Loading...
HomeMy WebLinkAbout041 02 · ce :PLÙ ? 7/'llò;).. \\eoSJ STATE OF WASHINGTON County of Jefferson In the Matter of: ) Updating the Official County Road Log: ) Frayn Street, Meg's Way, and Pete's Spur) RESOLUTION NO. 41-02 WHEREAS, the following roads have been established as Public Rights-of-Way in the Anderson Court Long Plat; and WHEREAS, the following roads have been constructed to the standards of the Jefferson County Department of Public Works; and WHEREAS, the following roads will be maintained at public expense; and WHEREAS, the Official County Road Log is filed in the County Engineer's Office; NOW, THEREFORE BE IT RESOLVED, that the County Engineer is hereby directed to make the following additions to the Official County Road Log: Road Number 634409 Road Name Frayn Street Section! Township/Range S2, T29N, R1 W. Milepost Begin!End 0.09 - 0.17 Intersects Thomas Drive, c.R. No. 635909; M.P. 0.11 Right 634009 Meg's Way S2, T29N, Rl W. 0.00 - 0,09 Mason Street, c.R. No. 637809; M.P. 0.23 Right 634209 Pete's Spur S2, T29N, R1 W. 0.00 - 0.11 Meg's Way, C.R. No. 634009; M.P. 0.03 Left Road Log Resolution Frayn street, Meg's Way, Pete's Spur RESOLUTION NO. 41-02 APPROVED AND ADOPTED this ~ay of SEAL: , . . .e r \, '\ r y ,. ') ~, .' ". r; .,.~.,. .~ ~). '"".,... '-. .!... II 'j , ,.,.. ('4 " ~ V' ~ IO' 1.,. \".¡ ..;1 , :,)a.\ ~~.....~ ': \ Ii:- ;/1:: "'~ \ " " ," . ~ '.' . , Fl' . . .~: .) .; <: ;.. ;\ J ATTÉST:"-"'::-' :' . ., .) .J'" \,"-' Lorna L. Delaney, CMC Clerk of the Board Road Log Resolution Frayn Street, Meg's Way, Pete's Spur .... , 2002. .-:;.::> 2 JEFFERSON COUNTY DEPARTMENT OF PUBLIC WORKS \ P.O. Box 2070 1322 Washington St. Port Townsend, WA 98368 (360) 385-9160 Frank Gifford, Public Works Director Robert G. Turpin, PE., County Engineer MEMORANDUM TO: Jefferson County Board of Commissioners FROM: Bob Turpin, P.E., County Engineerµ? June 3, 2002 DATE: RE: Anderson Court Long Plat road dedications; County Engineer's Report The following three roads within Anderson Court Long Plat are proposed to be dedicated to the County: an extension of existing Frayne Street, Meg's Way, and Pete's Spur. Including these roads in the County road system will improve circulation and emergency access in the area. Frayn Street, which currently dead ends at the plat boundary, will be extended approximately 380 feet into the plat and be connected to Mason Street via Meg's Way. The Department reviewed and approved the road construction and drainage plans. The Department inspected the road construction and determined that the roads have been constructed to the adopted County standards: Compacted subgrade, 6 inches of compacted gravel base, 2 inches of compacted crushed surfacing top course, and 2" compacted Class B asphalt concrete. The driving lanes are 18 feet wide traveled way with 2 feet wide gravel shoulders. Street signs, stop sign, and monuments have been placed as per the Department's requirements, General Testing Laboratory has tested the gravel base, top course, and asphalt concrete pavement. They certify that these materials meet WSDOT materials specifications and the required compaction. In addition to constructing these roads, the applicant has constructed a water system that will serve the plat. The platted lots served by these roads will be developed for single family residences. In consideration of the above, I recommend that the Board of Commissioners accept the dedication of an extension to Frayn Street and Megan's Way and Pete's Spur as County Roads for inclusion in the road log. 100% Recycled Paper