Loading...
HomeMy WebLinkAboutBLD2021-00500 - 10 Communications 1505 Westlake Ave N Seattle, WA 98109 Phone: (206) 336-2863 Fax: www.crowncastle.com Via E-Mail Submittal August 20, 2021 COUNTY OF JEFFERSON, WA Department of Community Development 621 Sheridan Street Port Townsend, WA 98368 RE: Eligible Facilities Request to modify equipment on a communications tower located at: 1219 Center Rd, Chimacum, WA 98325 Crown Site Number: 826841 / Customer Site Number: 296505 / Application Number: 572160 Crown Castle USA Inc. (“Crown Castle”) on behalf of Verizon Wireless (“Verizon”) is submitting the attached Eligible Facilities Request application to modify transmission equipment on a telecommunications tower located at 1219 Center Rd, Chimacum, WA 98325 in the County of Jefferson (the “296505 Chimacum-Alt1 Tower”). Verizon proposes to modify the “296505 Chimacum-Alt1 Tower” as follows: • Remove (12) Antennas • Remove (12) Radios • Remove Support Bracing • Install Mount Modification per Tower Engineering Solutions LLC dated 07/12/21 • Install (6) Antennas • Install (6) Radios Ground Scope of work to take place within the existing leased area and consists of the following: • None Itemized list of submittal documents: • Project Narrative • Building Permit Application • Building Permit Application Supplement • MOL • Structural Analysis • Mount Analysis • Mount Modification Drawings 1505 Westlake Ave N Seattle, WA 98109 Phone: (206) 336-2863 Fax: www.crowncastle.com • Construction Drawings Section 6409 of the Middle Class Tax Relief and Job Creation Act of 2012, commonly known as the “Spectrum Act” (Pub. Law No. 112-96, 126 Stat 156), mandates that state and local governments “may not deny, and shall approve, any eligible facilities request for a modification of an existing wireless tower or base station that does not substantially change the physical dimensions of such tower or base station.” Additionally, if “the reviewing State or local government determines that the application is incomplete” [they] “must provide written notice to the applicant within 30 days of receipt of the application, clearly and specifically delineating all missing documents or information.” Under federal law, an Eligible Facilities Request is deemed granted with written notification in sixty (60) days after an application is filed with a local jurisdiction, excluding tolling. Verizon is committed to working cooperatively with all jurisdictions around the country to secure expeditious approval of requests to modify existing personal wireless service facilities. If you should require more information regarding the Spectrum Act, please do not hesitate to contact me with your questions. Sincerely, Renata Fayten Renata Fayten For CCI on behalf of Verizon 425-269-5561