HomeMy WebLinkAboutCape George TIA - 9-29-21CAPE GEORGE BLA TRAFFIC IMPACT ANALYSIS Jefferson County, WA Prepared for: c/o Mr. Steve Voorhies Larson & Associates svoorhies@rrlarson.com HEATH & ASSOCIATES, INC Transportation and Civil Engineering 09/24/2021 PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com Revised September 2021 Sep 29 2021 HEATH & ASSOCIATES, INC Transportation and Civil Engineering September 24, 2021 Shannen Cartmel Jefferson County Department of Community Development Subject: Revisions to Cape George BLA Traffic Impact Analysis. This letter is in response to the John Fleming’s April 21, 2021 comments regarding the submitted TIA. Comments: 1. The study was conducted during the COVID-19 pandemic with an advisory to limit non- essential travel. How does the TIA acknowledge COVID-19 travel restrictions and adjust its findings? To evaluate travel pattern skews associated with COVID-19 travel restrictions at the time of field counts, intersection volumes gathered by our firm were compared to 2019 data at the study intersection of SR-20 & Discovery Road. It should be noted that data was collected by our firm in September of 2020 and that the 2019 data was derived from the SR 20/Discovery Road & SR 20/Kearney Street Roundabouts Intersection Control Evaluation report. Total intersection volumes in the 2019 count were found to be 19% higher than total 2020 volumes. Therefore, existing traffic volumes at all intersections collected by our firm were adjusted up by 20%. This adjustment factor is anticipated to account for travel pattern skews, sufficiently establishing baseline conditions. All associated Figures and calculations have been revised accordingly. 2. The TIA was compared to the Jefferson County TIA Technically Complete Checklist. Regarding trip generation, the assumption that only one dwelling per parcel may understate the impact of the proposal on the County transportation system. With the current focus on affordable housing within the County, many are choosing to construct accessory dwelling units in addit ion to main dwellings on single parcels. Unless there will be a restriction on the new parcels to have only one dwellin g, the TIA should revise the report to consider the trip generation for twice the number of dwellings (140 dwellings). Comment acknowledged regarding the potential construction of ADUs on the subject parcels. Current ITE data does not encompass extensive research concerning the construction of ADU’s on single-family dwelling unit parcels. However, LUC 210 – Detached Single-Family Housing rates comprised within ITE data are assumed to capture all traffic generated from a single-family zoned site—with or without an ADU. Therefore, trip generation associated with the proposed 68 single-family dwelling unit development was retained and used for analysis. PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 3. The TIA does not discuss the existing roadway deficiencies of lane and shoulder widths. For example, Cape George Road has a current ADT of 2297, with a 26 feet total roadway width consisting of 11 feet wide lanes and 2 feet wide shoulders. The typical road section for that traffic need a 40 feet total roadway width consisting of 12 feet wide lanes and 8 feet wide shoulders. Comment acknowledged regarding the discussion of existing roadway deficiencies. Upon review of existing roadway characteristics and ADT volumes, the surrounding roadway system’s existing geometrics are deemed adequate for observed travel volumes. Eleven-foot-wide travel lanes are sufficient to accommodate the projected ADT volumes. If deemed necessary, the County may want to consider a potential future improvement project along Cape George Road to bring the corridor up to current County standards. 4. The TIA does not discuss accident history or safety concerns. The TIA was revised to include an accident history section. No safety concerns are identified at the study intersections based on accident history data at this time. 5. The TIA does not analyze school bus stops. The TIA was revised to analyze school bus stops. 6. Permanent through access for the subdivision onto Nelson’s Landing Road is not permitted. Nelson’s Landing Road is lacking a 60 foot right of way dedicated to the County, and a roadway that meets County standards. TIA should model all traffic accessing the south parcels from S. Discovery Road. The site plan was revised and site access is no longer provided onto Nelson’s Landing Road. Trip distribution was updated to reflect this change in access. All associated Figures and calculations have been updated accordingly. All other minor redline comments have been addressed as necessary. Please call should you have any questions or require anything further. Sincerely, Aaron Van Aken, P.E., PTOE PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com CAPE GEORGE BLA TRAFFIC IMPACT ANALYSIS TABLE OF CONTENTS 1. Introduction ...................................................................................................................3 2. Project Description ........................................................................................................3 3. Existing Conditions ........................................................................................................5 4. Forecast Traffic Demand and Analysis ....................................................................... 11 5. Conclusions & Mitigation ............................................................................................. 20 Appendix LIST OF TABLES 1. Existing PM Peak Hour Level of Service .......................................................................9 2. Accident History .......................................................................................................... 10 3. Project Trip Generation ............................................................................................... 11 4. Forecast 2026 PM Peak Hour Level of Service .......................................................... 18 LIST OF FIGURES 1. Aerial View ....................................................................................................................3 2. Site Plan ........................................................................................................................4 3. Existing PM Peak Hour Volumes ..................................................................................6 4A. PM Peak Hour Trip Distribution & Assignment: Outlying Intersections ....................... 13 4B. PM Peak Hour Trip Distribution & Assignment: Access Intersections ......................... 14 5. Forecast 2026 PM Peak Hour Background Volumes .................................................. 15 6A. Forecast 2026 PM Peak Hour Volumes With Project: Outlying Intersections ............. 16 6B. Forecast 2026 PM Peak Hour Volumes With Project: Access Intersections ............... 17 PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 2 CAPE GEORGE BLA TRAFFIC IMPACT ANALYSIS 1. INTRODUCTION The main goals of this study focus on the assessment of existing roadway conditions and forecasts of newly generated project traffic. The first task includes the review of general information on the roadways serving the site, public transportation information, and baseline level of service. Forecasts of future traffic and dispersion patterns on the street system are then determined using established trip generation and distribution techniques. As a final step, appropriate conclusions and mitigation measures are defined if needed. 2. PROJECT DESCRIPTION Cape George BLA is a proposed single-family project consisting of 68 dwelling units in unincorporated Jefferson County. The subject site comprises several parcels for a collective area of approximately 22-acres. Presently, the subject properties contain 23 recognized parcels that could be constructed with single-family homes. The proposal seeks to increase the lot count to up to 68 single-family dwelling units. See below aerial image illustrating the project boundaries. A conceptual site plan is presented in Figure 2 which identifies project access and layout configuration. For reference herein, the “north portion” is considered the area on the north side of Cape George Road encompassing 40 lots; the “central portion” is the area on the south side of Cape George Road with 9 lots; and the “south portion” is the southernmost area north of Nelson’s Landing Road with the remaining 19 lots. Figure 1: Aerial View PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 3 FIGURE 2HEATH & ASSOCIATESTRAFFIC AND CIVIL ENGINEERINGSITE PLANNCAPE GEORGE BLAPO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 4 3. EXISTING CONDITIONS 3.1 Existing Street System The primary roadways serving the subject site are listed and described below. Cape George Road: is a two-lane minor collector roadway bisecting the subject site. Travel lanes are approximately 10- to 11-feet wide. Shoulders are composed of narrow paved segments or grass/gravel. West with its intersection to S Discovery Road, the roadway has a posted speed limit of 35 mph. Approximately 1,200 feet west of S Discovery Road, the speed limit increases to 50 mph. This speed limit transition occurs along the subject site frontage between tax parcel #’s 96360-0701 and -0801. S Discovery Road: is a north-south, two-lane minor collector roadway located east and south of the subject site. Travel lanes are approximately 11-feet wide. Shoulders are composed of paved segments 3- to 7-feet wide. The roadway has a posted speed limit of 35-40 mph near the subject site. 3.2 Existing Peak Hour Volumes and Travel Patterns Field data for this study was obtained and collected in September of 2020. Traffic counts were performed at the following intersections, which are anticipate to receive the bulk of anticipated vehicular impacts: • Cape George Rd/Florence St & S Discovery Rd • S Jacob Miller Rd & S Discovery Rd • S Jacob Miller Rd & Hwy 20 • Discovery Rd (Mill Rd) & S Discovery Rd • Hwy 20/W Sims Way & Discovery Rd/Mill Rd Field data was collected from 4:00 PM - 6:00 PM, which generally reflects the highest levels of congestion with respect to traffic and delays during a 24-hour period. The busiest one-hour is then derived from the each intersection count, known as the peak hour, to depict worst case conditions. To determine travel pattern skews associated with COVID-19 travel restrictions in place at the time of field counts, intersection volumes at Highway 20/W Sims Way & Discovery Road/Mill Road were compared with 2019 data at the intersection. Total intersection volumes from the 2019 count, derived from the SR 20/Discovery Road & SR 20/Kearney Street Roundabouts Intersection Control Evaluation report, were shown to be 19% higher than 2020 data collected by our firm. Therefore, traffic volumes at all study intersections collected by our firm was grossed up by 20% to establish baseline conditions. Figure 3 on the following page illustrates the intersections of study and their associated weekday PM peak hour volumes. Full count sheets are provided in the appendix. PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 5 PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 6 3.3 Transit Service A review of the Jefferson Transit regional route maps indicates the nearest transit routes in the area are served via Route 1 – Brinnon / Quilcene / Tri Area Route, Route 6A/6B – Tri Area Loop, Route 7 – Poulsbo / Port Ludlow / Tri Area Route and Route 8 – Sequim Route. The nearest stop providing service to these routes is located at the intersection of S Jacob Miller Road & Highway 20 (~0.51 miles northeast). Service is provided weekdays from approximately 5:45 AM - 6:57 PM and Saturdays from approximately 6:35 AM - 7:55 PM with stops at major intersections along the routes. Additionally, these routes provide connection to Haines Park and Ride. Haines Park and Ride, located ~2.25 miles northeast of the subject site, provides service to Kingston, Olympia, Port Angeles, SeaTac, Seattle and the Coho Ferry. Moreover, the Port Townsend Ferry Terminal is located approximately 3.23 miles northeast of the proposed development. Service is provided from this terminal to Coupeville daily from 6:30 AM – 9:10 PM. Given the nature of the incoming project and proximity, transit use is anticipated. Refer to the Jefferson Transit schedule and WSDOT Winter 2021 Sailing Schedule for more detailed information. 3.4 Non-Motorist Traffic & School Bus Stop Provisions During field observations, little non-motorist transport was observed at the study intersections. The area is generally rural in nature with limited walkable nearby amenities aside from the Larry Scott Trail. Sidewalks and/or bike lanes, become available to the north near city of Port Townsend limits. The Larry Scott Trail bisects the subject site and travels from the Port Townsend waterfront to the Milo Curry Trailhead. The trail is approximately 7.3 miles long and provides multi-use non-motorist recreational opportunities. It should additionally be noted that school bus stops are provided in the vicinity of the subject site. The graphic to the right depicts morning school bus pick up locations in green and afternoon drop off locations in red. School-aged children residing in the proposed development would have immediate access to school bus service. PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 7 3.5 Project Accesses Access to and from the site is proposed via five connections to the local street system. Four accesses are proposed on Cape George Road serving the north and central portions. A single access by way of S Discovery Road is proposed to serve the south portion. See Figure 2 for site plan design and proposed locations. All new accesses shall be designed so as to allow sufficient sight lines in accordance with Jefferson County and American Association of State Highway and Transportation Officials (AASHTO) standards. A final survey for sight line requirements/verification may be required upon final site design. 3.6 Roadway Improvements A review of the current Jefferson County Six-Year 2021-2026 Transportation Improvement Program, the Port Townsend Capitol Projects Directory and the WSDOT STIP (2021-2023) indicates that projects are currently planned in the vicinity of the site. Descriptions of the nearest improvement projects are summarized below. Roundabouts - Kearney Street and Mill Road at Highway 20: The scope of these projects intend to construct compact roundabouts on SR 20 at its intersections with Mill Road/Discovery Road and Kearney Street. The existing signal systems are outdated and have reached the end of their useful life. The roundabouts were shown to improve level of service and are expected to increase safety. SR 20 & Mill/Discovery Road is a study intersection in this evaluation; shown below is a conceptual intersection schematic. The project has an estimated cost of $970,000 with a construction date in Spring 2023. Discovery Road Bikeway & Sidewalks Project from Rainier Street to McClellan Street – STPUS-7627(001): The scope of this project intends to construct a bikeway and sidewalk on Discovery Road. The project has an estimated cost of $2,500,000 and is expected to begin in October 2021. PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 8 3.7 Level of Service Peak hour delays were determined through the use of the Highway Capacity Manual 6th Edition. Capacity analysis is used to determine level of service (LOS) which is an established measure of congestion for transportation facilities. The range1 for intersection level of service is LOS A to LOS F with the former indicating the best operating conditions with low control delays and the latter indicating the worst conditions with heavy control delays. Detailed descriptions of intersection LOS are given in the 2016 Highway Capacity Manual. Level of service calculations were made through the use of the Synchro 10 analysis program. Table 1 summarizes existing LOS and delays for the key intersections of study. Table 1: Existing PM Peak Hour Level of Service Delays given in seconds per vehicle ID Intersection Control Movement LOS Delay 1 S Discovery Rd & Cape George Rd/Florence St Stop EB B 11.4 2 S Discovery Rd & S Jacob Miller Rd Stop WB C 17.5 3 Hwy 20 & S Jacob Miller Rd Stop EB D 33.4 4 Discovery Rd (Mill Rd) & S Discovery Rd Stop SB C 21.4 5 Hwy 20/W Sims Way & Discovery Rd/Mill Rd Signal Overall C 26.7 County Level of Service Standards2 has adopted a standard of LOS C for rural roads outside an urban boundary line. Moreover, Highway 20 is considered as a Highway of Statewide Significance through WSDOT and has a LOS D standard at the associated intersections of study. 1 Signalized Intersections - Level of Service Stop Controlled Intersections – Level of Service Control Delay per Control Delay per Level of Service Vehicle (sec) Level of Service Vehicle (sec) A 10 A 10 B 10 and 20 B 10 and 15 C 20 and 35 C 15 and 25 D 35 and 55 D 25 and 35 E 55 and 80 E 35 and 50 F 80 F 50 Highway Capacity Manual, 6th Edition 2 Jefferson County Comprehensive Plan, Transportation Element. PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 9 As shown in Table 1, existing conditions operate satisfactori ly at LOS D or better for all directional movements during the critical PM peak travel hour. No operational deficiencies are identified for the study intersections. 3.8 Accident History A list of the recorded accident history from the beginning of 2016 through September 9 of 2021 for the intersections of study was requested from WSDOT. Table 2 below provides a summary of the collisions recorded per year for each study location. Table 2: Accident History Intersection 2016 2017 2018 2019 2020 2021 (Thru Sept. 9) Avg/Yr 1.S Discovery Rd & Cape George Rd 0 0 1 1 0 0 0.35 2.S Discovery Rd & S Jacob Miller Rd 6 2 0 0 1 1 1.74 3.Hwy 20 & S Jacob Miller Rd 2 3 2 0 0 0 1.22 4.Discovery Rd & S Discovery Rd 1 1 0 1 0 0 0.52 5.Hwy 20 & Discovery Rd 3 4 3 3 1 0 2.43 WSDOT data indicate a total of 36 recorded collisions at the five intersections of interest. Collision type and contributing factor breakdowns for each intersection are provided below. 1.S Discovery Road & Cape George Road /Florence Street: 2 accidents were recorded resulting in less than one collision per year. The occurrences were listed as “from opposite direction – one left turn, one straight” (1/2) and “rear-end” (1/2). 2.S Discovery Road & S Jacob Miller Road: a total of 10 accidents were recorded, resulting in approximately 1.74 collisions per year. The most common occurrence listed was “entering at angle” (9/10), followed by “rear-end” (1/10). 3.Highway 20 & S Jacob Miller Road: a total of 7 accidents were recorded, resulting in approximately 1.22 collisions per year. The most common occurrence listed was “from “rear-end” (5/7). Other include: “vehicle overturned” (1/8) and “sideswipe” (1/8). 4.Discovery Road (Mill Road) & S Discovery Road: a total of 3 accidents were recorded, resulting in approximately 0.52 collisions per year. The most common occurrence listed was “rear-end” (2/3), followed by “from same direction – all others” (1/3). 5.Highway 20/W Sims Way & Discovery Road /Mill Road: a total of 14 accidents were recorded, resulting in approximately 2.43 collisions per year. The most common occurrence listed was “rear-end” (7/14), followed by “entering at an angle” (4/14). Other notable occurrences include “vehicle - pedalcyclist” (3/14). PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 10 Most accidents resulted in driver inattentive/distraction as opposed to any identifiable geometric deficiencies. Out of all 36 crashes, 24 collisions resulted in no apparent injury. Eight collisions resulted in possible injury, while 4 collision resulted in suspected minor injury. No fatalities were recorded. The three collisions occurring at Highway 20 & Discovery Road involving non-motorists resulted in possible injury/suspected minor injury. Contributing factors listed for these non-motorist collisions included “non-motorist on wrong side of road”, “did not grant RW to non-motorist” and “inattention”. 4. FORECAST TRAFFIC DEMAND AND ANALYSIS 4.1 Project Trip Generation Trip generation is defined as the number of vehicle movements that enter or exit the respective project site during a designated time period such as the PM peak hour or an entire day. The magnitude of the anticipated vehicle trip generation for the proposed project was derived from the Institute of Transportation Engineers (ITE) publication, Trip Generation, 10th Edition. The designated land use is defined as Single-Family Detached Housing (LUC 210). Dwelling units was used as the input variable and equations were used to determine trip ends. Table 3 summarizes anticipated vehicular movements for the average weekday daily trips (AWDT), AM peak hour and PM peak hour. Table 3: Project Trip Generation Land Use Dwelling Units AWDT AM Peak-Hour Trips PM Peak-Hour Trips In Out Total In Out Total Single-Family 68 729 13 40 53 44 26 70 The project is estimated to generate 729 new average weekday daily trips with 53 trips (13 inbound / 40 outbound) occurring the AM peak hour and 70 trips (44 inbound / 26 outbound) in the PM peak hour. PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 11 4.2 Distribution & Assignment Trip distribution describes the anticipated travel routes for inbound and outbound project traffic during the peak hour study period. Trip distribution percentages are based on the location of nearby major arterials and amenities. PM peak hour trips are primarily comprised of commuter-based (returning home) and recreational-based trips. Anticipated distribution percentages and travel routes for the outlying study intersections (Figure 4A) and access intersections (Figure 4B) are illustrated on the following pages. 4.3 Future Peak Hour Volumes A 5-year horizon of 2026 was used for future traffic delay analysis to depict conditions with full project buildout based upon current zoning. Forecast 2026 background PM peak hour volumes were derived by applying a 1.0 percent compound annual growth rate per year to the existing traffic volumes, which has been used for nearby analysis in the past. Forecast 2026 PM peak hour volumes without project are shown in Figure 5. Figures 6A and 6B illustrate forecast 2026 volumes with the addition of project-generated traffic at the outlying study intersections and access intersections. PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 12 PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 13 HEATH & ASSOCIATESTRAFFIC AND CIVIL ENGINEERINGPM PEAK HOUR TRIP DISTRIBUTION & ASSIGNMENTNACCESS INTERSECTIONSPM PEAK HOUR TRIP DISTRIBUTION & ASSIGNMENTFIGURE 4BA& NW ACCESSCAPE GEORGE RDB& SW ACCESS332003CAPE GEORGE RDC& NE ACCESSCAPE GEORGE RDD& SE ACCESSCAPE GEORGE RD12301NEW PM PEAK HOUR TRIPSINBOUND: 44 VPHOUTBOUND: 26 VPH1CAPE GEORGE BLAABCDEE& S DISCOVERY RDACCESS11111166%6%28%10%50%0132164127310017PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 14 PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 15 PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 16 HEATH & ASSOCIATESTRAFFIC AND CIVIL ENGINEERINGFORECAST 2026 PM PEAK HOUR VOLUMES WITH PROJECTACCESS INTERSECTIONSFIGURE 6BCAPE GEORGE BLANA& NW ACCESSCAPE GEORGE RDB& SW ACCESS135320093CAPE GEORGE RDC& NE ACCESSCAPE GEORGE RDD& SE ACCESSCAPE GEORGE RD123132911ABCDEE& S DISCOVERY RDACCESS1112070116013211389411593100107PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 17 4.4 Future Level of Service Level of service analyses were made of the future 2026 PM peak hour volumes without and with project related trips added to the key roadways and intersections. This analysis once again involved the use the Synchro 10 analysis program. Delays for the key intersection movements under future conditions are shown in Table 4 below. Table 4: Forecast 2026 PM Peak Hour Level of Service Background With Project ID Intersection Control Movement LOS Delay LOS Delay 1. S Discovery Rd & Cape George Rd/Florence St Stop EB B 11.6 B 12.4 2. S Discovery Rd & S Jacob Miller Rd Stop WB C 18.6 C 23.7 3. Hwy 20 & S Jacob Miller Rd Stop EB E 39.2 E 48.9 4. Discovery Rd (Mill Rd) & S Discovery Rd Stop SB C 24.2 D 26.7 5. Hwy 20/W Sims Way & Discovery Rd/Mill Rd Signal Overall C 31.1 D 35.3 A. Cape George Rd & Northwest Access Stop SB - - A 9.6 B. Cape George Rd & Southwest Access Stop SB - - A 8.8 C. Cape George Rd & Northeast Access Stop SB - - B 10.1 D. Cape George Rd & Southeast Access Stop EB - - A 8.9 E. S Discovery Rd & Access Stop EB - - A 9.6 The outlying study intersections are shown to operate with LOS E or better conditions. All accesses are anticipated to operate with minimal delays at LOS B or better conditions. The following outlying study intersections are anticipated to operate with substandard service levels under forecast conditions. Highway 20 & S Jacob Miller Road: is shown to operate with substandard service levels both without and with the proposed development at LOS E conditions. This three-leg intersection contains a left-turn lane and receiving lane along SR-20. The predominate movement in the peak hour from the minor-road is right-turns accounting for 113/127 peak hour movements. Therefore no recommended mitigation is identified as the intersection is PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 18 built out and separate left- & right-turn lanes on S Jacob Miller Road may not provide much benefit given that ~90% movements are right-turns. Should future improvements be deemed necessary from County/State review, it is recommended that the project contribute a pro rata share towards any future improvement project such as signalization or roundabout. Discovery Road (Mill Road) & S Discovery Road: is shown to operate with substandard service levels with the proposed development. It should be noted that the nearby study intersection of Highway 20/W Sims Way & Discovery Road/Mill Road is planned for a future roundabout due to the outdated traffic signal equipment. WSDOT’s Intersection Control Evaluation indicates the intersection is anticipated to operate with LOS A conditions once constructed. The roundabout was not assumed in the analysis due to uncertain funding/construction timing. The construction of the roundabout at Highway 20/W Sims Way & Discovery Road/Mill Road is anticipated to improve conditions at Discovery Road (Mill Road) & S Discovery Road. Compared with the current signalized configuration, the construction of a roundabout is anticipated to lessen delays and queues experienced at the nearby stop- controlled intersection. Overall, the project is not shown to have a significant impact to the study intersection and no mitigation is deemed necessary at the intersection. 4.5 Left Turn Lane Warrant Left turn lanes are a means of providing necessary storage space for left turning vehicles at intersections. For this impact study, procedures prescribed by the WSDOT Design Manual Exhibit 1310-7a were used to ascertain storage requirements at the proposed access locations. Based on forecast 2026 PM peak hour volumes with project traffic – a left turn lane would not be warranted at any of the proposed access intersections. Refer to the appendix for the warrant nomographs. PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 19 5. CONCLUSIONS AND MITIGATION MEASURES Cape George BLA proposes for the construction potential of up to 68 single-family dwelling units in unincorporated Jefferson County. The subject site is located on the west side of S Discovery Road, situated between Cape George Road and Nelson’s Landing Road. The subject properties could currently construct 23 single-family homes, therefore the proposal seeks to increase the number of units by 45 (68 total). A conceptual site design with proposed accesses is illustrated in Figure 2. In total, approximately 53 AM (13 inbound / 40 outbound) peak hour trips and 70 PM (44 inbound / 26 outbound) peak hour trips are anticipated to travel to/from the development on a daily basis assuming all 68 developable lots. Existing intersection capacity indicates all intersections of study meeting WSDOT and County level of service standards. A five-year horizon of 2026 was analyzed to assess operations with the project fully- constructed and occupied. All access intersections and outlying study intersections 1, 2 and 5 are shown to operate with acceptable service levels, meeting County and WSDOT standards. Sight lines may need to be verified upon final site plan and access locations. It should be noted that WSDOT plans for the construction of a roundabout at the intersection of Highway 20/W Sims Way & Discovery Road/Mill Road to replace the dated traffic signal system. The roundabout would improve capacity and intersection operations and is expected to begin construction in Spring 2023. Moreover, construction of the roundabout is anticipated to improve service levels at the adjacent Discovery Road (Mill Road) & S Discovery Road intersection. Therefore, no mitigation is deemed necessary at the study intersection. Additionally, the study intersection of Highway 20 & S Jacob Miller Road was found to operate with substandard service levels both without and with the proposed project. Given existing intersection configuration and geometrics, no mitigation is deemed necessary at the intersection at this time. Should future improvements, such as signalization or roundabout control, be deemed necessary at the intersection, it is recommended that the Cape George development contribute via a pro-rata share towards construction costs of the selected improvement project. Based on the analysis above, no off-site mitigation is identified at this time. PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 20 CAPE GEORGE BLA TRAFFIC IMPACT ANALYSIS APPENDIX PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 21 File Name : 4489a Site Code : 00004489 Start Date : 9/22/2020 Page No : 1 Groups Printed- Passenger + - Trucks Discovery Rd Southbound Discovery Rd (Mill Rd) Westbound S Discovery Rd Northbound Driveway Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total 04:00 PM 0 28 25 53 16 0 26 42 23 16 0 39 0 0 0 0 134 04:15 PM 0 13 36 49 11 0 26 37 16 15 0 31 0 0 0 0 117 04:30 PM 0 18 31 49 10 0 20 30 22 9 0 31 0 0 0 0 110 04:45 PM 0 26 22 48 13 0 25 38 16 13 0 29 0 0 0 0 115 Total 0 85 114 199 50 0 97 147 77 53 0 130 0 0 0 0 476 05:00 PM 0 24 21 45 13 0 39 52 10 12 0 22 0 0 0 0 119 05:15 PM 0 16 20 36 18 0 33 51 16 5 0 21 0 0 0 0 108 05:30 PM 0 5 26 31 24 0 31 55 9 9 0 18 0 0 0 0 104 05:45 PM 0 12 18 30 13 0 29 42 12 7 0 19 0 0 0 0 91 Total 0 57 85 142 68 0 132 200 47 33 0 80 0 0 0 0 422 Grand Total 0 142 199 341 118 0 229 347 124 86 0 210 0 0 0 0 898 Apprch %0 41.6 58.4 34 0 66 59 41 0 0 0 0 Total %0 15.8 22.2 38 13.1 0 25.5 38.6 13.8 9.6 0 23.4 0 0 0 0 Passenger +0 140 194 334 118 0 226 344 124 84 0 208 0 0 0 0 886 % Passenger +0 98.6 97.5 97.9 100 0 98.7 99.1 100 97.7 0 99 0 0 0 0 98.7 Trucks 0 2 5 7 0 0 3 3 0 2 0 2 0 0 0 0 12 % Trucks 0 1.4 2.5 2.1 0 0 1.3 0.9 0 2.3 0 1 0 0 0 0 1.3 Heath & Associates 2214 Tacoma Rd E Puyallup, WA, 98371 PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 22 File Name : 4489a Site Code : 00004489 Start Date : 9/22/2020 Page No : 2 Discovery Rd Southbound Discovery Rd (Mill Rd) Westbound S Discovery Rd Northbound Driveway Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:00 PM 04:00 PM 0 28 25 53 16 0 26 42 23 16 0 39 0 0 0 0 134 04:15 PM 0 13 36 49 11 0 26 37 16 15 0 31 0 0 0 0 117 04:30 PM 0 18 31 49 10 0 20 30 22 9 0 31 0 0 0 0 110 04:45 PM 0 26 22 48 13 0 25 38 16 13 0 29 0 0 0 0 115 Total Volume 0 85 114 199 50 0 97 147 77 53 0 130 0 0 0 0 476 % App. Total 0 42.7 57.3 34 0 66 59.2 40.8 0 0 0 0 PHF .000 .759 .792 .939 .781 .000 .933 .875 .837 .828 .000 .833 .000 .000 .000 .000 .888 Passenger +0 83 109 192 50 0 96 146 77 52 0 129 0 0 0 0 467 % Passenger +0 97.6 95.6 96.5 100 0 99.0 99.3 100 98.1 0 99.2 0 0 0 0 98.1 Trucks 0 2 5 7 0 0 1 1 0 1 0 1 0 0 0 0 9 % Trucks 0 2.4 4.4 3.5 0 0 1.0 0.7 0 1.9 0 0.8 0 0 0 0 1.9 Discovery Rd Driveway Discovery Rd (Mill Rd) S Discovery Rd Right 0 0 0 Thru 83 2 85 Left 109 5 114 InOut Total 102 192 294 1 7 8 103 302 199 Right50 0 50 Thru0 0 0 Left96 1 97 OutTotalIn186 146 332 5 1 6 191 338 147 Left 0 0 0 Thru 52 1 53 Right 77 0 77 Out TotalIn 179 129 308 3 1 4 182 312 130 Left0 0 0 Thru0 0 0 Right0 0 0 TotalOutIn0 0 0 0 0 0 0 0 0 Peak Hour Begins at 04:00 PM Passenger + Trucks Peak Hour Data North Heath & Associates 2214 Tacoma Rd E Puyallup, WA, 98371 PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 23 File Name : 4489b Site Code : 00004489 Start Date : 9/22/2020 Page No : 1 Groups Printed- Passenger + - Trucks W Sims Way Southbound Mill Rd Westbound Highway 20 Northbound Discovery Rd (Mill Rd) Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total 04:00 PM 28 167 0 195 4 2 9 15 4 117 14 135 26 2 21 49 394 04:15 PM 26 143 0 169 0 1 11 12 5 120 10 135 36 2 16 54 370 04:30 PM 20 148 0 168 1 2 7 10 12 115 10 137 29 2 18 49 364 04:45 PM 24 188 1 213 0 1 5 6 0 102 12 114 24 3 14 41 374 Total 98 646 1 745 5 6 32 43 21 454 46 521 115 9 69 193 1502 05:00 PM 36 207 0 243 0 3 17 20 2 109 14 125 21 0 11 32 420 05:15 PM 34 147 2 183 1 0 5 6 0 85 17 102 19 1 17 37 328 05:30 PM 28 118 3 149 1 1 5 7 3 103 24 130 27 0 9 36 322 05:45 PM 26 96 1 123 2 1 9 12 4 85 15 104 17 0 13 30 269 Total 124 568 6 698 4 5 36 45 9 382 70 461 84 1 50 135 1339 Grand Total 222 1214 7 1443 9 11 68 88 30 836 116 982 199 10 119 328 2841 Apprch %15.4 84.1 0.5 10.2 12.5 77.3 3.1 85.1 11.8 60.7 3 36.3 Total %7.8 42.7 0.2 50.8 0.3 0.4 2.4 3.1 1.1 29.4 4.1 34.6 7 0.4 4.2 11.5 Passenger +217 1195 6 1418 8 11 55 74 23 822 115 960 195 10 118 323 2775 % Passenger +97.7 98.4 85.7 98.3 88.9 100 80.9 84.1 76.7 98.3 99.1 97.8 98 100 99.2 98.5 97.7 Trucks 5 19 1 25 1 0 13 14 7 14 1 22 4 0 1 5 66 % Trucks 2.3 1.6 14.3 1.7 11.1 0 19.1 15.9 23.3 1.7 0.9 2.2 2 0 0.8 1.5 2.3 Heath & Associates 2214 Tacoma Rd E Puyallup, WA, 98371 PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 24 File Name : 4489b Site Code : 00004489 Start Date : 9/22/2020 Page No : 2 W Sims Way Southbound Mill Rd Westbound Highway 20 Northbound Discovery Rd (Mill Rd) Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:15 PM 04:15 PM 26 143 0 169 0 1 11 12 5 120 10 135 36 2 16 54 370 04:30 PM 20 148 0 168 1 2 7 10 12 115 10 137 29 2 18 49 364 04:45 PM 24 188 1 213 0 1 5 6 0 102 12 114 24 3 14 41 374 05:00 PM 36 207 0 243 0 3 17 20 2 109 14 125 21 0 11 32 420 Total Volume 106 686 1 793 1 7 40 48 19 446 46 511 110 7 59 176 1528 % App. Total 13.4 86.5 0.1 2.1 14.6 83.3 3.7 87.3 9 62.5 4 33.5 PHF .736 .829 .250 .816 .250 .583 .588 .600 .396 .929 .821 .932 .764 .583 .819 .815 .910 Passenger +104 677 0 781 1 7 36 44 16 435 45 496 107 7 58 172 1493 % Passenger +98.1 98.7 0 98.5 100 100 90.0 91.7 84.2 97.5 97.8 97.1 97.3 100 98.3 97.7 97.7 Trucks 2 9 1 12 0 0 4 4 3 11 1 15 3 0 1 4 35 % Trucks 1.9 1.3 100 1.5 0 0 10.0 8.3 15.8 2.5 2.2 2.9 2.7 0 1.7 2.3 2.3 W Sims Way Discovery Rd (Mill Rd) Mill Rd Highway 20 Right 104 2 106 Thru 677 9 686 Left 0 1 1 InOut Total 494 781 1275 12 12 24 506 1299 793 Right1 0 1 Thru7 0 7 Left36 4 40 OutTotalIn23 44 67 4 4 8 27 75 48 Left 45 1 46 Thru 435 11 446 Right 16 3 19 Out TotalIn 820 496 1316 16 15 31 836 1347 511 Left58 1 59 Thru7 0 7 Right107 3 110 TotalOutIn156 172 328 3 4 7 159 335 176 Peak Hour Begins at 04:15 PM Passenger + Trucks Peak Hour Data North Heath & Associates 2214 Tacoma Rd E Puyallup, WA, 98371 PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 25 File Name : 4489c Site Code : 00004489 Start Date : 9/22/2020 Page No : 1 Groups Printed- Passenger + - Trucks S Discovery Rd Southbound S Jacob Miller Rd Westbound S Discovery Rd Northbound S Jacob Miller Rd Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total 04:00 PM 8 48 2 58 1 26 12 39 5 27 1 33 4 22 11 37 167 04:15 PM 4 35 0 39 1 8 11 20 8 25 0 33 0 14 7 21 113 04:30 PM 6 37 0 43 0 15 11 26 11 29 0 40 0 16 5 21 130 04:45 PM 8 44 0 52 1 8 8 17 7 16 0 23 0 15 7 22 114 Total 26 164 2 192 3 57 42 102 31 97 1 129 4 67 30 101 524 05:00 PM 8 54 0 62 1 16 11 28 10 20 0 30 0 7 2 9 129 05:15 PM 7 39 0 46 2 17 15 34 6 15 0 21 1 17 2 20 121 05:30 PM 3 32 0 35 0 8 16 24 4 19 0 23 0 9 2 11 93 05:45 PM 8 35 1 44 1 15 9 25 4 14 0 18 0 6 3 9 96 Total 26 160 1 187 4 56 51 111 24 68 0 92 1 39 9 49 439 Grand Total 52 324 3 379 7 113 93 213 55 165 1 221 5 106 39 150 963 Apprch %13.7 85.5 0.8 3.3 53.1 43.7 24.9 74.7 0.5 3.3 70.7 26 Total %5.4 33.6 0.3 39.4 0.7 11.7 9.7 22.1 5.7 17.1 0.1 22.9 0.5 11 4 15.6 Passenger +51 319 3 373 7 110 87 204 50 162 1 213 5 104 38 147 937 % Passenger +98.1 98.5 100 98.4 100 97.3 93.5 95.8 90.9 98.2 100 96.4 100 98.1 97.4 98 97.3 Trucks 1 5 0 6 0 3 6 9 5 3 0 8 0 2 1 3 26 % Trucks 1.9 1.5 0 1.6 0 2.7 6.5 4.2 9.1 1.8 0 3.6 0 1.9 2.6 2 2.7 Heath & Associates 2214 Tacoma Rd E Puyallup, WA, 98371 PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 26 File Name : 4489c Site Code : 00004489 Start Date : 9/22/2020 Page No : 2 S Discovery Rd Southbound S Jacob Miller Rd Westbound S Discovery Rd Northbound S Jacob Miller Rd Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:00 PM 04:00 PM 8 48 2 58 1 26 12 39 5 27 1 33 4 22 11 37 167 04:15 PM 4 35 0 39 1 8 11 20 8 25 0 33 0 14 7 21 113 04:30 PM 6 37 0 43 0 15 11 26 11 29 0 40 0 16 5 21 130 04:45 PM 8 44 0 52 1 8 8 17 7 16 0 23 0 15 7 22 114 Total Volume 26 164 2 192 3 57 42 102 31 97 1 129 4 67 30 101 524 % App. Total 13.5 85.4 1 2.9 55.9 41.2 24 75.2 0.8 4 66.3 29.7 PHF .813 .854 .250 .828 .750 .548 .875 .654 .705 .836 .250 .806 .250 .761 .682 .682 .784 Passenger +26 160 2 188 3 56 38 97 28 95 1 124 4 65 29 98 507 % Passenger +100 97.6 100 97.9 100 98.2 90.5 95.1 90.3 97.9 100 96.1 100 97.0 96.7 97.0 96.8 Trucks 0 4 0 4 0 1 4 5 3 2 0 5 0 2 1 3 17 % Trucks 0 2.4 0 2.1 0 1.8 9.5 4.9 9.7 2.1 0 3.9 0 3.0 3.3 3.0 3.2 S Discovery Rd S Jacob Miller Rd S Jacob Miller Rd S Discovery Rd Right 26 0 26 Thru 160 4 164 Left 2 0 2 InOut Total 127 188 315 3 4 7 130 322 192 Right3 0 3 Thru56 1 57 Left38 4 42 OutTotalIn95 97 192 5 5 10 100 202 102 Left 1 0 1 Thru 95 2 97 Right 28 3 31 Out TotalIn 202 124 326 8 5 13 210 339 129 Left29 1 30 Thru65 2 67 Right4 0 4 TotalOutIn83 98 181 1 3 4 84 185 101 Peak Hour Begins at 04:00 PM Passenger + Trucks Peak Hour Data North Heath & Associates 2214 Tacoma Rd E Puyallup, WA, 98371 PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 27 File Name : 4489d Site Code : 00004489 Start Date : 9/22/2020 Page No : 1 Groups Printed- Passenger + - Trucks Highway 20 Southbound Highway 20 Northbound S Jacob Miller Rd Eastbound Start Time Right Thru App. Total Thru Left App. Total Right Left App. Total Int. Total 04:00 PM 2 204 206 127 38 165 29 1 30 401 04:15 PM 1 188 189 138 20 158 20 2 22 369 04:30 PM 1 179 180 128 25 153 26 2 28 361 04:45 PM 0 215 215 117 17 134 21 1 22 371 Total 4 786 790 510 100 610 96 6 102 1502 05:00 PM 1 248 249 126 31 157 16 1 17 423 05:15 PM 1 174 175 105 32 137 23 0 23 335 05:30 PM 4 145 149 130 19 149 12 0 12 310 05:45 PM 0 128 128 100 24 124 11 1 12 264 Total 6 695 701 461 106 567 62 2 64 1332 Grand Total 10 1481 1491 971 206 1177 158 8 166 2834 Apprch %0.7 99.3 82.5 17.5 95.2 4.8 Total %0.4 52.3 52.6 34.3 7.3 41.5 5.6 0.3 5.9 Passenger +10 1442 1452 952 197 1149 152 8 160 2761 % Passenger +100 97.4 97.4 98 95.6 97.6 96.2 100 96.4 97.4 Trucks 0 39 39 19 9 28 6 0 6 73 % Trucks 0 2.6 2.6 2 4.4 2.4 3.8 0 3.6 2.6 Heath & Associates 2214 Tacoma Rd E Puyallup, WA, 98371 PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 28 File Name : 4489d Site Code : 00004489 Start Date : 9/22/2020 Page No : 2 Highway 20 Southbound Highway 20 Northbound S Jacob Miller Rd Eastbound Start Time Right Thru App. Total Thru Left App. Total Right Left App. Total Int. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:15 PM 04:15 PM 1 188 189 138 20 158 20 2 22 369 04:30 PM 1 179 180 128 25 153 26 2 28 361 04:45 PM 0 215 215 117 17 134 21 1 22 371 05:00 PM 1 248 249 126 31 157 16 1 17 423 Total Volume 3 830 833 509 93 602 83 6 89 1524 % App. Total 0.4 99.6 84.6 15.4 93.3 6.7 PHF .750 .837 .836 .922 .750 .953 .798 .750 .795 .901 Passenger +3 815 818 496 88 584 79 6 85 1487 % Passenger +100 98.2 98.2 97.4 94.6 97.0 95.2 100 95.5 97.6 Trucks 0 15 15 13 5 18 4 0 4 37 % Trucks 0 1.8 1.8 2.6 5.4 3.0 4.8 0 4.5 2.4 Highway 20 S Jacob Miller Rd Highway 20 Right 3 0 3 Thru 815 15 830 InOut Total 502 818 1320 13 15 28 515 1348 833 Left 88 5 93 Thru 496 13 509 Out TotalIn 894 584 1478 19 18 37 913 1515 602 Left6 0 6 Right79 4 83 TotalOutIn91 85 176 5 4 9 96 185 89 Peak Hour Begins at 04:15 PM Passenger + Trucks Peak Hour Data North Heath & Associates 2214 Tacoma Rd E Puyallup, WA, 98371 PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 29 File Name : 4489e Site Code : 00004489 Start Date : 9/22/2020 Page No : 1 Groups Printed- Passenger + - Trucks S Discovery Rd Southbound Florence St Westbound S Discovery Rd Northbound Cape George Rd Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total 04:00 PM 30 27 5 62 2 0 0 2 0 18 0 18 1 0 10 11 93 04:15 PM 26 18 6 50 1 0 0 1 0 14 0 14 1 0 17 18 83 04:30 PM 22 19 1 42 2 0 0 2 0 11 0 11 2 0 25 27 82 04:45 PM 24 25 4 53 1 0 1 2 0 9 3 12 1 0 15 16 83 Total 102 89 16 207 6 0 1 7 0 52 3 55 5 0 67 72 341 05:00 PM 34 23 1 58 3 0 0 3 1 11 2 14 0 0 16 16 91 05:15 PM 34 15 4 53 1 0 0 1 1 3 1 5 3 0 16 19 78 05:30 PM 35 9 1 45 1 0 0 1 0 12 0 12 1 0 13 14 72 05:45 PM 19 16 4 39 3 0 0 3 0 6 2 8 1 0 9 10 60 Total 122 63 10 195 8 0 0 8 2 32 5 39 5 0 54 59 301 Grand Total 224 152 26 402 14 0 1 15 2 84 8 94 10 0 121 131 642 Apprch %55.7 37.8 6.5 93.3 0 6.7 2.1 89.4 8.5 7.6 0 92.4 Total %34.9 23.7 4 62.6 2.2 0 0.2 2.3 0.3 13.1 1.2 14.6 1.6 0 18.8 20.4 Passenger +217 151 24 392 12 0 1 13 2 81 8 91 10 0 118 128 624 % Passenger +96.9 99.3 92.3 97.5 85.7 0 100 86.7 100 96.4 100 96.8 100 0 97.5 97.7 97.2 Trucks 7 1 2 10 2 0 0 2 0 3 0 3 0 0 3 3 18 % Trucks 3.1 0.7 7.7 2.5 14.3 0 0 13.3 0 3.6 0 3.2 0 0 2.5 2.3 2.8 Heath & Associates 2214 Tacoma Rd E Puyallup, WA, 98371 PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 30 File Name : 4489e Site Code : 00004489 Start Date : 9/22/2020 Page No : 2 S Discovery Rd Southbound Florence St Westbound S Discovery Rd Northbound Cape George Rd Eastbound Start Time Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Right Thru Left App. Total Int. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:00 PM 04:00 PM 30 27 5 62 2 0 0 2 0 18 0 18 1 0 10 11 93 04:15 PM 26 18 6 50 1 0 0 1 0 14 0 14 1 0 17 18 83 04:30 PM 22 19 1 42 2 0 0 2 0 11 0 11 2 0 25 27 82 04:45 PM 24 25 4 53 1 0 1 2 0 9 3 12 1 0 15 16 83 Total Volume 102 89 16 207 6 0 1 7 0 52 3 55 5 0 67 72 341 % App. Total 49.3 43 7.7 85.7 0 14.3 0 94.5 5.5 6.9 0 93.1 PHF .850 .824 .667 .835 .750 .000 .250 .875 .000 .722 .250 .764 .625 .000 .670 .667 .917 Passenger +97 88 14 199 4 0 1 5 0 50 3 53 5 0 65 70 327 % Passenger +95.1 98.9 87.5 96.1 66.7 0 100 71.4 0 96.2 100 96.4 100 0 97.0 97.2 95.9 Trucks 5 1 2 8 2 0 0 2 0 2 0 2 0 0 2 2 14 % Trucks 4.9 1.1 12.5 3.9 33.3 0 0 28.6 0 3.8 0 3.6 0 0 3.0 2.8 4.1 S Discovery Rd Cape George Rd Florence St S Discovery Rd Right 97 5 102 Thru 88 1 89 Left 14 2 16 InOut Total 119 199 318 6 8 14 125 332 207 Right4 2 6 Thru0 0 0 Left1 0 1 OutTotalIn14 5 19 2 2 4 16 23 7 Left 3 0 3 Thru 50 2 52 Right 0 0 0 Out TotalIn 94 53 147 1 2 3 95 150 55 Left65 2 67 Thru0 0 0 Right5 0 5 TotalOutIn100 70 170 5 2 7 105 177 72 Peak Hour Begins at 04:00 PM Passenger + Trucks Peak Hour Data North Heath & Associates 2214 Tacoma Rd E Puyallup, WA, 98371 PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 31 Map - SR 20/Discovery/Mill 2019 PM Existing 2019 PM Volumes 2964555437 SR 20 3734156Discovery Road9310180PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 32 SR-20 & Discovery Road Intersection Volumes from the "SR 20 Discovery Road & SR 20/Kearney Street Roundabouts Intersection Control Evaluation" by Manuel Abarca PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 33 PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 34 PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 35 HCM 6th TWSC Existing PM Peak Hour 1: S Discovery Rd & Cape George Rd/Florence St 09/21/2021 HCM 6th TWSC Synchro 10 Light Report Page 1 Intersection Int Delay, s/veh 3 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 80 06107462019107122 Future Vol, veh/h 80 06107462019107122 Conflicting Peds, #/hr 0 00000000000 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - Yield - - None - - None - - None Storage Length - - 45 - - 25 ------ Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 3 1111331411315 Mvmt Flow 87 07108467021116133 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 304 300 183 300 366 67 249 0 0 67 0 0 Stage 1 225 225 - 75 75 ------- Stage 2 79 75 - 225 291 ------- Critical Hdwy 7.13 6.51 6.21 7.11 6.51 6.53 4.11 - - 4.23 - - Critical Hdwy Stg 1 6.13 5.51 - 6.11 5.51 ------- Critical Hdwy Stg 2 6.13 5.51 - 6.11 5.51 ------- Follow-up Hdwy 3.527 4.009 3.309 3.509 4.009 3.597 2.209 - - 2.317 - - Pot Cap-1 Maneuver 646 614 862 654 564 916 1323 - - 1467 - - Stage 1 775 719 - 937 834 ------- Stage 2 927 834 - 780 673 ------- Platoon blocked, % - - - - Mov Cap-1 Maneuver 631 602 862 639 553 916 1323 - - 1467 - - Mov Cap-2 Maneuver 631 602 - 639 553 ------- Stage 1 773 707 - 934 831 ------- Stage 2 917 831 - 761 662 ------- Approach EB WB NB SB HCM Control Delay, s 11.4 9.2 0.5 0.6 HCM LOS B A Minor Lane/Major Mvmt NBL NBT NBREBLn1EBLn2WBLn1WBLn2 SBL SBT SBR Capacity (veh/h)1323 - - 631 862 639 916 1467 - - HCM Lane V/C Ratio 0.003 - - 0.138 0.008 0.002 0.008 0.014 - - HCM Control Delay (s) 7.7 0 - 11.6 9.2 10.6 9 7.5 0 - HCM Lane LOS A A -BABAAA - HCM 95th %tile Q(veh) 0 - - 0.5 0000-- PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 36 HCM 6th TWSC Existing PM Peak Hour 2: S Discovery Rd & S Jacob Miller Rd 09/21/2021 HCM 6th TWSC Synchro 10 Light Report Page 2 Intersection Int Delay, s/veh 6.7 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 36 80 5 50 68 4 1 116 37 2 197 31 Future Vol, veh/h 36 80 5 50 68 4 1 116 37 2 197 31 Conflicting Peds, #/hr 0 00000000000 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length ------------ Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 78 78 78 78 78 78 78 78 78 78 78 78 Heavy Vehicles, % 3 3 1 10 211210121 Mvmt Flow 46 103 6 64 87 5 1 149 47 3 253 40 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 500 477 273 509 474 173 293 0 0 196 0 0 Stage 1 279 279 - 175 175 ------- Stage 2 221 198 - 334 299 ------- Critical Hdwy 7.13 6.53 6.21 7.2 6.52 6.21 4.11 - - 4.11 - - Critical Hdwy Stg 1 6.13 5.53 - 6.2 5.52 ------- Critical Hdwy Stg 2 6.13 5.53 - 6.2 5.52 ------- Follow-up Hdwy 3.527 4.027 3.309 3.59 4.018 3.309 2.209 - - 2.209 - - Pot Cap-1 Maneuver 480 486 768 462 489 873 1274 - - 1383 - - Stage 1 725 678 - 808 754 ------- Stage 2 779 735 - 663 666 ------- Platoon blocked, % - - - - Mov Cap-1 Maneuver 410 484 768 382 487 873 1274 - - 1383 - - Mov Cap-2 Maneuver 410 484 - 382 487 ------- Stage 1 724 676 - 807 753 ------- Stage 2 684 734 - 556 664 ------- Approach EB WB NB SB HCM Control Delay, s 16.5 17.5 0.1 0.1 HCM LOS C C Minor Lane/Major Mvmt NBL NBT NBREBLn1WBLn1 SBL SBT SBR Capacity (veh/h)1274 - - 466 443 1383 - - HCM Lane V/C Ratio 0.001 - - 0.333 0.353 0.002 - - HCM Control Delay (s) 7.8 0 - 16.5 17.5 7.6 0 - HCM Lane LOS A A - C C A A - HCM 95th %tile Q(veh) 0 - - 1.4 1.6 0 - - PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 37 HCM 6th TWSC Existing PM Peak Hour 3: Hwy 20 & S Jacob Miller Rd 09/21/2021 HCM 6th TWSC Synchro 10 Light Report Page 3 Intersection Int Delay, s/veh 2.7 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 7 100 112 611 996 4 Future Vol, veh/h 7 100 112 611 996 4 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - 175 - - - Veh in Median Storage, # 1 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 1 55321 Mvmt Flow 8 111 124 679 1107 4 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 2036 1109 1111 0 - 0 Stage 1 1109 ----- Stage 2 927 ----- Critical Hdwy 6.41 6.25 4.15 - - - Critical Hdwy Stg 1 5.41 ----- Critical Hdwy Stg 2 5.41 ----- Follow-up Hdwy 3.509 3.345 2.245 - - - Pot Cap-1 Maneuver 63 251 618 - - - Stage 1 317 ----- Stage 2 387 ----- Platoon blocked, % - - - Mov Cap-1 Maneuver 50 251 618 - - - Mov Cap-2 Maneuver 161 ----- Stage 1 253 ----- Stage 2 387 ----- Approach EB NB SB HCM Control Delay, s 33.4 1.9 0 HCM LOS D Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h)618 - 242 - - HCM Lane V/C Ratio 0.201 - 0.491 - - HCM Control Delay (s) 12.3 - 33.4 - - HCM Lane LOS B - D - - HCM 95th %tile Q(veh) 0.7 - 2.5 - - PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 38 HCM 6th TWSC Existing PM Peak Hour 4: S Discovery Rd/Discovery Rd & Driveway/Discovery Rd (Mill Rd)09/21/2021 HCM 6th TWSC Synchro 10 Light Report Page 4 Intersection Int Delay, s/veh 13.5 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 0 0 0 116 0 60 0 64 92 137 102 0 Future Vol, veh/h 0 0 0 116 0 60 0 64 92 137 102 0 Conflicting Peds, #/hr 0 00000000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length ------------ Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 89 89 89 89 89 89 89 89 89 89 89 89 Heavy Vehicles, % 1 11111121421 Mvmt Flow 0 0 0 130 0 67 0 72 103 154 115 0 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 67 00100352328138329534 Stage 1 ------11-294294- Stage 2 ------351327-891- Critical Hdwy 4.11 - - 4.11 - - 7.11 6.52 6.21 7.14 6.52 6.21 Critical Hdwy Stg 1 ------6.11 5.52 - 6.14 5.52 - Critical Hdwy Stg 2 ------6.11 5.52 - 6.14 5.52 - Follow-up Hdwy 2.209 - - 2.209 - - 3.509 4.018 3.309 3.536 4.018 3.309 Pot Cap-1 Maneuver 1541 - - 1628 - - 605 591 1087 572 616 1042 Stage 1 ------1025 895 - 710 670 - Stage 2 ------668648-914895- Platoon blocked, % - - - - Mov Cap-1 Maneuver 1541 - - 1628 - - 479 541 1087 436 564 1042 Mov Cap-2 Maneuver ------479541-436564- Stage 1 ------1025 895 - 710 614 - Stage 2 ------498594-761895- Approach EB WB NB SB HCM Control Delay, s 0 4.9 11.1 21.4 HCM LOS B C Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1 Capacity (veh/h)769 1541 - - 1628 - - 483 HCM Lane V/C Ratio 0.228 - - - 0.08 - - 0.556 HCM Control Delay (s) 11.1 0 - - 7.4 0 - 21.4 HCM Lane LOS B A - - A A - C HCM 95th %tile Q(veh) 0.9 0 - - 0.3 - - 3.3 PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 39 HCM 6th Signalized Intersection Summary Existing PM Peak Hour 5: Hwy 20 & Discovery Rd (Mill Rd)/Mill Rd 09/21/2021 HCM 6th Signalized Intersection Summary Synchro 10 Light Report Page 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 71 8 132 48 8 1 55 535 23 1 823 127 Future Volume (veh/h) 71 8 132 48 8 1 55 535 23 1 823 127 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1885 1885 1885 1885 1885 1885 1870 1856 1856 418 1885 1885 Adj Flow Rate, veh/h 78 9 145 53 9 1 60 588 25 1 904 140 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Percent Heavy Veh, %11111123310011 Cap, veh/h 140 26 175 234 34 3 82 1123 48 1 941 146 Arrive On Green 0.17 0.17 0.17 0.17 0.17 0.17 0.05 0.64 0.64 0.00 0.59 0.59 Sat Flow, veh/h 453 150 1006 867 198 17 1781 1767 75 398 1594 247 Grp Volume(v), veh/h 232 0 0 63 0 0 60 0 613 1 0 1044 Grp Sat Flow(s),veh/h/ln 1609 0 0 1082 0 0 1781 0 1842 398 0 1841 Q Serve(g_s), s 6.8 0.0 0.0 0.0 0.0 0.0 2.6 0.0 14.4 0.1 0.0 42.5 Cycle Q Clear(g_c), s 10.9 0.0 0.0 4.1 0.0 0.0 2.6 0.0 14.4 0.1 0.0 42.5 Prop In Lane 0.34 0.62 0.84 0.02 1.00 0.04 1.00 0.13 Lane Grp Cap(c), veh/h 340 0 0 272 0 0 82 0 1171 1 0 1087 V/C Ratio(X) 0.68 0.00 0.00 0.23 0.00 0.00 0.73 0.00 0.52 1.83 0.00 0.96 Avail Cap(c_a), veh/h 500 0 0 408 0 0 112 0 1171 25 0 1115 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 0.00 0.00 1.00 0.00 0.00 1.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 31.4 0.0 0.0 28.6 0.0 0.0 37.3 0.0 7.9 39.6 0.0 15.3 Incr Delay (d2), s/veh 2.4 0.0 0.0 0.4 0.0 0.0 14.1 0.0 0.4 973.6 0.0 18.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 4.4 0.0 0.0 1.1 0.0 0.0 1.4 0.0 4.4 0.2 0.0 19.1 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 33.8 0.0 0.0 29.0 0.0 0.0 51.4 0.0 8.3 1013.2 0.0 33.3 LnGrp LOS C A A C A A D A A F A C Approach Vol, veh/h 232 63 673 1045 Approach Delay, s/veh 33.8 29.0 12.2 34.3 Approach LOS C C B C Timer - Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 5.1 55.4 18.8 8.7 51.8 18.8 Change Period (Y+Rc), s 5.0 5.0 5.0 5.0 5.0 5.0 Max Green Setting (Gmax), s 5.0 48.0 22.0 5.0 48.0 22.0 Max Q Clear Time (g_c+I1), s 2.1 16.4 12.9 4.6 44.5 6.1 Green Ext Time (p_c), s 0.0 4.2 0.9 0.0 2.3 0.2 Intersection Summary HCM 6th Ctrl Delay 26.7 HCM 6th LOS C Notes User approved pedestrian interval to be less than phase max green. PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 40 HCM 6th TWSC Forecast 2026 PM Peak Hour Without Project 1: S Discovery Rd & Cape George Rd/Florence St 09/21/2021 HCM 6th TWSC Synchro 10 Light Report Page 1 Intersection Int Delay, s/veh 3 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 84 06107465020112128 Future Vol, veh/h 84 06107465020112128 Conflicting Peds, #/hr 0 00000000000 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - Yield - - None - - None - - None Storage Length - - 45 - - 25 ------ Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 3 1111331411315 Mvmt Flow 91 07108471022122139 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 319 315 192 315 384 71 261 0 0 71 0 0 Stage 1 236 236 - 79 79 ------- Stage 2 83 79 - 236 305 ------- Critical Hdwy 7.13 6.51 6.21 7.11 6.51 6.53 4.11 - - 4.23 - - Critical Hdwy Stg 1 6.13 5.51 - 6.11 5.51 ------- Critical Hdwy Stg 2 6.13 5.51 - 6.11 5.51 ------- Follow-up Hdwy 3.527 4.009 3.309 3.509 4.009 3.597 2.209 - - 2.317 - - Pot Cap-1 Maneuver 632 602 852 640 551 911 1309 - - 1462 - - Stage 1 765 712 - 932 831 ------- Stage 2 923 831 - 769 664 ------- Platoon blocked, % - - - - Mov Cap-1 Maneuver 617 589 852 625 539 911 1309 - - 1462 - - Mov Cap-2 Maneuver 617 589 - 625 539 ------- Stage 1 763 699 - 929 829 ------- Stage 2 913 829 - 749 652 ------- Approach EB WB NB SB HCM Control Delay, s 11.6 9.2 0.4 0.6 HCM LOS B A Minor Lane/Major Mvmt NBL NBT NBREBLn1EBLn2WBLn1WBLn2 SBL SBT SBR Capacity (veh/h)1309 - - 617 852 625 911 1462 - - HCM Lane V/C Ratio 0.003 - - 0.148 0.008 0.002 0.008 0.015 - - HCM Control Delay (s) 7.8 0 - 11.8 9.3 10.8 9 7.5 0 - HCM Lane LOS A A -BABAAA - HCM 95th %tile Q(veh) 0 - - 0.5 0000-- PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 41 HCM 6th TWSC Forecast 2026 PM Peak Hour Without Project 2: S Discovery Rd & S Jacob Miller Rd 09/21/2021 HCM 6th TWSC Synchro 10 Light Report Page 2 Intersection Int Delay, s/veh 7 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 38 84 5 53 71 4 1 122 39 2 207 33 Future Vol, veh/h 38 84 5 53 71 4 1 122 39 2 207 33 Conflicting Peds, #/hr 0 00000000000 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length ------------ Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 78 78 78 78 78 78 78 78 78 78 78 78 Heavy Vehicles, % 3 3 1 10 211210121 Mvmt Flow 49 108 6 68 91 5 1 156 50 3 265 42 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 523 500 286 532 496 181 307 0 0 206 0 0 Stage 1 292 292 - 183 183 ------- Stage 2 231 208 - 349 313 ------- Critical Hdwy 7.13 6.53 6.21 7.2 6.52 6.21 4.11 - - 4.11 - - Critical Hdwy Stg 1 6.13 5.53 - 6.2 5.52 ------- Critical Hdwy Stg 2 6.13 5.53 - 6.2 5.52 ------- Follow-up Hdwy 3.527 4.027 3.309 3.59 4.018 3.309 2.209 - - 2.209 - - Pot Cap-1 Maneuver 463 471 755 446 475 864 1259 - - 1371 - - Stage 1 714 669 - 800 748 ------- Stage 2 770 728 - 651 657 ------- Platoon blocked, % - - - - Mov Cap-1 Maneuver 391 469 755 363 473 864 1259 - - 1371 - - Mov Cap-2 Maneuver 391 469 - 363 473 ------- Stage 1 713 667 - 799 747 ------- Stage 2 671 727 - 540 655 ------- Approach EB WB NB SB HCM Control Delay, s 17.5 18.6 0 0.1 HCM LOS C C Minor Lane/Major Mvmt NBL NBT NBREBLn1WBLn1 SBL SBT SBR Capacity (veh/h)1259 - - 449 426 1371 - - HCM Lane V/C Ratio 0.001 - - 0.363 0.385 0.002 - - HCM Control Delay (s) 7.9 0 - 17.5 18.6 7.6 0 - HCM Lane LOS A A - C C A A - HCM 95th %tile Q(veh) 0 - - 1.6 1.8 0 - - PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 42 HCM 6th TWSC Forecast 2026 PM Peak Hour Without Project 3: Hwy 20 & S Jacob Miller Rd 09/21/2021 HCM 6th TWSC Synchro 10 Light Report Page 3 Intersection Int Delay, s/veh 3.1 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 7 105 118 642 1047 4 Future Vol, veh/h 7 105 118 642 1047 4 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - 175 - - - Veh in Median Storage, # 1 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 1 55321 Mvmt Flow 8 117 131 713 1163 4 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 2140 1165 1167 0 - 0 Stage 1 1165 ----- Stage 2 975 ----- Critical Hdwy 6.41 6.25 4.15 - - - Critical Hdwy Stg 1 5.41 ----- Critical Hdwy Stg 2 5.41 ----- Follow-up Hdwy 3.509 3.345 2.245 - - - Pot Cap-1 Maneuver 54 233 588 - - - Stage 1 298 ----- Stage 2 367 ----- Platoon blocked, % - - - Mov Cap-1 Maneuver 42 233 588 - - - Mov Cap-2 Maneuver 148 ----- Stage 1 232 ----- Stage 2 367 ----- Approach EB NB SB HCM Control Delay, s 39.2 2 0 HCM LOS E Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h)588 - 225 - - HCM Lane V/C Ratio 0.223 - 0.553 - - HCM Control Delay (s) 12.9 - 39.2 - - HCM Lane LOS B - E - - HCM 95th %tile Q(veh) 0.8 - 3 - - PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 43 HCM 6th TWSC Forecast 2026 PM Peak Hour Without Project 4: S Discovery Rd/Discovery Rd & Driveway/Discovery Rd (Mill Rd)09/21/2021 HCM 6th TWSC Synchro 10 Light Report Page 4 Intersection Int Delay, s/veh 14.7 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 0 0 0 122 0 63 0 67 97 144 107 0 Future Vol, veh/h 0 0 0 122 0 63 0 67 97 144 107 0 Conflicting Peds, #/hr 0 00000000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length ------------ Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 89 89 89 89 89 89 89 89 89 89 89 89 Heavy Vehicles, % 1 11111121421 Mvmt Flow 0 0 0 137 0 71 0 75 109 162 120 0 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 71 00100371346140331136 Stage 1 ------11-310310- Stage 2 ------370345-931- Critical Hdwy 4.11 - - 4.11 - - 7.11 6.52 6.21 7.14 6.52 6.21 Critical Hdwy Stg 1 ------6.11 5.52 - 6.14 5.52 - Critical Hdwy Stg 2 ------6.11 5.52 - 6.14 5.52 - Follow-up Hdwy 2.209 - - 2.209 - - 3.509 4.018 3.309 3.536 4.018 3.309 Pot Cap-1 Maneuver 1536 - - 1628 - - 588 577 1087 554 604 1039 Stage 1 ------1025 895 - 696 659 - Stage 2 ------652636-909895- Platoon blocked, % - - - - Mov Cap-1 Maneuver 1536 - - 1628 - - 457 526 1087 414 551 1039 Mov Cap-2 Maneuver ------457526-414551- Stage 1 ------1025 895 - 696 601 - Stage 2 ------476580-749895- Approach EB WB NB SB HCM Control Delay, s 0 4.9 11.3 24.2 HCM LOS B C Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1 Capacity (veh/h)757 1536 - - 1628 - - 463 HCM Lane V/C Ratio 0.243 - - - 0.084 - - 0.609 HCM Control Delay (s) 11.3 0 - - 7.4 0 - 24.2 HCM Lane LOS B A - - A A - C HCM 95th %tile Q(veh) 1 0 - - 0.3 - - 4 PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 44 HCM 6th Signalized Intersection Summary Forecast 2026 PM Peak Hour Without Project 5: Hwy 20 & Discovery Rd (Mill Rd)/Mill Rd 09/21/2021 HCM 6th Signalized Intersection Summary Synchro 10 Light Report Page 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 75 8 139 50 8 1 58 562 24 1 865 133 Future Volume (veh/h) 75 8 139 50 8 1 58 562 24 1 865 133 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1885 1885 1885 1885 1885 1885 1870 1856 1856 418 1885 1885 Adj Flow Rate, veh/h 82 9 153 55 9 1 64 618 26 1 951 146 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Percent Heavy Veh, %11111123310011 Cap, veh/h 137 24 176 219 31 3 82 1150 48 1 967 148 Arrive On Green 0.17 0.17 0.17 0.17 0.17 0.17 0.05 0.65 0.65 0.00 0.61 0.61 Sat Flow, veh/h 468 137 1017 818 179 16 1781 1768 74 398 1596 245 Grp Volume(v), veh/h 244 0 0 65 0 0 64 0 644 1 0 1097 Grp Sat Flow(s),veh/h/ln 1623 0 0 1013 0 0 1781 0 1842 398 0 1841 Q Serve(g_s), s 7.5 0.0 0.0 0.0 0.0 0.0 3.0 0.0 16.1 0.1 0.0 49.9 Cycle Q Clear(g_c), s 12.4 0.0 0.0 4.9 0.0 0.0 3.0 0.0 16.1 0.1 0.0 49.9 Prop In Lane 0.34 0.63 0.85 0.02 1.00 0.04 1.00 0.13 Lane Grp Cap(c), veh/h 337 0 0 253 0 0 82 0 1198 1 0 1115 V/C Ratio(X) 0.72 0.00 0.00 0.26 0.00 0.00 0.78 0.00 0.54 1.83 0.00 0.98 Avail Cap(c_a), veh/h 394 0 0 301 0 0 104 0 1198 23 0 1116 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 0.00 0.00 1.00 0.00 0.00 1.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 34.2 0.0 0.0 31.2 0.0 0.0 40.5 0.0 8.1 42.8 0.0 16.5 Incr Delay (d2), s/veh 5.4 0.0 0.0 0.5 0.0 0.0 24.8 0.0 0.5 974.8 0.0 22.9 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 5.4 0.0 0.0 1.2 0.0 0.0 1.9 0.0 5.1 0.2 0.0 23.6 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 39.7 0.0 0.0 31.7 0.0 0.0 65.3 0.0 8.5 1017.6 0.0 39.4 LnGrp LOS D A A C AAEAAFAD Approach Vol, veh/h 244 65 708 1098 Approach Delay, s/veh 39.7 31.7 13.7 40.3 Approach LOS D C B D Timer - Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 5.1 60.8 19.9 9.0 57.0 19.9 Change Period (Y+Rc), s 5.0 5.0 5.0 5.0 5.0 5.0 Max Green Setting (Gmax), s 5.0 52.0 18.0 5.0 52.0 18.0 Max Q Clear Time (g_c+I1), s 2.1 18.1 14.4 5.0 51.9 6.9 Green Ext Time (p_c), s 0.0 4.6 0.5 0.0 0.1 0.2 Intersection Summary HCM 6th Ctrl Delay 31.1 HCM 6th LOS C Notes User approved pedestrian interval to be less than phase max green. PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 45 HCM 6th TWSC Forecast 2026 PM Peak Hour With Project 1: S Discovery Rd & Cape George Rd/Florence St 09/21/2021 HCM 6th TWSC Synchro 10 Light Report Page 1 Intersection Int Delay, s/veh 3.3 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 101 07107571020123157 Future Vol, veh/h 101 07107571020123157 Conflicting Peds, #/hr 0 00000000000 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - Yield - - None - - None - - None Storage Length - - 45 - - 25 ------ Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92 Heavy Vehicles, % 3 1111331411315 Mvmt Flow 110 08108577022134171 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 355 351 220 351 436 77 305 0 0 77 0 0 Stage 1 264 264 - 87 87 ------- Stage 2 91 87 - 264 349 ------- Critical Hdwy 7.13 6.51 6.21 7.11 6.51 6.53 4.11 - - 4.23 - - Critical Hdwy Stg 1 6.13 5.51 - 6.11 5.51 ------- Critical Hdwy Stg 2 6.13 5.51 - 6.11 5.51 ------- Follow-up Hdwy 3.527 4.009 3.309 3.509 4.009 3.597 2.209 - - 2.317 - - Pot Cap-1 Maneuver 598 575 822 606 515 904 1262 - - 1455 - - Stage 1 739 692 - 923 825 ------- Stage 2 914 825 - 743 635 ------- Platoon blocked, % - - - - Mov Cap-1 Maneuver 582 562 822 590 503 904 1262 - - 1455 - - Mov Cap-2 Maneuver 582 562 - 590 503 ------- Stage 1 736 679 - 919 822 ------- Stage 2 903 822 - 722 623 ------- Approach EB WB NB SB HCM Control Delay, s 12.4 9.3 0.5 0.5 HCM LOS B A Minor Lane/Major Mvmt NBL NBT NBREBLn1EBLn2WBLn1WBLn2 SBL SBT SBR Capacity (veh/h)1262 - - 582 822 590 904 1455 - - HCM Lane V/C Ratio 0.004 - - 0.189 0.009 0.002 0.008 0.015 - - HCM Control Delay (s) 7.9 0 - 12.6 9.4 11.1 9 7.5 0 - HCM Lane LOS A A -BABAAA - HCM 95th %tile Q(veh) 0 - - 0.7 0000-- PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 46 HCM 6th TWSC Forecast 2026 PM Peak Hour With Project 2: S Discovery Rd & S Jacob Miller Rd 09/21/2021 HCM 6th TWSC Synchro 10 Light Report Page 2 Intersection Int Delay, s/veh 8.5 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 38 84 5 81 71 4 1 130 54 2 219 33 Future Vol, veh/h 38 84 5 81 71 4 1 130 54 2 219 33 Conflicting Peds, #/hr 0 00000000000 Sign Control Stop Stop Stop Stop Stop Stop Free Free Free Free Free Free RT Channelized - - None - - None - - None - - None Storage Length ------------ Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 78 78 78 78 78 78 78 78 78 78 78 78 Heavy Vehicles, % 3 3 1 10 211210121 Mvmt Flow 49 108 6 104 91 5 1 167 69 3 281 42 Major/Minor Minor2 Minor1 Major1 Major2 Conflicting Flow All 560 546 302 569 533 202 323 0 0 236 0 0 Stage 1 308 308 - 204 204 ------- Stage 2 252 238 - 365 329 ------- Critical Hdwy 7.13 6.53 6.21 7.2 6.52 6.21 4.11 - - 4.11 - - Critical Hdwy Stg 1 6.13 5.53 - 6.2 5.52 ------- Critical Hdwy Stg 2 6.13 5.53 - 6.2 5.52 ------- Follow-up Hdwy 3.527 4.027 3.309 3.59 4.018 3.309 2.209 - - 2.209 - - Pot Cap-1 Maneuver 437 444 740 421 453 841 1242 - - 1337 - - Stage 1 700 658 - 780 733 ------- Stage 2 750 706 - 638 646 ------- Platoon blocked, % - - - - Mov Cap-1 Maneuver 366 442 740 338 451 841 1242 - - 1337 - - Mov Cap-2 Maneuver 366 442 - 338 451 ------- Stage 1 699 656 - 779 732 ------- Stage 2 652 705 - 527 644 ------- Approach EB WB NB SB HCM Control Delay, s 18.8 23.7 0 0.1 HCM LOS C C Minor Lane/Major Mvmt NBL NBT NBREBLn1WBLn1 SBL SBT SBR Capacity (veh/h)1242 - - 422 388 1337 - - HCM Lane V/C Ratio 0.001 - - 0.386 0.515 0.002 - - HCM Control Delay (s) 7.9 0 - 18.8 23.7 7.7 0 - HCM Lane LOS A A - C C A A - HCM 95th %tile Q(veh) 0 - - 1.8 2.8 0 - - PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 47 HCM 6th TWSC Forecast 2026 PM Peak Hour With Project 3: Hwy 20 & S Jacob Miller Rd 09/21/2021 HCM 6th TWSC Synchro 10 Light Report Page 3 Intersection Int Delay, s/veh 4.1 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 14 113 131 642 1047 19 Future Vol, veh/h 14 113 131 642 1047 19 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - 175 - - - Veh in Median Storage, # 1 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 1 55321 Mvmt Flow 16 126 146 713 1163 21 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 2179 1174 1184 0 - 0 Stage 1 1174 ----- Stage 2 1005 ----- Critical Hdwy 6.41 6.25 4.15 - - - Critical Hdwy Stg 1 5.41 ----- Critical Hdwy Stg 2 5.41 ----- Follow-up Hdwy 3.509 3.345 2.245 - - - Pot Cap-1 Maneuver 51 230 579 - - - Stage 1 295 ----- Stage 2 355 ----- Platoon blocked, % - - - Mov Cap-1 Maneuver 38 230 579 - - - Mov Cap-2 Maneuver 141 ----- Stage 1 221 ----- Stage 2 355 ----- Approach EB NB SB HCM Control Delay, s 48.9 2.3 0 HCM LOS E Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h)579 - 215 - - HCM Lane V/C Ratio 0.251 - 0.656 - - HCM Control Delay (s) 13.3 - 48.9 - - HCM Lane LOS B - E - - HCM 95th %tile Q(veh) 1 - 4 - - PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 48 HCM 6th TWSC Forecast 2026 PM Peak Hour With Project 4: S Discovery Rd/Discovery Rd & Driveway/Discovery Rd (Mill Rd)09/21/2021 HCM 6th TWSC Synchro 10 Light Report Page 4 Intersection Int Delay, s/veh 15.7 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 0 0 0 130 0 63 0 70 102 144 111 0 Future Vol, veh/h 0 0 0 130 0 63 0 70 102 144 111 0 Conflicting Peds, #/hr 0 00000000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length ------------ Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 89 89 89 89 89 89 89 89 89 89 89 89 Heavy Vehicles, % 1 11111121421 Mvmt Flow 0 0 0 146 0 71 0 79 115 162 125 0 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 71 00100391364142632936 Stage 1 ------11-328328- Stage 2 ------390363-981- Critical Hdwy 4.11 - - 4.11 - - 7.11 6.52 6.21 7.14 6.52 6.21 Critical Hdwy Stg 1 ------6.11 5.52 - 6.14 5.52 - Critical Hdwy Stg 2 ------6.11 5.52 - 6.14 5.52 - Follow-up Hdwy 2.209 - - 2.209 - - 3.509 4.018 3.309 3.536 4.018 3.309 Pot Cap-1 Maneuver 1536 - - 1628 - - 570 564 1087 535 590 1039 Stage 1 ------1025 895 - 681 647 - Stage 2 ------636625-904895- Platoon blocked, % - - - - Mov Cap-1 Maneuver 1536 - - 1628 - - 435 511 1087 393 535 1039 Mov Cap-2 Maneuver ------435511-393535- Stage 1 ------1025 895 - 681 586 - Stage 2 ------454566-738895- Approach EB WB NB SB HCM Control Delay, s 0 5 11.5 26.7 HCM LOS B D Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBRSBLn1 Capacity (veh/h)745 1536 - - 1628 - - 444 HCM Lane V/C Ratio 0.259 - - - 0.09 - - 0.645 HCM Control Delay (s) 11.5 0 - - 7.4 0 - 26.7 HCM Lane LOS B A - - A A - D HCM 95th %tile Q(veh) 1 0 - - 0.3 - - 4.5 PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 49 HCM 6th Signalized Intersection Summary Forecast 2026 PM Peak Hour With Project 5: Hwy 20 & Discovery Rd (Mill Rd)/Mill Rd 09/21/2021 HCM 6th Signalized Intersection Summary Synchro 10 Light Report Page 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 80 9 139 50 8 1 58 567 24 1 880 141 Future Volume (veh/h) 80 9 139 50 8 1 58 567 24 1 880 141 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1885 1885 1885 1885 1885 1885 1870 1856 1856 418 1885 1885 Adj Flow Rate, veh/h 88 10 153 55 9 1 64 623 26 1 967 155 Peak Hour Factor 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 0.91 Percent Heavy Veh, %11111123310011 Cap, veh/h 144 24 175 222 32 3 82 1145 48 1 956 153 Arrive On Green 0.18 0.18 0.18 0.18 0.18 0.18 0.05 0.65 0.65 0.00 0.60 0.60 Sat Flow, veh/h 496 137 988 818 178 16 1781 1768 74 398 1585 254 Grp Volume(v), veh/h 251 0 0 65 0 0 64 0 649 1 0 1122 Grp Sat Flow(s),veh/h/ln 1621 0 0 1011 0 0 1781 0 1842 398 0 1839 Q Serve(g_s), s 7.9 0.0 0.0 0.0 0.0 0.0 3.1 0.0 16.5 0.1 0.0 52.0 Cycle Q Clear(g_c), s 12.9 0.0 0.0 4.9 0.0 0.0 3.1 0.0 16.5 0.1 0.0 52.0 Prop In Lane 0.35 0.61 0.85 0.02 1.00 0.04 1.00 0.14 Lane Grp Cap(c), veh/h 344 0 0 256 0 0 82 0 1193 1 0 1109 V/C Ratio(X) 0.73 0.00 0.00 0.25 0.00 0.00 0.78 0.00 0.54 1.83 0.00 1.01 Avail Cap(c_a), veh/h 392 0 0 297 0 0 103 0 1193 23 0 1109 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I)1.00 0.00 0.00 1.00 0.00 0.00 1.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 34.3 0.0 0.0 31.1 0.0 0.0 40.7 0.0 8.3 43.1 0.0 17.1 Incr Delay (d2), s/veh 5.9 0.0 0.0 0.5 0.0 0.0 25.1 0.0 0.5 974.9 0.0 30.0 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 5.6 0.0 0.0 1.2 0.0 0.0 1.9 0.0 5.3 0.2 0.0 26.5 Unsig. Movement Delay, s/veh LnGrp Delay(d),s/veh 40.2 0.0 0.0 31.6 0.0 0.0 65.8 0.0 8.8 1017.9 0.0 47.1 LnGrp LOS D A A C AAEAAFAF Approach Vol, veh/h 251 65 713 1123 Approach Delay, s/veh 40.2 31.6 13.9 48.0 Approach LOS D C B D Timer - Assigned Phs 1 2 4 5 6 8 Phs Duration (G+Y+Rc), s 5.1 60.9 20.3 9.0 57.0 20.3 Change Period (Y+Rc), s 5.0 5.0 5.0 5.0 5.0 5.0 Max Green Setting (Gmax), s 5.0 52.0 18.0 5.0 52.0 18.0 Max Q Clear Time (g_c+I1), s 2.1 18.5 14.9 5.1 54.0 6.9 Green Ext Time (p_c), s 0.0 4.6 0.4 0.0 0.0 0.2 Intersection Summary HCM 6th Ctrl Delay 35.3 HCM 6th LOS D PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 50 HCM 6th TWSC Forecast 2026 PM Peak Hour With Project 6: Cape George Rd & NW Access 09/21/2021 HCM 6th TWSC Synchro 10 Light Report Page 5 Intersection Int Delay, s/veh 0.2 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 1 91 132 3 2 1 Future Vol, veh/h 1 91 132 3 2 1 Conflicting Peds, #/hr 0 00000 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 35222 Mvmt Flow 1 99 143 3 2 1 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 146 0 - 0 246 145 Stage 1 - - - - 145 - Stage 2 - - - - 101 - Critical Hdwy 4.12 - - - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy 2.218 - - - 3.518 3.318 Pot Cap-1 Maneuver 1436 - - - 742 902 Stage 1 - - - - 882 - Stage 2 - - - - 923 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1436 - - - 741 902 Mov Cap-2 Maneuver - - - - 741 - Stage 1 - - - - 881 - Stage 2 - - - - 923 - Approach EB WB SB HCM Control Delay, s 0.1 0 9.6 HCM LOS A Minor Lane/Major Mvmt EBL EBT WBT WBRSBLn1 Capacity (veh/h)1436 - - - 788 HCM Lane V/C Ratio 0.001 - - - 0.004 HCM Control Delay (s) 7.5 0 - - 9.6 HCM Lane LOS A A - - A HCM 95th %tile Q(veh) 0 - - - 0 PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 51 HCM 6th TWSC Forecast 2026 PM Peak Hour With Project 7: SW Access & Cape George Rd 09/21/2021 HCM 6th TWSC Synchro 10 Light Report Page 6 Intersection Int Delay, s/veh 0.2 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 93 0 3 135 0 2 Future Vol, veh/h 93 0 3 135 0 2 Conflicting Peds, #/hr 0 00000 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 22222 Mvmt Flow 101 0 3 147 0 2 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 101 0 254 101 Stage 1 - - - - 101 - Stage 2 - - - - 153 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 1491 - 735 954 Stage 1 - - - - 923 - Stage 2 - - - - 875 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 1491 - 734 954 Mov Cap-2 Maneuver - - - - 734 - Stage 1 - - - - 923 - Stage 2 - - - - 873 - Approach EB WB NB HCM Control Delay, s 0 0.2 8.8 HCM LOS A Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h)954 - - 1491 - HCM Lane V/C Ratio 0.002 - - 0.002 - HCM Control Delay (s) 8.8 - - 7.4 0 HCM Lane LOS A - - A A HCM 95th %tile Q(veh) 0 - - 0 - PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 52 HCM 6th TWSC Forecast 2026 PM Peak Hour With Project 8: Cape George Rd & NE Access 09/21/2021 HCM 6th TWSC Synchro 10 Light Report Page 7 Intersection Int Delay, s/veh 0.5 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 1 94 138 21 13 0 Future Vol, veh/h 1 94 138 21 13 0 Conflicting Peds, #/hr 0 00000 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 35222 Mvmt Flow 1 102 150 23 14 0 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 173 0 - 0 266 162 Stage 1 - - - - 162 - Stage 2 - - - - 104 - Critical Hdwy 4.12 - - - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy 2.218 - - - 3.518 3.318 Pot Cap-1 Maneuver 1404 - - - 723 883 Stage 1 - - - - 867 - Stage 2 - - - - 920 - Platoon blocked, % - - - Mov Cap-1 Maneuver 1404 - - - 722 883 Mov Cap-2 Maneuver - - - - 722 - Stage 1 - - - - 866 - Stage 2 - - - - 920 - Approach EB WB SB HCM Control Delay, s 0.1 0 10.1 HCM LOS B Minor Lane/Major Mvmt EBL EBT WBT WBRSBLn1 Capacity (veh/h)1404 - - - 722 HCM Lane V/C Ratio 0.001 - - - 0.02 HCM Control Delay (s) 7.6 0 - - 10.1 HCM Lane LOS A A - - B HCM 95th %tile Q(veh) 0 - - - 0.1 PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 53 HCM 6th TWSC Forecast 2026 PM Peak Hour With Project 9: SE Access & Cape George Rd 09/21/2021 HCM 6th TWSC Synchro 10 Light Report Page 8 Intersection Int Delay, s/veh 0.1 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 107 0 3 159 0 1 Future Vol, veh/h 107 0 3 159 0 1 Conflicting Peds, #/hr 0 00000 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 22222 Mvmt Flow 116 0 3 173 0 1 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 116 0 295 116 Stage 1 - - - - 116 - Stage 2 - - - - 179 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 1473 - 696 936 Stage 1 - - - - 909 - Stage 2 - - - - 852 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 1473 - 695 936 Mov Cap-2 Maneuver - - - - 695 - Stage 1 - - - - 909 - Stage 2 - - - - 850 - Approach EB WB NB HCM Control Delay, s 0 0.1 8.9 HCM LOS A Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h)936 - - 1473 - HCM Lane V/C Ratio 0.001 - - 0.002 - HCM Control Delay (s) 8.9 - - 7.4 0 HCM Lane LOS A - - A A HCM 95th %tile Q(veh) 0 - - 0 - PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 54 HCM 6th TWSC Forecast 2026 PM Peak Hour With Project 10: S Discovery Rd & Access 09/21/2021 HCM 6th TWSC Synchro 10 Light Report Page 9 Intersection Int Delay, s/veh 0.4 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 6 1 1 70 120 11 Future Vol, veh/h 6 1 1 70 120 11 Conflicting Peds, #/hr 0 00000 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 ----- Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 22422 Mvmt Flow 7 1 1 76 130 12 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 214 136 142 0 - 0 Stage 1 136 ----- Stage 2 78 ----- Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 ----- Critical Hdwy Stg 2 5.42 ----- Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 774 913 1441 - - - Stage 1 890 ----- Stage 2 945 ----- Platoon blocked, % - - - Mov Cap-1 Maneuver 773 913 1441 - - - Mov Cap-2 Maneuver 773 ----- Stage 1 889 ----- Stage 2 945 ----- Approach EB NB SB HCM Control Delay, s 9.6 0.1 0 HCM LOS A Minor Lane/Major Mvmt NBL NBTEBLn1 SBT SBR Capacity (veh/h)1441 - 790 - - HCM Lane V/C Ratio 0.001 - 0.01 - - HCM Control Delay (s) 7.5 0 9.6 - - HCM Lane LOS A A A - - HCM 95th %tile Q(veh) 0 - 0 - - PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 55 Exhibit 1310-7a Left-Turn Storage Guidelines: Two-Lane, Unsignalized 40 m p h * * 50 mph * * 60 mph** % Total DHV Turning Left (single turning movement)Total DHV*1,000 900 800 700 600 500 400 300 0 5 10 15 20 25 Below curve, storage not needed for capacity. Above curve, further analysis recommended. KEY: 1 2 1 2 1 2 1 21,100 * DHV is total volume from both directions **Speeds are posted speeds PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 56 Forecast 2026 PM Peak Hour A. Cape George Rd & Northwestern Access Total DHV: 227 vph Left Turn %: 1/227 = 0.44% Posted Speed: 50 mph Left Turn Lane: Not Warranted Exhibit 1310-7a Left-Turn Storage Guidelines: Two-Lane, Unsignalized 40 m p h * * 50 mph * * 60 mph** % Total DHV Turning Left (single turning movement)Total DHV*1,000 900 800 700 600 500 400 300 0 5 10 15 20 25 Below curve, storage not needed for capacity. Above curve, further analysis recommended. KEY: 1 2 1 2 1 2 1 21,100 * DHV is total volume from both directions **Speeds are posted speeds PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 57 Forecast 2026 PM Peak Hour B. Cape George Rd & Southwestern Access Total DHV: 231 vph Left Turn %: 3/231 = 1.30% Posted Speed: 50 mph Left Turn Lane: Not Warranted Exhibit 1310-7a Left-Turn Storage Guidelines: Two-Lane, Unsignalized 40 m p h * * 50 mph * * 60 mph** % Total DHV Turning Left (single turning movement)Total DHV*1,000 900 800 700 600 500 400 300 0 5 10 15 20 25 Below curve, storage not needed for capacity. Above curve, further analysis recommended. KEY: 1 2 1 2 1 2 1 21,100 * DHV is total volume from both directions **Speeds are posted speeds PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 58 Forecast 2026 PM Peak Hour C. Cape George Rd & Northeastern Access Total DHV: 254 vph Left Turn %: 1/254 = 0.39% Posted Speed: 35 mph Left Turn Lane: Not Warranted Exhibit 1310-7a Left-Turn Storage Guidelines: Two-Lane, Unsignalized 40 m p h * * 50 mph * * 60 mph** % Total DHV Turning Left (single turning movement)Total DHV*1,000 900 800 700 600 500 400 300 0 5 10 15 20 25 Below curve, storage not needed for capacity. Above curve, further analysis recommended. KEY: 1 2 1 2 1 2 1 21,100 * DHV is total volume from both directions **Speeds are posted speeds PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 59 Forecast 2026 PM Peak Hour D. Cape George Rd & Southeastern Access Total DHV: 269 vph Left Turn %: 3/269 = 1.11% Posted Speed: 35 mph Left Turn Lane: Not Warranted Exhibit 1310-7a Left-Turn Storage Guidelines: Two-Lane, Unsignalized 40 m p h * * 50 mph * * 60 mph** % Total DHV Turning Left (single turning movement)Total DHV*1,000 900 800 700 600 500 400 300 0 5 10 15 20 25 Below curve, storage not needed for capacity. Above curve, further analysis recommended. KEY: 1 2 1 2 1 2 1 21,100 * DHV is total volume from both directions **Speeds are posted speeds PO Box 397 Puyallup, WA 98371 (253) 770 1401 heathtraffic.com 60 Forecast 2026 PM Peak Hour E. S Discovery Rd & Access Total DHV: 202 vph Left Turn %: 1/202 = 0.50% Posted Speed: 40-mph Left Turn Lane: Not Warranted