Loading...
HomeMy WebLinkAboutBLD2020-00523 - MECHANICAL (0002)Mechanical Application 1 DEPARTMENT OF COMMUNITY DEVELOPMENT 621 Sheridan Street, Port Townsend, WA 98368 Tel: 360.379.4450 | Fax: 360.379.4451 Web: www.co.jefferson.wa.us/communitydevelopment E-mail: dcd@co.jefferson.wa.us MECHANICAL PERMIT APPLICATION Steps in the Permit Process: -Review required submittal items to ensure all information is completed prior to submitting application. -Mechanical Permits can be mailed into our office-and do not require an appointment. -Fees are due at time of submittal, Mechanical permits are generally issued within 5 business days. For Department Use Only Receipt #: Date: Related Application #s: Payment #: Is this application for use in a Mobile / Manufactured Home? *If Yes: A permit from Washington State Department of Labor and Industries, not Jefferson County, is required for appliances installed within a mobile/manufactured home. L&I - 360-417-2702 *If No: Complete this form and make an appointment to submit to Jefferson County Permit Tech 360-379-4450 Required Submittal Items – for propane tank only General Site plan – showing propane tank, lines, and distance from tank to all existing structures. Required Submittal Items – for roof mount Solar Panel installation only (ground mount complete CAM) Complete first page and signature block only of Mechanical Permit Application. A complete solar panel supplemental application. Site Information Assessor Tax Parcel Number: Site Address and/or Directions to Property: Access (name of street(s) from which access will be gained: Description of Work: Property Owner Name: Address: Phone #: E-mail Address: Applicant/Contractor: Authorized Agent/Representative Name: Phone #: E-mail Address: License #: Expiration Date: accre@olympus.net 360-643-3080 Grid-Tied Roof Mounted Solar 7423 Thorndyke Road, Quilcene, WA 98376 Cass Whalen (360) 531-1108 POWERTE934QE 11-05-2020 andy@powertripenergy.com Power Trip Energy Corp/ Andy Cochrane 7423 Thorndyke Road, Quilcene, WA 98376 992600018 Mechanical Application Heat Source Electric Heating Oil Propane*Wood Indicate Quantity of NEW Fixture Types Below *Propane is prohibited in hazardous locations such as basements or pits or anywhere "heavier-than- air" gas can unsafely collect. Quantity Fixture Type Description Fan Bath Fan and/or Exhaust Fan Clothes Dryer Clothes Dryer with Exhaust Vent Cook Stove Cook Stove, Range Hood Exhaust Fireplace - Gas Fireplace-Gas or Gas Log Insert *Propane tanks over 125 gallons require a minimum setback of 10 ft. from property line and buildings, and a site plan must be submitted with the application showing the setbacks. If propane tank is over 500 gallons, a site plan is required to accompany this application, and a separate Fire Code approval is also required. Fireplace - Wood Fireplace-wood, Wood Stove, or Pellet Stove Electric Furnace Electric Furnace or HP +/- Ducting Propane (LP) Gas Furnace Propane Furnace +/- Ducting Water Heater - Gas Gas WH Vent and Combustion Air Gas Pipe System Gas Pipe System LPG/Oil Propane Tank LP Fuel Tank (# gallons: ) Heat Pump Generator Air Conditioner Installation manual must be on site at time of inspection or a re-inspection fee will be charged. By signing this application form, the owner/agent attests that the information provided herein, and in any attachments, is true and correct to the best of his, her or its knowledge. Any material falsehood or any omission of a material fact made by the owner/agent with respect to this application packet may result in making any issued permit null and void. I further agree to that all activities I intend to undertake or complete associated with this permit will be performed in compliance with all applicable federal, state and county laws and regulations and I agree to provide access and right of entry to Jefferson County and its employees, representatives or agents for the sole purpose of application review and any required later inspections. Applicant may request notice of the County’s intent to enter upon the property for visits related to this application and subsequent permit issuance. Property Owner Signature: Print Name: Date: OFFICE USE ONLY Building Permit Fees Single item only Tank, lines & appliance Mechanical Permit fee (tank swap, woodstove, furnace, roof -solar panel, etc ) $192.00 $192.00 Propane – Lines, tank, and appliance (add’l $96.00) $96.00 Project Scanning Fee $24.00 $24.00 Technology Fee – 5% $10.80 $15.60 Total Fees* $226.80 $327.60 *Additional fees may apply Andy Cochrane 10/06/2020 DEPARTMENT OF COMMUNITY DEVELOPMENT 621 Sheridan Street, Port Townsend, WA 98368 Tel: 360.379.4450 | Fax: 360.379.4451 Web: www.co.jefferson.wa.us/communitydevelopment E-mail: dcd@co.jefferson.wa.us EXPEDITED PERMITTING CHECKLIST FOR RESIDENTIAL PHOTOVOLTAIC SYSTEMS: ROOFTOP MOUNTED ❶ Project Information Project Applicant: Site Owner Name: Project Address: PV system description: ❷ Determine if your project needs a building permit (check all that apply): Yes No 1. PV system is designed and proposed for a structure previously built to code. ☐ ☐ 2. PV system is designed for rooftop of a building in general compliance with applicable codes. ☐ ☐ 3. Mounting system is engineered and designed for PV. ☐ ☐ 4. Rooftop is made from lightweight material such as shingles. ☐ ☐ 5. PV system has been pre-approved by electrical permitting agency. ☐ ☐ 6. To address uplift, panels are mounted no higher than 18” above the surface of the roofing to which they are affixed. Except for flat roofs, no portion of the system may exceed the highest point of the roof. ☐ ☐ 7. Total dead load of panels, supports, mountings, raceways and all other appurtenances weigh no more than one of the following. If YES, indicate which: ☐ No more than three and one-half (3.5) pounds per square foot (PSF) ☐ Frameless panels on at least 3/12 pitch roof weighing no more than four and one-half (4.5) PSF ☐ Frameless panels on at least 5/12 pitch roof weighing no more than five (5.0) PSF ☐ ☐ 8. Supports for solar panels are installed to spread the dead load across as many roof-framing members as needed to ensure that at no point are loads in excess of fifty (50) pounds are created. ☐ ☐ 9. Attachment to the roof is specified by the mounting system manufacturer. ☐ ☐ 10. Method and type of weatherproofing roof penetrations is provided ☐ ☐ 11. Home is code compliant to setbacks and height, or code allows expansion of nonconformity for solar panels. ☐ ☐ 12. Panels are mounted no higher than the roof ridge or apex of roof (applies only to pitched roofs) ☐ ☐ If you answered yes to all of the above questions, an over-the-counter permit is authorized. ❸ Submit this Checklist and Mechanical Permit Application and Site Plan to: I attest that all information in this checklist is accurate to the best of my knowledge. Applicant Signature: Date: Applicant Name (Please Print): 4 Andy Cochrane Grid-Tied Roof Mounted Solar 10/06/2020 4 4 4 4 4 4 4 4 4 Cass Whalen 4 7423 Thorndyke Road, Quilcene, WA 98376 Power Trip Energy Corp 4 4 Solar Agent: Michael Slater Client Name: Barron-Whalen Residence October 6, 2020 - 4 - Power Trip Energy Corp 83 Denny Ave, Port Townsend, WA 98368 (360)643-3080 www.powertripenergy.com LIC: POWERTE964JN Project: Phase II Client: Cass Whalen Phone: (360) 531-1108 Address: 7423 Thorndyke Rd., Quilcene WA 98376 System Description: 2.1 Residential Grid-tied PV AC Circuit Combiner Panel: Exterior north wall of house Solar Modules: Branch Circuit A-6 SunPower 350W AC modules Model: SPR-X21-350-AC-BLK Micro inverter max power output 320 watts House roof Customer Owned Production Meter: Exterior north wall of house Net Meter: Exterior north wall of house Meter #: A091650065 Utility Grid: Jefferson County PUD AC System Disconnect: (For Rapid Shutdown of AC Modules) Exterior north wall of house Main Service Panel (LOAD): Interior north wall of house Solar Modules: Branch Circuit B- ________ Model: SPR-X21-350-AC-BLK Micro inverter max power output 320 watts House roof Solar Modules: Branch Circuit C- ________ Model: SPR-X21-350-AC-BLK Micro inverter max power output 320 watts Solar Agent: Michael Slater Client Name: Barron-Whalen Residence October 6, 2020 - 5 - Power Trip Energy Corp 83 Denny Ave Port Townsend, WA 98368 (360)643-3080 www.powertripenergy.com LIC: POWERTE964JN Project: Phase II Client: Cass Whalen Phone: (360) 531-1108 Address: 7423 Thorndyke Rd., Quilcene WA 98376 System Description: 2.1 Residential Grid-tied PV Project Photos and Notes: North exterior wall of house- Location of utility meter, combiner panel, production meter and data monitoring. West and south facing roof lines contain existing array pf 14 SunPower 335W West facing roof line- Location of new array of 6 SunPower 350W AC modules Solar Agent: Michael Slater Client Name: Barron-Whalen Residence October 6, 2020 - 6 - Breaker panel before first installation utility meter location along with our exterior equipment Datasheet X-Series: X21-350-BLK | X21-335-BLK | X20-327-BLK SunPower® Residential AC Module Built specifically for use with the SunPower Equinox™ system, the only fully integrated solution designed, engineered and warranted by one manufacturer. Maximum Power. Minimalist Design. Industry-leading efficiency means more power and savings per available space. With fewer modules required and hidden microinverters, less is truly more. Highest Lifetime Energy and Savings. Designed to deliver 60% more energy over 25 years in real-world conditions like partial shade and high temperatures.1 150% 140% 130% 120% 110% 100% 90% 80% 70% 60% 0 5 10 15 20 25 Years of operation Up to 60% more lifetime energy Best Reliability. Best Warranty. With more than 25 million modules deployed around the world, SunPower technology is proven to last. That’s why we stand behind our module and microinverter with the industry’s best 25-year Combined Power and Product Warranty, including the highest Power Warranty in solar. 100% 98% 96% 94% 92% 90% 88% 86% 84% 82% 80% 0 5 10 15 20 25 Years of operation 12% more power in year 25 E-Series and X-Series And Better. The SunPower® Maxeon® Solar Cell •Enables highest-efficiency modules available. 2 •Unmatched reliability 3 •Patented solid metal foundation prevents breakage and corrosion Factory-integrated Microinverter •Simpler, faster installation •Integrated wire management, rapid shutdown •Engineered and calibrated by SunPower for SunPower modules W a r r a n t e d m o d u l e p o w e r 25 -ye a r e ne r g y y ie l d pe r W sunpower.com X-Series: X21-350-BLK | X21-335-BLK | X20-327-BLK SunPower® Residential AC Module AC Electrical Data Inverter Model: Enphase IQ 7XS (IQ7XS-96-ACM-US) @240 VAC @208 VAC Peak Output Power 320 VA 320 VA Max. Continuous Output Power 315 VA 315 VA Nom. (L–L) Voltage/Range2 (V) 240 / 211–264 208 / 183–229 Max. Continuous Output Current (A) 1.31 1.51 Max. Units per 20 A (LL) Branch Circuit3 12 (single phase) 10 (two pole) wye CEC Weighted Efficiency 97.5% 97.0% Nom. Frequency 60 Hz Extended Frequency Range 47–68 Hz AC Short Circuit Fault Current Over 3 Cycles 5.8 A rms Overvoltage Class AC Port III AC Port Backfeed Current 18 mA Power Factor Setting 1.0 Power Factor (adjustable) 0.7 lead. / 0.7 lag. No active phase balancing for three-phase installations 1 SunPower 360 W compared to a conventional module on same-sized arrays (260 W, 16% efficient, approx. 1.6 m2), 4% more energy per watt (based on third-party module characterization and PVSim), 0.75%/yr slower degradation (Campeau, Z. et al. “SunPower Module Degradation Rate,” SunPower white paper, 2013). 2 Based on search of datasheet values from websites of top 10 manufacturers per IHS, as of January 2017. 3 #1 rank in “Fraunhofer PV Durability Initiative for Solar Modules: Part 3.” PVTech Power Magazine, 2015. Campeau, Z. et al. “SunPower Module Degradation Rate,” SunPower white paper, 2013. 4 Factory set to 1547a-2014 default settings. CA Rule 21 default settings profile set during commissioning. See the Equinox Installation Guide #518101 for more information. 5 Standard Test Conditions (1000 W/m² irradiance, AM 1.5, 25°C). NREL calibration standard: SOMS current, LACCS FF and voltage. All DC voltage is fully contained within the module. 6 This product is UL Listed as PVRSE and conforms with NEC 2014 and NEC 2017 690.12; and C22.1-2015 Rule 64-218 Rapid Shutdown of PV Systems, for AC and DC conductors; when installed according to manufacturer’s instructions. See www.sunpower.com/facts for more reference information. For more details, see extended datasheet www.sunpower.com/datasheets Specifications included in this datasheet are subject to change without notice. ©2018 SunPower Corporation. All Rights Reserved. SUNPOWER, the SUNPOWER logo and MAXEON are registered trademarks of SunPower Corporation in the U.S. and other countries as well. 1-800-SUNPOWER. Please read the Safety and Installation Instructions for details. 531946 RevA DC Power Data X21-350-BLK-E-AC X21-335-BLK-E-AC X20-327-BLK-E-AC Nom. Power 5 (Pnom) 350 W 335 W 327 W Power Tol. +5/−0% +5/−0% +5/−0% Module Efficiency 21.5% 21.0% 20.4% Temp. Coef. (Power) −0.29%/°C −0.29%/°C −0.29%/°C Shade Tol. • Three bypass diodes • Integrated module-level maximum power point tracking Tested Operating Conditions Operating Temp. −40°F to +185°F (−40°C to +85°C) Max. Ambient Temp. 122°F (50°C) Max. Load Wind: 62 psf, 3000 Pa, 305 kg/m² front & back Snow: 125 psf, 6000 Pa, 611 kg/m² front Impact Resistance 1 inch (25 mm) diameter hail at 52 mph (23 m/s) Mechanical Data Solar Cells 96 Monocrystalline Maxeon Gen III Front Glass High-transmission tempered glass with anti-reflective coating Environmental Rating Outdoor rated Frame Class 1 black anodized (highest AAMA rating) Weight 42.9 lbs (18.5 kg) Recommended Max. Module Spacing 1.3 in. (33 mm) Warranties, Certifications, and Compliance Warranties • 25-year limited power warranty • 25-year limited product warranty Certifications and Compliance • UL 1703 • UL 1741 / IEEE-1547 • UL 1741 AC Module (Type 2 fire rated) • UL 62109-1 / IEC 62109-2 • FCC Part 15 Class B • ICES-0003 Class B • CAN/CSA-C22.2 NO. 107.1-01 • CA Rule 21 (UL 1741 SA)4 (includes Volt/Var and Reactive Power Priority) • UL Listed PV Rapid Shutdown Equipment6 Enables installation in accordance with: • NEC 690.6 (AC module) • NEC 690.12 Rapid Shutdown (inside and outside the array) • NEC 690.15 AC Connectors, 690.33(A)–(E)(1) When used with InvisiMount racking and InvisiMount accessories (UL 2703): • Module grounding and bonding through InvisiMount • Class A fire rated When used with AC module Q Cables and accessories (UL 6703 and UL 2238)6 : • Rated for load break disconnect PID Test Potential-induced degradation free Date: 10/7/2020 Invoice ID: 2020BLD20-00523 JEFFERSON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT 621 Sheridan Street | Port Townsend, WA 98368 360-379-4450 | email: dcd@co.jefferson.wa.us www.co.jefferson.wa.us/commdevelopment Invoice Date Due: 11/6/2020 REMIT TO: BILLING ADDRESS: Please return the above portion with your payment Permit 192.00 Scanning Fee 24.00 Tech Fee 10.80 $226.80Total Amount Due: Jefferson County DCD 621 Sheridan St. Port Townsend, WA 98368 CASS M WHALEN QUILCENE WA 98376-8607 7423 THORNDYKE RD Permit Number: BLD20-00523 Permit 192.00 Scanning Fee 24.00 Tech Fee 10.80 Total Amount Due:$226.80 Payment is accepted by cash, check, debit or credit card (Visa, Mastercard, Discover). To pay by credit card, go to http://www.co.jefferson.wa.us/617/Credit-Card-E-Check-Payments-for-Permits, and click on the "Online Credit Card & echeck Payments" link on the left side of the page. For questions: call 360-379-4450.