Submittal Explanation (what’s being revised?):
Please complete the following, if appl icable:
Permit Type & Square Footage
PERMIT TYPE: APPROVED SQ/FT: CHANGE TO SQ/FT: TOTAL SQFT:
Commercial
Residential
Garage/Shop
Accessory
Uncovered Porch
Covered Porch
Unfinished Basement
Other (Specify)
Estimated Fair Market value cost of changes:
No change to square footage
13 Sept 2021
BLD2017-00181
541 Grifth Point Road
021324013
MLA09-00165
In response to a request from David Johnson dated August 11, 2021, the house and deck have
been moved 10'-10" due east, to bring the deck back behind the "common line buffer."
There are no changes to the proposed house or the deck.
0.00
BLD2021-00432
BLD2017-00181
Estimated Fair Market value cost of changes:
If the revision involves structural and/or floor plan changes, the following is required:
x A narrative describing the changes and page number in set of plans where change occurs
x Two copies of only the revised building plans - clearly marked by a border/bubble
x Two copies of revised floor plan on no larger than 11x17
x Minimum fees:
Plan Check - $97.00
Land Use - $97.00
Administrative - $97.00
Environmental Health - $141.00
Environmental Health - $71.00 - Review of resubmission before Building Permit is approved
Technology Fee - 5% of total fees
If the revision involves changes to the site plan, the following is required:
x A narrative describing the changes on the site plan- if they were requested by a department
please note who requested them
x Two copies of the revised site plan on no larger than 11x17 – revisions clearly marked by a
border/bubble
x Minimum fees:
Administrative - $97.00
Land Use - $97.00
Environmental Health – will be invoiced by EH, if needed, after review
Plan check fees may apply if a revision to the building plans is needed
Technology Fee - 5% of total fees
Fees shall be collected at the time of re-submittal. Revisions that go beyond the minimum revision time
during Plan Check, Land Use review, and Environmental Health review will be charged an additional
hour. Any additional fees that are accrued during the revision process must be paid prior to the approval
and issuance of the revised permit.
All revisions to structural components or plans that previously included structural engineering will need
to have the revision wet stamped and signed by a design professional (engineer, architect etc.) licensed
in WA state.
Please route copy to:
EH: Planning: PW: Building:
Office use only
Please Check with DCD for total fees