HomeMy WebLinkAboutBLD2021-00573-07- Building Plans30'9"
13'4 1/2"11'9 1/2"5'7"
1 D. Fir 2 D. Fir 3 D. Fir 4 D. Fir
2 1/2"
9 1/2"
1
Client:ADAIR HOMES
Project:
Address:
Date:9/20/2021
Input by:Matthew Perkins
Job Name:2080
Project #:IWP31843
Level: MAINLEVELJ1-31 - MAIN LEVEL LPI 20 Plus 9.500"- PASSED
Version 21.40.338 Powered by iStruct Dataset: 21090801.276
Member Information
Type:Joist
Spacing:19.2" o.c.
Moisture Condition: Dry
Deflection LL: 480
Deflection TL: 240
Importance:Normal - II
Temperature: Temp <= 100°F
Application: Floor
Design Method: ASD
Building Code: IRC 2018
Load Sharing: No
Deck:3/4 APA Rated Sturd-I-
FloorOSB Nailed and
Glued
Reactions PATTERNED lb (Uplift)
Brg Direction Live Dead Snow Wind Const
1 Vertical375 (-25)104000
2 Vertical953 (-8)283000
3 Vertical691 (-115)173000
4 Vertical203 (-98)30000
Analysis Results
Analysis Actual Location Allowed Capacity Comb. Case
Neg Moment -1543 ft-lb 13'4 1/2" 2810 ft-lb 0.549 (55%) D+L LL_
Pos Moment 1313 ft-lb 5'8 3/16" 2810 ft-lb 0.467 (47%) D+L L_L
Shear 670 lb 13'4 1/2" 1260 lb 0.532 (53%) D+L LL_
LL Defl inch 0.162 (L/984) 6'4 3/4" 0.333 (L/480) 0.488 (49%) L L_L
TL Defl inch 0.202 (L/791) 6'4 3/16" 0.666 (L/240) 0.304 (30%) D+L L_L
Bearings
Bearing Length Dir. Cap. React D/L lb Total Ld. Case Ld. Comb.
1 - D. Fir 1.500" Vert 49% 103 / 370 473 L_L D+L
2 - D. Fir 5.500" Vert 51% 286 / 964 1250 LL_ D+L
3 - D. Fir 3.500" Vert 40% 171 / 714 885 _LL D+L
4 - D. Fir 1.500" Vert 25% 30 / 216 246 (-80) L_L D+L(D+L)
Design Notes
1 Provide support to prevent lateral movement and rotation at the end bearings. Lateral support
may also be required at the interior bearings by the building code.
2 Dead Load Deflection: Instant = 0.040", Long Term = 0.060".
3 Tie-down connection required at bearing 4 for uplift 80 lb (Combination D+L, Load Case
L_).
4 Bottom flange must be laterally braced at a maximum of 6'3" o.c.
ID Load Type Location Trib Width Dead 0.9 Live 1 Snow 1.15 Wind 1.6 Const. 1.25 Comments
1 Uniform 1-7-3 12 PSF 40 PSF 0 PSF 0 PSF 0 PSF FLR LOAD
This design is valid until 5/24/2024
Louisiana-Pacific Corp
414 Union Street, Suite 2000
Nashville, TN 37219
888) 820-0325
www.lpcorp.com
APA: PR-L238, ICC-ES: ESR-1305,
LADBS: RR-25099, Florida: FL15401
Manufacturer Info INTERNATIONAL WOOD PRODUCTS, LLC
14421 SE 98TH CT., OREGON
USA
97015
503-742-8689
Notes
This component analysis is based on the loads,
geometry and other conditions as entered by the user
and listed in this report. The user is responsible to
ensure the accuracy of the input and the applicability to
the actual conditions of the structure for which this
component is intended. This analysis is valid only for the
product listed.
Copyright 2020 All rights reserved by Louisiana Pacific
Corp. 414 Union St Suite 2000, Nashville, TN 37219
Page 1 of2RECEIVEDBYDCD10/19/2021
25'5"
13'10 1/2"11'6 1/2"
1 D. Fir 2 D. Fir 3 Hanger (IUS2.56/9.25 (Min))
2 1/2"
1'2"
1
Client:ADAIR HOMES
Project:
Address:
Date:9/20/2021
Input by:Matthew Perkins
Job Name:2080
Project #:IWP31843
Level: UPPERLEVELJ2-26 - UPPER LEVEL LPI 20 Plus 14.000"- PASSED
Version 21.40.338 Powered by iStruct Dataset: 21090801.276
Member Information
Type:Joist
Spacing:19.2" o.c.
Moisture Condition: Dry
Deflection LL: 480
Deflection TL: 240
Importance: Normal - II
Temperature: Temp <= 100°F
Application: Floor
Design Method: ASD
Building Code: IRC 2018
Load Sharing: No
Deck:3/4 APA Rated Sturd-I-
FloorOSB Nailed and
Glued
Ceiling:Gypsum 1/2"
Reactions PATTERNED lb (Uplift)
Brg Direction Live Dead Snow Wind Const
1 Vertical401 (-12)111000
2 Vertical987296000
3 Vertical335 (-57)81000
Analysis Results
Analysis Actual Location Allowed Capacity Comb. Case
Neg Moment -1660 ft-lb 13'10 1/2" 4400 ft-lb 0.377 (38%) D+L LL
Pos Moment 1368 ft-lb 6' 9/16" 4400 ft-lb 0.311 (31%) D+L L_
Shear 687 lb 13'10 1/2" 1680 lb 0.409 (41%) D+L LL
LL Defl inch 0.081 (L/2000) 6'9 13/16" 0.339 (L/480) 0.240 (24%) L L_
TL Defl inch 0.101 (L/1604) 6'9 1/8" 0.678 (L/240) 0.150 (15%) D+L L_
Bearings
Bearing Length Dir. Cap. React D/L lb Total Ld. Case Ld. Comb.
1 - D. Fir 4.500" Vert 42% 108 / 395 503 L_ D+L
2 - D. Fir 3.500" Vert 53% 302 / 1006 1308 LL D+L
3 -
Hanger
2.000" Vert 28% 78 / 331 409 _L D+L
Design Notes
1 Provide support to prevent lateral movement and rotation at the end bearings. Lateral support
may also be required at the interior bearings by the building code.
2 Dead Load Deflection: Instant = 0.020", Long Term = 0.030".
3 Fill all hanger nailing holes.
4 Web stiffeners required at Bearing 3.
ID Load Type Location Trib Width Dead 0.9 Live 1 Snow 1.15 Wind 1.6 Const. 1.25 Comments
1 Uniform 1-7-3 12 PSF 40 PSF 0 PSF 0 PSF 0 PSF FLR LOAD
This design is valid until 5/24/2024
Louisiana-Pacific Corp
414 Union Street, Suite 2000
Nashville, TN 37219
888) 820-0325
www.lpcorp.com
APA: PR-L238, ICC-ES: ESR-1305,
LADBS: RR-25099, Florida: FL15401
Manufacturer Info INTERNATIONAL WOOD PRODUCTS, LLC
14421 SE 98TH CT., OREGON
USA
97015
503-742-8689
Notes
This component analysis is based on the loads,
geometry and other conditions as entered by the user
and listed in this report. The user is responsible to
ensure the accuracy of the input and the applicability to
the actual conditions of the structure for which this
component is intended. This analysis is valid only for the
product listed.
Copyright 2020 All rights reserved by Louisiana Pacific
Corp. 414 Union St Suite 2000, Nashville, TN 37219
Page 2 of2RECEIVEDBYDCD10/19/2021
RECEIVED BY DCD 10/19/2021
RECEIVED BY DCD 10/19/2021
RECEIVED BY DCD 10/19/2021
RECEIVED BY DCD 10/19/2021
RECEIVED BY DCD 10/19/2021
RECEIVED BY DCD 10/19/2021
RECEIVED BY DCD 10/19/2021
RECEIVED BY DCD 10/19/2021
RECEIVED BY DCD 10/19/2021
RECEIVED BY DCD 10/19/2021
RECEIVED BY DCD 10/19/2021
RECEIVED BY DCD 10/19/2021
RECEIVED BY DCD 10/19/2021
RECEIVED BY DCD 10/19/2021
RECEIVED BY DCD 10/19/2021
RECEIVED BY DCD 10/19/2021
RECEIVED BY DCD 10/19/2021
RECEIVED BY DCD 10/19/2021
RECEIVED BY DCD 10/19/2021
RECEIVED BY DCD 10/19/2021
RECEIVED BY DCD 10/19/2021
RECEIVED BY DCD 10/19/2021
RECEIVED BY DCD 10/19/2021
RECEIVED BY DCD 10/19/2021
RECEIVED BY DCD 10/19/2021
RECEIVED BY DCD 10/19/2021
RECEIVED BY DCD 10/19/2021
RECEIVED BY DCD 10/19/2021
RECEIVED BY DCD 10/19/2021
RECEIVED BY DCD 10/19/2021
RECEIVED BY DCD 10/19/2021
RECEIVED BY DCD 10/19/2021