HomeMy WebLinkAboutBLD2021-00432-10- CommunicationsFrom:Don Argus
To:David W. Johnson
Cc:Jodi Adams; Brett Johnson; Bruce Waltar
Subject:Re: Permit # BLD2017-00181, site plan revised
Date:Monday, September 13, 2021 10:54:24 AM
Attachments:BLD2017-00181 Revision .pdf
ATT00001.htm
JOHNSON-PATE SITE PLAN 2021 09 13-11x17.pdf
ATT00002.htm
JOHNSON-PATE SITE PLAN 2021 09 13-A0.2.pdf
ATT00003.htm
CAUTION: This email originated from outside your organization. Exercise caution when
opening attachments or clicking links, especially from unknown senders.
Hi David,
We have completed revisions to the site plan in response to your request of August 11.
Please find attached the completed revision request form, a pdf of the revised Sheet A0.2 and a
pdf of the revised 11x17 site plan.
This is a different solution than the drawings I ran by you on August 23. Instead of cutting
back the deck, as shown on the August 23 drawings, our clients have decided to move the
entire house and deck to the east enough to bring it behind the common line buffer without
modifying the deck.
Please let us know if you need hard copies as well.
Thanks very much,
Don Argus
Don Argus RA
FabCab | Architect
dargus@fabcab.com
206.240.2586
www.fabcab.com