Loading...
HomeMy WebLinkAboutBLD2021-00671_01RECEIVED BY DCD 11/17/21 RECEIVED BY DCD 11/17/21 RECEIVED BY DCD 11/17/21 RECEIVED BY DCD 11/17/21 RECEIVED BY DCD 11/17/21 JEFFERSON COUNTY DEPARTMENT OF COMMUNITY DEVELOPMENT 621 Sheridan Street | Port Townsend, WA 98368 360-379-4450 | email: dcd@co.jefferson.wa.us www.co.jefferson.wa.us/commdevelopment  BUILDING PERMIT REVISION Date Regarding: Building Permit Number Address Parcel Number Other Case Number/s Submitted by: Phone: Submittal Explanation (what’s being revised?): Please complete the following, if applicable: Permit Type & Square Footage PERMIT TYPE: APPROVED SQ/FT: CHANGE TO SQ/FT: TOTAL SQFT: Commercial Residential Garage/Shop Accessory Uncovered Porch Covered Porch Unfinished Basement Other (Specify) Estimated Fair Market value cost of changes: No change to square footage REVISED 1/27/2022 1/26/2022 BLD2021-00671 5447 Paradise Bay Rd, Port Ludlow 98365 821351025 Emily - Estes Builders 360-516-0701 Submitting a revised site plan with the house moving to project north 5 feet due to a disputed property line. The new side setbacks will be 6'1" on the project north line, and 10' to the south property line (5' to the disputed property line). No other changes occurred. As to the disputed property line we have learned that when it was originally platted the line was marked 5' off of where it should be and there have been conflicting surveys locating the property line at two different locations. Our client may pursue litigation to resolve the dispute with the neighbor but in the meantime their build will continue away from the property line. No change in cost 4 Estimated Fair Market value cost of changes: If the revision involves structural and/or floor plan changes, the following is required: A narrative describing the changes and page number in set of plans where change occurs Two copies of only the revised building plans - clearly marked by a border/bubble Two copies of revised floor plan on no larger than 11x17 Minimum fees: Plan Check - $102.00 DCD010 Land Use - $102.00 DCD018 Administrative - $102.00 DCD010 Environmental Health - $148.00 EH038 Environmental Health - $75.00 EH041 - Review of resubmission before Building Permit is approved Technology Fee - 5% of total fees DCD003 If the revision involves changes to the site plan, the following is required: A narrative describing the changes on the site plan- if they were requested by a department please note who requested them Two copies of the revised site plan on no larger than 11x17 – revisions clearly marked by a border/bubble Minimum fees: Administrative - $103.00 DCD010 Land Use - $103.00 DCD018 Environmental Health - $148.00 EH038 Environmental Health - $75.00 EH041 - Review of resubmission before Building Permit is approved Technology Fee - 5% of total fees DCD003 Fees shall be collected at the time of re-submittal. Revisions that go beyond the minimum revision time during Plan Check, Land Use review, and Environmental Health review will be charged an additional hour. Any additional fees that are accrued during the revision process must be paid prior to the approval and issuance of the revised permit. All revisions to structural components or plans that previously included structural engineering will need to have the revision wet stamped and signed by a design professional (engineer, architect etc.) licensed in WA state. Please route copy to: EH: Planning: PW: Building: Office use only Please Check with DCD for total fees REVISED 1/27/2022 No change in cost