Loading...
HomeMy WebLinkAbout062 03 ;;.., C/'uJ: J;::¿~ì / () ./ S . Ó 3- ill the Matter of Updating The Official County Road Log: Mt. Constance Way and Mt. Christie Court STATE OF WASIDNGTON County of Jefferson ) ) ) RESOLUTION NO. 62-03 WHEREAS, the following roads have been dedicated as Public Rights-of-Way in the Olympic Terrace Division 1 Long Plat; and WHEREAS, the following roads will be maintained at public expense; and WHEREAS, the Official County Road Log is filed in the County Engineer's Office; NOW, THEREFORE BE IT RESOLVED, that the County Engineer is hereby directed to make the following additions to the Official County Road Log: Road Number 517009 517109 Road Name Mt. Constance Way Mt. Christie Court Section! Township/Range S21, T28N, RlE Milepost Begin/End 0.00 - 0.34 S21, T28N, RIE 0.00 - 0.26 APPROVED AND ADOPTED this /.3 'iß¿ay of ~ ,2003. JEFFERSON COUNTY BOARD OF COMMISSIONERS SEAL: ATTEST: "'"""'....~......,,'''' ,.r,-Þ' ,''þ ff. 'y (0 y / f-'~' ~,' /1,' , "J · . · ,.,. ,.'fJ ", I 1,) f'"< " '" 0 \\ I'" \ t ","'" , ( :;" \ '. /:.~:., '~ '.. " : .t i.- ,...J .' \; i'i i1, if A 71(ì á}lf\.f-JJ, l!kþ-uß-(/ ~a L. Delaney . (f Û- Clerk of the Board ~~ Dan Titterness, Chair illtersects Springwood Drive, CRNo.516109; MP 0.04 Left Mt. Constance Way CR No. 517009 MP 0.26 Right JEFFERSON COUNTY DEPARTMENT OF PUBLIC WORKS P,O, Box 2070 1322 Washington Street Port Townsend, WA 98368 (360) 385-9160 Frank Gifford, Public Works Director Robert G. Turpin, P.E., County Engineer MEMORANDUM TO: Jefferson County Board of Commissioners Robert Turpin, P,E., County Engineer v..tjð.? FROM: DATE: October 6,2003 RE: County Engineer's Report: Accepting roads in Olympic Terrace Long Plat Rights-of-way for Mt. Constance Way and Mt. Christie Court in the Olympic Terrace Long Plat in Port Ludlow were dedicated to Jefferson County in fee simple. The Public Works Department reviewed and approved the road construction plans and the storm water management plans. The road was designed in accordance with the requirements of the Department's adopted standards, the Policy on Geometric Design of the American Association of State Highway and Transportation Officials. The storm water management plan is consistent with the standards of the Washington Department of Ecology Stormwater Management Manual for the Puget Sound Basin. The Public Works Department inspected construction. The materials used in construction conform to the Standard Specifications of the Washington Department of Transportation. The road was constructed in accordance with the approved plans. The developer has provided mylar record drawings of the roads to the Department. The road would extend the existing County Road system in the area. Accepting the road would be consistent with previous plats and road dedications in Port Ludlow. In consideration of the above, I recommend that the Board of County Commissioners approve the resolution accepting Mt. Constance Way and Mt. Christie Court as County Roads and adding them to the County Road Log. 100% Recycled Paper