HomeMy WebLinkAbout082321ca01 Department of Public Works
0 Consent Agenda
Page 1 of 1
Jefferson County
Board of Commissioners
Agenda Request
To: Board of Commissioners
Mark McCauley, Interim County Administrator
From: Monte Reinders, Public Works Director/County Engineer .._
Agenda Date: August 23,2021
Subject: Open Right-of-Way Request - Garfield St.
Statement of Issue:
Public Works has received an application to open a portion of platted Garfield St.
right-of-way for approximately 75 feet for access to the Applicant's parcel.
Analysis/Strategic Goals/Pro's Et Con's:
The proposed area of right-of-way to be opened is located within the Plat of Irondale
Acre Tracts. This road is not proposed to be a County Road, therefore the County will
not be responsible for maintenance should this request be approved.
Per RCW 36.80.030, the supervision of right of way, including the development of
road standards is under the review of the County Engineer, acting under the
supervision and authority of the Board of County Commissioners. The County Engineer
has prepared standards for opening County right-of-way at this location as outlined in
the attached report.
Fiscal Impact/Cost Benefit Analysis:
There will be no cost to the County for maintenance or construction should this right-
of-way be opened.
Recommendation:
Jefferson County Public Works recommends approval of this application to open a
portion of platted Garfield St. for approximately 75 feet, as outlined on the attached
Engineer's Report. The Board is asked to sign the Resolution and return to Public
Works.
Department Contact:
Terry Duff 360-385-9159
Reviewed By:
,4
Mark McCaul , Interim County inistrator Date
STATE OF WASHINGTON
COUNTY OF JEFFERSON
In the Matter of a Resolution )
to Construct a Road and Utilities on a ) Resolution No.
Portion of Public Right of Way )
Known as Garfield St. )
WHEREAS, an application to construct roads and utilities on public right-of-way has been
submitted by Randall Clement for the purpose of providing access to their property, and
WHEREAS, said development will require opening approximately 75 feet of platted Garfield St.,
and
WHEREAS, the Revised Code of Washington (RCW) 36.75 and 36.80 places the supervision of
right of way, including the development of road standards, under purview of the County Engineer, acting
under the supervision and authority of the Board of County Commissioners, and
WHEREAS, the applicant has proposed to construct roads to a standard less than what would be
required for public roads, and
WHEREAS, the County Engineer has examined the right of way and the existing road system and
the potential for future development and recommends that this request be approved provided the
standards described in the County Engineer’s report dated August 5, 2021 are followed, and
WHEREAS, the applicant will be responsible for the maintenance of this section of roadway and
it is understood that the County will not be responsible for maintenance of this section of roadway and
that it will not be added to the official County Road log until such time as the road is improved to public
road standards and added to the County Road Log through Board action, and
WHEREAS, in lieu of requiring the road to be constructed to full public road standards at this
time, the applicant will be required to sign a no protest agreement waiving rights, except as to the
method of assessment, to protest formation of a pro-rata cost sharing arrangement such as a Road
Improvement District (RID) should it become necessary in the future to upgrade this road, whether
proposed by petition or a resolution of the Board of County Commissioners,
NOW, THEREFORE BE IT RESOLVED, that applicant shall be granted permission to open the following
right of way:
Platted Garfield St. from its intersection with Jacobsen Dr. northerly for approximately 75 feet.
BE IT FURTHER RESOLVED, that roads shall be constructed in general conformance with the standards
recommended in the County Engineer’s report dated August 5, 2021.
BE IT FINALLY RESOLVED, that prior to performing construction the applicant shall receive any and all
necessary permits including a permit from the Department of Public Works specifying any conditions
that will be required by the County Engineer to ensure that said standards are met and that the
applicant shall pay any inspection costs incurred by the Public Works Department to ensure that these
standards are met.
ADOPTED this _______ day of _______________________, 2021.
JEFFERSON COUNTY
BOARD OF COMMISSIONERS
____________________________________
Kate Dean, Chair
____________________________________
Heidi Eisenhour, Member
____________________________________
Greg Brotherton, Member
ATTEST:
_____________________________
Carolyn Galloway
Deputy Clerk of the Board
Jefferson County Public Works Department
County Engineer's Report
Open Right-of-Way Portion of Platted Garfield St., Irondale Acre Tracts
This Report is in response to an Open Right-of-Way Permit application (Exhibit A) submitted by
Randall Clement. The intent of the County Engineer's Report is to evaluate and provide
preliminary design parameters/criteria to facilitate the appropriate design of the project. After
agency approval of all documents required by this report the applicant shall be issued a permit
by the Public Works Department.
PROJECT DESCRIPTION
Plat name: Irondale Acre Tracts
Road/ Street Name: Platted Garfield St.
Adjacent to: Assessor Parcel #962700035
Distance: Approximately 75 feet
Sections 12, Township 29 North, Range 1 W
The road is not proposed to be a County Road (Exhibit B = Site Plan).
EXISTING CONDITONS
This Permit would officially open a segment of platted Garfield St. right-of-way (subject ROW)
to provide access to the Applicant's parcel #962700035.
The access to th is segment of Garfield St. is northerly of the intersection of Jacobsen Dr. and
Goldenview Dr. The subject ROW extends to a trail segment which meets Washington Ln.,
approximately 30 feet beyond the area to be opened, and, as such, the subject ROW is unlikely
to be a through road due to the presence of a wetland area.
The proposed driveway is located so it is outside of a wetland area but within the buffer and
identified as the preferred location in the wetland report attached as Exhibit I.
This segment of right-of-way is adjacent to a parcel presently being developed with access off
Jacobsen Dr. at mile post 0.318 right.
DESIGN STANDARDS
Roads shall be constructed to the County's adopted County Road design standards:
•American Association of State Highway and Transportation Officials (AASHTO) Policy on
Geometric Design of Highways and Streets (most current version),
•Washington Department of Transportation (WSDOT) Design Manual and Standard
Specifications for Road, Bridge and Municipal Construction,
•Jefferson County Unified Development Code JCC 18.30.060 Grading, JCC 18.30.070
Stormwater, and JCC 18.30.080 Roads.
Page 1 of7