921cabs01 Department of Public Works
County Administrators Briefing
Page 1of1
Jefferson County
Board of Commissioners
Agenda Request
To: Board of Conimis'sioners
Mark McCauley, Interim County Administrator
From: Monte Reinders, P.E., Public Works Director/County Engine
Agenda Date: August 9, 2021, 1:30pm
Subject: Parks and Recreation Workshop
Description:
The Public Works Department, Parks and Recreation Division, wilt provide a briefing
regarding capital improvement projects, the Jefferson Universal Movement
Playground (JUMP !), and operations. Monte Reinders, Public Works Director/County
Engineer, and Matt Tyler, Parks and Recreation Manager, will attend.
Statement of Issue:
Specific information will include: a parks and recreation preliminary draft capital
improvement plan (CIP); an analysis of park inventory, use levels, and maintenance
resource requirements; and an update on the current cost estimates and revenue
sources for the JUMP! project.
Analysis:
The workshop format will allow for presentation of information, discussion, and a
question and answer period.
Fiscal Impact:
Not applicable for this workshop.
Recommendation:
No specific actions are requested.
Reviewe By:
. V4/ -
Mark McCau , Interim County Ad n strator Dat
29-Jul-21
Preliminary Working Draft, Parks and Recreation Capital Improvement Plan
Value in $1000
Location
Sub -Site
Scope
Save
Improve
1
1
PT Community Center Building
Gym
Interior improvements - lights, basketball goals
$ 85
2
11
PT Community Center Building
Gym
Structural repair the floor, replace floor
$ 380
3
11
PT Community Center Building
Gym
Replace the roof
$ 600
4
1
Chimacum Park
Shelter
Remove existing picnic shelter, place tables
5
1
Chimacum Park
Main trail (old road)
Grade, gravel, improve as a multiple purpose trail
$ 12
6
1
Chimacum Park
Entrance/parking area
Re -configure, install hardscape, grade & gravel
$ 8
7
1
Courthouse Park
Basketball court
Replace missing backstop, check standards
$ 4
8
1
Courthouse Park
Tennis courts
Convert to pickleball
$ 24
9
11
East Beach Park
Shelter roof
Professional pressure wash roof
$ 2
10
11
East Beach Park
Shelter foundations
Repair foundations
$ 8
11
1
East Beach Park
Shelter walls (wood)
Repair and paint
$ 2
12
1
East Beach Park
Shelter fireplace
Evaluate and repair
$ 3
13
1
East Beach Park
Parking lot grade/gravel
Repair, gravel, grade
$ 5
14
1
East Beach Park
Retaining wall
Basic repairs
$ 8
15
1
Lake Leland Day Use
Complete WDWF Project
Work with them to complete existing scope
$ -
$ -
16
1
Lake Leland Day Use
Fishing trail
Remove old fire pit
$ 1
17
1
Gibbs Lake
Caretakers residence
Garage electrical system - install
$ 12
18
1
Gibbs Lake
Existing trails
Evaluate and repair (Volunteer Donation)
V
19
1
HJ Carroll Park
Athletic Fields
Annual field treatment, sand, seed, aerify
$ 14
20
1
HJ Carroll Park
Restroom
Repair or replace the roof
$ 24
21
1
HJ Carroll Park
Playground
Increase county contribution - complete entire
playground
$ 563
22
1
HJ Carroll Park
Athletic fields
Professional evaluation of irrigation system
$ 5
23
1
HJ Carroll Park
Athletic fields
Repair or replace the irrigation system
$ 175
24
1
HJ Carroll Park
Salmon shelter
Surface the floor, improve ADA access
$ 12
25
1
HJ Carroll Park
Basketball courts
Repair cracks, repaint courts
$ 30
26
1
Indian Island Park
Portage shelter
Evaluate, design for replacement
$ 20
27
1
Irondale Community Park
Athletic field irrigation
Professional evaluation of irrigation system
$ 5
28
1
Irondale Community Park
Athletic field irrigation
Replace irrigation system
$ 75
29
1
Irondale Community Park
Playground
Replace (RCO Match)
$ 150
301
1
Memorial Field
Athletic field
jAnnual field treatment, sand, seed, aerify
$ 12
31
1
Memorial Field
Back perimeter fence
Replace with chain link or similar
$ 65
32
1
Memorial Field
Quincy perimeter fence
Replace with wood
$ 45
33
1
Memorial Field
Quincy corner gate
Pull back, improve sight lines & access
$ 15
34
1
Memorial Field
Washington perimeter fence
Replace with wood
$ 40
35
1
Memorial Field
Monroe perimeter fence
Replace with wood
$ 40
36
1
Memorial Field
Grandstand
Check concrete structure for spalling and repair it
$ 15
37
1
Upper Oak Bay Campground
Caretakers site
Move to near day use parking area
$ 2
38
11
Upper Oak Bay Campground
Caretakers site
Install septic holding tank
$ 18
39
1
Quilcene Campground/Park
Campground systems
Install additional water supply spigots
$ 10
40
1
Gibbs Lake
Caretakers residence
Decomission or improve fireplace
$ 4
41
1
Gibbs Lake
Caretakers residence
Install heating system/heat pump
$ 10
42
1
HJ Carroll Park
Playground
Rebuild or remove the Kyle Thies playground
$ 6
43
1
Quilcene Campground/Park
Playground
Replace (RCO Match)
$ 175
44
1
Subtotal
$ 2,071
$ 613
45
Chimacum Park
Campground
Install campsites
$ 80
46
Chimacum Park
Campground
Install electrical hook ups to campsites
$ 45
47
Chimacum Park
Campground
Install water supply to campground
$ 21
48
Chimacum Park
Campground
Install restroom building with showers
$ 450
49
Chimacum Park
Shelter
Restore or Replace Picnic Shelter
$ 140
50
Chimacum Park
Adjacent Property
Transfer or lease to expand campground
51
Lake Leland Campground
Highway signage
Improve
52
Lake Leland Campground
Systems
Install water supply
$ 39
531
1 Lake Leland Campground
Systems
Install power supply to campsites
$ 120
54
Lake Leland Campground
Camp host
Install camp host site with full hook-ups
$ 34
55
Gibbs Lake
Caretakers residence
Replace fence
$ 6
56
Gibbs Lake
Caretakers residence
Remove unneccesary sheds
$ 3
57
Gibbs Lake
Mountain Bike Trail System
Plan and build
$ 180
58
Gibbs Lake
Multiple Purpose Trails
Expand multi use single track trails
$ 35
59
IGibbs Lake
Beausite area parking
Install trail access parking on Beausite Road
$ 25
60
Gibbs Lake
Beausite old house area
Restore habitat (Volunteer Donation)
V
61
Gibbs Lake
Main parking lot
Enlarge
$ 22
62
Gibbs Lake
Main road signage
Replace
$ 2
63
Gibbs Lake
Auxiliary Parking near lake
Build extra parking along Gibbs Lake road
$ 6
64
Gibbs Lake
Toilet for main parking lot
Install toilet at main parking lot
$ 80
65
IGibbs Lake
Existing toilet
Replace existing toilet
$ 80
66
Gibbs Lake
Boundary delineators
Mark boundary to prevent encroachment
$ 7
67
1 Hicks Park
Picnic Area
Replace table and grill
$ 2
68
1 Hicks Park
Parking lot retaining wall
Evaluate and repair
$ 12
69
Broad Spit Park
Signage
Install signage to promote stewardship and care
$ 2
70
Broad Spit Park
Habitat
Evaluate and improve habitat (Volunteer Donation)
V
$ 10
71
Broad Spit Park
Access
Feasibility study for overland access
$ 8
72
Riverside Park
Habitat
Restore habitat
$ 20
73
1 Riverside Park
Trails
Improve Trails
74
Riverside Park
Parking
Improve for viewing salmon runs
75
Riverside Park
Park landscaping
Evaluate and improve landscape (very basic)
$ 3
76
HJ Carroll Park
Restroom
Renovate the restrooms
$ 125
77
HJ Carroll Park
BMX
Convert to pump track/dirt jump lines
$ 50
78
HJ Carroll Park
Athletic fields
Build the 3rd field project
$ 675
79
HJ Carroll Park
Perimeter path
Widen and improve to specs of the Tollefson Trail
$ 45
80
HJ Carroll Park
Basketball courts
Check the goal standards and paint
$ 5
81
HJ Carroll Park
Basketball courts
Check the electrical system
$ 3
82
JHJ Carroll Park
Access
Evaluate and improve ADA parking/access
$ 70
83
HJ Carroll Park
Round -a -bouts
Improve walls, curbs, irrigation, landscaping
$ 60
84
HJ Carroll Park
Picnic grove
Renovate table/grills
$ 12
85
HJ Carroll Park
Creek access
Improve trail, landscape, habitat, access
$ 18
86
HJ Carroll Park
Picnic grove
Berms, weeds, = restore and improve
$ 8
87
HJ Carroll Park
Salmon shelter
Pressure wash and check roof
$ 3
88
HJ Carroll Park
Rotary
Pressure wash and check roof
$ 5
89
Indian Island Park
Portage shelter
Replace shelter
$ 75
90
Indian Island Park
Portage parking lot
Redesign, gravel, grade, improve entrance/exit safety
$ 110
91
Indian Island Park
Lagoon parking lot
Move parking lot up and away from shoreline
$ 400
92
11ndian Island Park
Lagoon beach toilet
Remove and replace up and away from shoreline
$ 80
93
Indian Island Park
ADA access
For trailheads and shelter
94
Indian Island Park
Isthmus Beach W
Grade, gravel, improve
$ 20
95
Irondale Beach Park
Toilet
Install vault toilet
$ 80
96
Irondale Beach Park
Parking lot
Improve drainage
$ 5
971
11rondale
Beach Park
Install picnic shelter
$ 75
981
11rondale
Beach Park
Trails
Improve and sign trail system (Volunteer Donation)
V
99
Irondale Beach Park
Interpretive elements
Design and install interpretive (Volunteer Donation)
V
100
Irondale Beach Park
WDFW Property
Lease agreement or transfer to County
$ -
101
Irondale Beach Park
Habitat
Finalize restoration (Volunteer Donation)
V
102
Irondale Beach Park
Gate
Remove gate, replace with bollards
$ 2
103
Ilrondale Beach Park
Buffer
Purchase neighboring property to form buffer
$ 150
104
Irondale Beach Park
Access
Improve ADA parking and access
$ 3
105
Irondale Community Park
Irrigation Shed
Remove when irrigation system is replaced
$ 4
106
Irondale Community Park
Parking lot
Rebuild, reconfigure
$ 25
107
Irondale Community Park
Basketball courts
Resurface or repair and repaint
$ 30
108
Ilrondale Community Park
Basketball courts
Repair or replace standards/goals
$ 15
109
1 Irondale Community Park
Perimeter fence
Check and repair or replace
$ 12
110
1 Memorial Field
Total of fencing
61
111
Memorial Field
Material storage area
Install near Quincy gate
$ 4
112
Memorial Field
Maintenance shed
Repair, paint
$ 17
113
Memorial Field
Grandstand seating
Replace broken_/worn seating planks
$ 31
114
Memorial Field
Grandstand roof
Touch up paint on roof frame
$ 4
115
Memorial Field
Concession stand
Renovate or replace
$ 35
116
INorth Beach
Shelter
Renovate or replace
Hold
117
North Beach
Old Grills
Remove, replace with one new grill
City will
rebuild
the park
after the
outfall
project
For
118
North Beach
Parking lot
Re -design, enlarge, pave
Outfall
119
North Beach
Lawn/grass/dividers
Re -design, replace
Project
120
North Beach
Restroom building
Remove and replace with a new restroom
Hold
Hold
121
1 North Beach
Shoreline
Improve with 'soft armor'
122
North Beach
Shrubs to West
Push back, enlarge grass areas
Hold
123
Upper Oak Bay Campground
Highway signage
Improve on 104, Oak Bay Road, and 19
124
Upper Oak Bay Campground
Water system
Extend hook ups all around
$ 35
125
Upper Oak Bay Campground
Electrical system
Expand to all campsites
$ 45
126
1 Upper Oak Bay Campground
Furniture
Replace or repair picnic tables
$ 8
127
Upper Oak Bay Campground
Fire rings
Evaluate and improve
$ 5
128
Upper Oak Bay Campground
Tall wood fence
Replace
$ 9
129
Upper Oak Bay Campground
Landscaping
Remove blackberry, replace with natives
$ 7
130
Upper Oak Bay Campground
Delineator posts
Replace central grass area delineator posts
1311
jUpper Oak Bay Campground
Playground
Improve access, replace equipment
$ 150
11321
jUpper Oak Bay Campground
Toilet
Expand - add another toilet or replace with two holer
$ 80
133
Upper Oak Bay Campground
IToilet
Evaluate, add light, fan, paint
$ 3
134
Lower Oak Bay Campground
Toilet
Replace with CXT
$ 80
135
Lower Oak Bay Campground
Boat Ramp
Remove
$ 19
136
Lower Oak Bay Campground
Kiosk
Replace
$ 3
137
1 Lower Oak Bay Campground
Landscape
Landscape berm
$ 2
138
PT Community Center Park
Playground
Replace (RCO Match)
$ 175
139
PT Community Center Park
Landscaping/streetscape
Remove, replace with low maintenance
$ 4
140
PT Community Center Building
Rec Rooms/Kitchen/Day Care
Renovate and remodel
$ 125
141
Quilcene Campground/Park
Campground systems
Install electric hook ups
$ 65
142
lQuilcene Campground/Park
Campground
Install camp host site with hook-ups
$ 20
143
Quilcene Campground/Park
Parking area
Configure for access, no -parking areas, ADA
$ 8
144
Quilcene Campground/Park
Campground
Re -configure, add new sites
$ 75
145
Quilcene Campground/Park
Unused property
Expand campground into unused property
146
Trailhead Park
Install bicycle skills courses
$ 25
147
ITrailhead Park
Improve single track trails
$ 5
Grand Total
$ 2,979
$ 4,341
TOTAL
$ 7,320
7/29/2021
PARKS AND
RECREATION BUDGET
ANALYSIS
zozz-zoz3
Section 1: Executive
Overview of budget request
;ons for request
7/29/2021
One Additional FTEfor Parks
Maintenance
FTE
2021
2022
Parks Maintenance III
1
1
Parks Maintenance II
1
1
Parks Maintenance 1
0
1
Park Maintenance I Seasonal
o.67
o.67
Parks Assistant Clerk Hire
0.26
0.26
Subtotal Park Maintenance
2.93
3.93
Assistant Recreation Manager
1
1
Recreation Aide Clerk Hire
0.11
0.11
Recreation Supervisor Clerk Hire
0.40
0.40
Subtotal Recreation
1.51
1.51
Total
4.44
5.44
Summary of Cost Increases
Summary of Cost Increases from 2021 to 2022
Interfund Rents and Leases $ A259
5% Salary & Benefits $ 32,076
Material for Improvements $ 25,129
Utilities $ 5,500
i FTE Parks Maintenance i $ 65,478
Total 146,442
2
7/29/2021
Overview of Reasons for Request
• Park use doubled from 2009 -zoig, exponential growth in 2021
• Maintenance FTE is .78 less in 2021 that it was in 2oo8
(4.61 in 2oo8, 3.83 in 2023.)
• Resulting in
• 97% of all maintenance time is spent on day to day, routine maintenance
• Periods of poor conditions in the parks —trash, dirty restrooms, etc
• Long, slow decline of our parks
• Stressful, unhealthy, less that safe working conditions for maintenance
staff
Section II: Details of I
3
7/29/2021
Park Use Increase
Campgrounds
Tourist Nights by Campground
1 r"
Campground use ,
increased 191% between
2009 and 2020.
An average increase of 4001
3.7% per year t(>W
2008 70N 1310 2011 2012 1011 201a 2014 1016 t01/ )018 2019 2020 1021
final
■lake lM—d •Uuk-, •Upper Oak 8a, .Lra,Nr Oak bay
Jse Increase: Road Counts
Park Use Based on Road Counters Su mary 2009 to 2020 jAverage Daily Two Way Traffic)
2009
ncrease
ctpr
Chan e-
Avera eAnnual Increase
P
16Veekd2z
Weekend
11weekday
Weekend
Weekday
Weekend
'Weekday
'Weekend
Weekday
'Weekend
0.91
67
59
1 1681
1 351
151%
495%
2.51
5.95
13.70%
44.99%
1.32
39
35
76
131
95%
2741Y
1.95
3.74
8.62%
2&94%
a02
464
337
538
537
16%
59%
1-16
1-59
145%
5-40%
Vance
138
163
405
678
193%
316%
2.93
4,16
17.59%
28.72%
0,21
99
223
171
316
73%
42%
L73
1.42
6.61%
3.79%
0.02
97
133
162
x
67%
x
1.67
x
6.09%
u
0.01
70
121
170
349
1431/
188%
2.43
2.88
12.99%
17.13%
305%
229%
2.05
3.29
9.Ss%l
20.83%
vere taken August 10 to August 16, 2009 and August 10 to August 17, 2020. Counts are average daily two way traffic (ADT)
!kend use increased 229% between 2009 to 2020
Average annual weekend use increase: 20.83%
4
7/29/2021
Park Use Increase: Toilets and Trash
2009 203.9% growth% growth/year
DM Disposal $ 7,440 $ 11,g27 16o% 16%
Transfer Station $ 462 $ 1,034 224% 22%
Toilets (vault and portable) $ 4,807 $ 6,18g 129% 13%
Average 3.72.% 3.7%
Park Use Increase Summary
Toilets and Trash (2009-2019)
Road Counts (2009-2020)
Campgrounds (2009-2020)
Average
Total Increase
Average
Annual
Increase
171% 17%
229% 21%
191% 17%
197% 18.28%
5
7/29/2021
Park Use Increase: zozi and Fut
i Growth
*Jefferson County is growing (graphfrc
Jefferson County Washington
Population 2020 32,190 7,6,
Population 2010 29,872 6,T
Percent change, 7 76% z
2010 to 2020
Park Use Increase: zozi and Future
*Anecdotal evidence: park use growth is
exponential since lifting of pandemic
restrictions.
Many park visitors from fast growing regions
surrounding Jefferson County.
• 64% of Jefferson County Parks and Recreation
campground users from outside Jefferson County in
2020
(From survey of campground fee envelopes)
0
7/29/2021
Primary Parks
i. North Beach Park
z. P.T. Community Center
3. Memorial Field
4. Trailhead Park
S. Courthouse Park
6. Irondale Community Field
7. Irondale Beach Park
8. HJ Carroll
9. East Beach Park
io. Indian Island Park
11. Upper Oak Bay Campground
12. Lower Oak Bay Campground
13. Chimacum Park
14. Gibbs Lake Park
15. Lake Leland Campground
16. Quilcene Campground & Park
17. Riverside Park
18. Broad Spit Park
19. Hicks Park
Partnership Parks
1. Bob Bates Little League
z. Deema Smakman Little -
League
3. Camp Beausite North West �.
iE
7
7/29/2021
Inventory
• 14.7o miles of trails
• 1152.2 acres
• z8 toilets
•lstadium
• 7 athletic fields
• 4 basketball courts
• z tennis courts
• 4 campgrounds
• 5o campsites
• 11 salt water access sites
• 4 freshwater access sites
• 1fishing dock
• z boat ramps
42 garbage cans
• 17 Parking lots
• 4 Picnic shelters
• 5 septic systems
a 4 Irrigation systems
Park
Vault Indoor
Portable
Days[Week
Hours/Week
Trailhead
1
East Beach
1
Gibbs Lake
1
3
2.25
HJ Carroll
6
7
5.25
Hicks
1
3
2.25
Toilet
IIP
Irondale Beach
1
1
0
0
Irondale Community
1
3
2.25
Leland
3
6
4.5
Cleaning
Lower Oak Bay
1
6
4.5
Upper Oak Bay
1
2
6
4.5
Details
Memorial Fld
4
1
0.75
North Beach
4
0
PTRecCenter
2
6
4.5
Quilcene
1
3
2.25
Riverside
1
Total
9
8 11
44
33
Total non -portable
17
Total portable
ss
Grand total
28
Total Hours/Week
33
0
7/29/2021
Annual Direct Expenses by Park 2019
Includes:
-Maintenance Staff
Salary and Benefits
-Supplies w
-Fuel
-Vehicles and
Equipment
-Utilities
-Shop Space
i 0. [ ti* .. i .4 0 Q O f• a F+ l C i O
44pR,y�Et•�4�T4 ���,? 4��y R4TR @ P0. titiTq � T40.p4 a4Ti•4'l� �T4 RTP qVA �Vt'§��v DTP �tiC+ J��V cpT OaA RTR VJ$
�`2'���6�`0.~
dV v;� n�' vQ• T� i L 0.� Nf' u¢ `,w LR
LP. i T ♦1 � pd z}. ,r]` ,1.A 444 �4 �p4 p�:
6 cT QL 44 +.l `hq 0.y `aq
�`P `1 LT
`a
�t;iV7~ aL
pFpLY
R90 V`�$y
��"�
9'��,T
L�'�l9 8�t4�LT }`Sw T
�Rw❑0.VV
aJ4i
LTti, T�kR
J�SL
rsLY`L� ♦4eR Yv +• T aQ~'r'Rti'�,:
�, 0 ty " P kL
0.F
RAG 40.$ yT4 RPR �p4' �4ti TV4, lest y
A
BRA ,gypt0 0 R❑
�• e; y V v �.p � R 4V4
r,P
♦p" t=V}T `Q� v
V �
7/29/202 1
35%
Historic
Parks Maintenance FTE
The parks maintenance
4.5 team neverfully
recovered
4
Recession related RIF
3-5 caused park closures and
emergency volunteerism
5
�5
05
0
1 6 zoo? M98 zoo9 zoz3 5 zai6 —7 2oi6 zoz9 zozo zozi
2019 Maintenance Hours by Activity as a Percent of Total
97% off all maintenance time is spent on day to day, routine maintenance
3-%
z596
zo%
z59L
zo%
5°6
.'A
General Clean Field Prep Maint Irrigation Landscape Care Mow/String Repairand Vandalism Admin Staff Trails
Maintenance Park/Custodial Improvement Trim Maint
IN 2019 Percent
r
Training
10
7/29/2021
Average Monthly 2021 Peak Season Maintenance Services
Upper Oak Bay Campgrnund Hours by Park
Riverside park
GO,— Campground
Duticene Day Use Park t♦
Part Townsend CC Grounds
Port Townsend CC Inside s
North Beach Park
Memonal Field
Lower Oak Bay Campground
Lake Leland Campground
I el. LekudWOi Foil P.4
Irondale Community Park
Irondale Beach Park
Indian l stand Park Isthmus Beach qiiiii,ii
Indian Island Park Lagonn Beach l�
Indian Island Park Portage Beach
Hicks Beach Park
HJ Carroll Park
Gibbs Lake Park ■
East Beach Park
Deem. Smakman Field
Courthouse Park 1�r
Chimacum Park ■
Cape George Tratlhead
Broad Spit Park
Bob Bales Field
Camp Beausne Northwest
Request for Additional Monthly Park Maintenance Hours
by Park
Upper Oak Bay Campground �•AN
Riverside park r�
Oudcene Campground
Otal—e Day Use Park iF
Port f.—end CC Grounds �y
Part Townsend CC Inside
North Beach Park
Memonal Field
Lower Oak Bay Campground
Lake Leland Campground
Lake Leland Water Front Pas k
Irondale Community Park
1—dale Beach Park #P•��
Indian Island Park is Lhmus Beach
Indian Island Park Lagoon Beach r
Indian Island Park Portage Beach
Hicks Beach P.,k
HJ Carroll Park
Gibbs Lake Park
East Beads Park
Deema Smakman Field s
Courthouse Park
Chimacum Park 1F
Cape George Tratlhead 10
Broad Spit park i
Bab Bates Field r
Camp Beausite North—L
What will additional hours be used for?
PT Community Center Inside moving from Rec to Parks
Maintenance
• Riverside Park - minimal service during fishing season
• Quilcene Day Use- pressure washing and court
maintenance, playground inspections
• PTCC Grounds- day to day cleaning, landscape
improvements
• Campgrounds - maintenance improvements such as
landscaping, replacing fire -rings and picnic tables
• Irondale community- irrigation repairs, day to day service,
vandalism reduction
Lake Leland Water Front- new toiletservice, increased
cleaning
• Irondale Beach and Indian Island- minimal supportto
ongoing volunteerism
• HU Carroll - event support, landscaping, painting, trail
maintenance, bike track maintenance, irrigation repair,
building repairs, JUMP! Playground project
• Gibbs Lake- trail maintenance, increased support for
caretaker
• East Beach- painting and shelter repair, parking lot repairs
• Deema Smakman and Bob Bates -limited supportfor
partnership volunteers
• Courthouse Park- limited supportfor partnership
volunteers
• Cape George- minimal support for volunteers
Broad Spit -annual inspection and cleaning, limited signage
• Camp Beausite NW - new signage, limited supportfor
partnership
11
7/29/2021
Request for Additional Monthly Maintenance Hours by Activity
Capital Projects
Training
5.ipynb[tp 4[�Milem
T,M !
Events
Vandalism
Repa and Wim
M—ISt—g Trim
Landscape Care
Imgahon
M"'t Improvement
Field Prep
Clean ParklCustadW
General
•' S '^ �5 �S 3. 35 4- 45
2019Volunteers, Camp -Hosts, Park Caretakers
Gibbs Lake Caretaker
HJ Carroll Caretaker
Oak Bay Camp -Host
Park Maintenance Volunteers
Recreation Program Volunteers
Tota I
FTE
Annual Hours Individuals
1200
1
780
2
676
1
973
24
1274
61
4903
89
2.72
12
7/29/2021
Summary of need for park maintenance
FTE
• Preventative maintenance
• Maintenance improvements
• Trails
• Irrigation
• Training/team building
• Safety
• Resiliency
• Support, leverage volunteers
• Sustain parks that are i00%
volunteer
• Support camp -host & caretakers
• Riverside Park, Broad Spit
• Partnership parks
• Able to take vacations
• Capital projects
Staff Concerns
• Stress, Health and safety
• Isolation (almost always working alone)
• Poor day to day conditions —trash, really dirty toilets, dying landscaping, vandalism
• Deterioration, decline of resources
• The challenges of crowds of people, events, groups, full parking lots, transportation
• Not enough time for training, team building, planning,
• Never a moment to improve the situation
• Afraid, or unable to take a vacation
• Feeling of falling behind
13
60% Design Cost Estimate Summary
Phase 1
Phase 2
Expense
Total Construction Cost Phase 1
Design and Engineering
Project Management
Maintenance Fund
Building Permit
Total
Revenue
$ 900,758
$ 87,630
$ 77,630
$ 10,000
$ 2,750
$1,078,768
Total $ 914,848
Net $ (163,920)
Expense
Total Construction Costs Phase 2 $400,CQ0 chic Friditr, 7:30
Complete Project
Expense
Grand Total Construction Costs $1,478,768
Net $ (563,920)
Jefferson Universal Movement Playground Budget Summary
Revenue Budget
Cash Funds Value % of Total
JUMP $ 222,733 24.35%
MBMCF $ 50,000 5.47%
Subtotal $ 272,733
Pledged Donations of Cash Funds
Jefferson Health Care
$
15,000
1.64%
Jefferson County Funds for Pathway
$
15,000
Jefferson County Funds for Project Manager
$
65,000
Subtotal
$
95,000
10.38%
RCO Grant
$
500,000
54.65%
Total
$
867,733
94.85%
In -Kind Donations
Demolition and Site Preparation $ 27,429 3.00%
Playground Footings Preparation $ 14,186 1.55%
Concrete $ 5,500 0.60%
Subtotal $ 47,115 5.15%
Total $ 914,848 100.00%