HomeMy WebLinkAboutAttachment2_BidComparisonTable-ForReportPort Hadlock Water Reclamation Facility MBR Equipment Bid Evaluation
1 of 10
Port Hadlock Water Reclamation Facility
MBR Equipment Procurement
Proposal Comparison Table 3/18/21
Worksheet A question Cloacina H2O Innovation Ovivo Compliance with
procurement
specification
Response summary PDF page Response summary PDF page Response summary PDF page
1.01 Pass/Fail Criteria
A. Experience Criteria 1: All
membrane units and subunits
furnished shall be new and unused
and shall be the standard products
of a Membrane Manufacturer
having a minimum 5 years
manufacturing the proposed
membrane subunit. The Bidder shall
document and provide proof or
deviation rationale.
◼ Suez
◼ Hollow fiber polymeric membranes
◼ ZeeWeed 500
ZeeWeed since 1990 (Zenon), has since
sold product line to Suez. Manufactured in
Hungary.
29/86, 44-
45
◼ Memstar
◼ Hollow-fiber PVDF membranes
◼ 3G -TIPS was launched in 2012.
H2O Innovations has manufacturing
facilities in Quebec, Minnesota, and Vista
(CA); skid mounted systems
manufactured in Quebec and Minnesota.
20/212 ◼ Ovivo
◼ Flat plate silicon carbide ceramic
membranes
Product group inception in 2001. Current
membrane manufacturing facilities in
Denmark and Hutto, TX. Will be opening a
membrane manufacturing facility near
Austin, TX – anticipated by late 2022.
4/162 Cloacina – comply
H2O Innovation –
comply
Ovivo – comply
B. Experience Criteria 2: Bidder shall
have a minimum 5-year history
furnishing at least fifteen (15) full
scope MBR Package Plant Systems in
the USA. The Bidder shall document
and provide proof of providing
support, service, and applicable
inventory or de viation rationale.
MEMPAC series MBRs since 2009. Stock all
sensory instrumentation and most major
equipment replacement parts in
warehouse in CA. Expedited parts
agreement with vendors.
Hero Support Services, after-care support
program has ticketing/po rtal program.
29/86 Attached list of projects in US and Canada
over the past 10 years.
Project manager will be assigned to
project during design and construction.
Has maintained excellent relationships
with vendors. Has in-house service and
commissioning support team.
20/212,
25-
28/212,
78-94/212
Have sold >150 MBR package plant
systems, since 2003.
Has engineering, technical support,
fabrication, and controls teams in -house,
as well as management of the membrane
manufacturing.
6/162,
12-
14/162
Cloacina – comply
H2O Innovation –
comply
Ovivo – comply
C. Experience Criteria 3: Bidder shall
have supplied at least ten (10)
operational plants of the current
package plant model proposed. The
Bidder shall document and provide
the information on projects with
their bid.
MEMPAC series MBRs since August 2009.
Has close to 50 models of MEMPAC family
in the “marketplace”.
One WA project in the 10 examples
provided: in Tri-Cities for private
development.
29-33/86 H2O Innovations designs and fabricates
custom package plants for each client.
20/212,
78-97/212
microBlox commercially available starting
in 2012. Have 50 units in operation.
7/162 Cloacina – comply
H2O Innovation –
comply
Ovivo – comply
D. ISO 9001 Certification: the MBR
System Supplier shall submit with
their Bid, their quality system ISO
9001 certification. The company
identification and quality
procedures shall indicate for the
MBR System Supplier that the
Quality Management System is
applicable to design, manufacturing,
supply, installation, and servicing of
wastewater and water treatment
plants, associated equipment and
systems, and for the Membrane
Manufacturer the Quality
Suez manufacturing facility for membranes
is ISO9001 certified.
Exception taken by Cloacina. Cloacina has
their own 200+ point QA/QC/QMS system
and can provide more information if
requested.
42/86,
47/86
Manufacturing facility for Memstar
membranes is ISO9001 and ISO14001
certified.
Exception taken by H2O Innovation. H2O
Innovation has QMS similar to I SO
certifications, including audits.
20/212 Complies for Austin, Salt Lake City, and
Round Rock fabrication facilities.
Proposal states that this is applicable to
design, manufacturing, supply,
installation, and servicing of treatment
plants, associated equipment, and
systems.
10/162 Cloacina – exception
H2O Innovation –
exception
Ovivo - comply
Port Hadlock Water Reclamation Facility MBR Equipment Bid Evaluation
2 of 10
Worksheet A question Cloacina H2O Innovation Ovivo Compliance with
procurement
specification
Response summary PDF page Response summary PDF page Response summary PDF page
Management System is applicable to
the manufacturing of membrane
material and equipment. The quality
system shall be audited by a third-
party independent inspector.
Certification shall remain in e ffect
throughout 1 year past the
commissioning of the project.
E. Bonding capacity: Have an
aggregate bonding capacity of at
least $20,000,000.
Bonded $5M, with aggregate backlog of
approximately $25M.
48/86 Single bond requests by surety for H2O
Innovations up to $5M, up to aggregate
$30M.
21/212 $15M for single bond, $75M aggregate. 11/162 Cloacina – comply
H2O Innovation –
comply
Ovivo – comply
F. System support capacity:
Demonstrate sufficient inventory to
support the membrane market;
ability to provide ancillary
membrane support and mounting
equipment, pipe and support
fabrication, equipment warehouse
and staging of project equipment;
and the team members necessary to
support and service the MBR system
both remotely and through in-field
efforts, including for plant start-up
coordination, mechanical checkout,
operator training, and
troubleshooting of membrane
systems. The Bidder shall provide
the following with their Bid:
1. Proof of providing support,
service, and applicable
inventory; organizational chart
with personnel names, titles,
contact information, years of
experience with MBR system
supply and servicing; location of
personnel and inventory; or
2. Provide deviation rationale if not
able to meet this requirement
Suez stocks membranes, cassettes,
hardware, accessories in excess of anything
necessary for complete and total
replacement of Pt. Hadlock project.
Cloacina has partnered with Suez before,
and Suez support staff is available to
Cloacina. Cloacina has its own 24/7
support service for existing customers, with
min. 2 full-time post-production staff
available at any given time.
Cloacina maintains remote SCADA
connection to all its systems. All customers
enrolled into Cloacina’s subs idiary support
program which offers portal access to
interactive troubleshooting guides, O&M
library, and videos. Hero Services Ticketing
Program also provides tracking of service
requests, warranty claims, operational
assistance.
37/86 Schematic org chart provided, along with
several resumes of key staff. Has 24/7 on -
call support hotline for emergencies. For
non-emergencies there is support staff
during business hours.
On-site support costs (for performance
testing) not included in cost proposal. On
page 29/212 of proposal, there is per day
rate and charges for such services.
Per Spec 464240 3.4.A.2, expected there
to be 2 site visits, for 4 working days.
Assuming one person, 4 days, two trips, 4
nights x $200, 6 days x $100 =
4*($1250/day/person) + 4*1.15
markup*($200/night lodging) + 6*1.15
markup*($100/day incidentals) + 2*1.15
markup*($500/round trip flight) = $7760
However, as stated in page 53/212, the
following are provided in the cost
proposal:
◼ Four (4) day site visit by an H2O
trained installation specialist delivery
inspection and installation
assistance, in one (1) trip
◼ Four (4) day site visit by an H2O
trained installation specialist for
clean water testing and functional
testing, in two (2) trips
22-29/212 Org chart provided, and description of
engineering, technical support, controls,
fabrication, and manufacturing teams at
company facilities.
12/162 Cloacina – comply
H2O Innovation –
comply
Ovivo – comply
Port Hadlock Water Reclamation Facility MBR Equipment Bid Evaluation
3 of 10
Worksheet A question Cloacina H2O Innovation Ovivo Compliance with
procurement
specification
Response summary PDF page Response summary PDF page Response summary PDF page
◼ Thirty (30) day site visit by an H2O
trained installation specialist for
commissioning and startup, in two
(2) trips
G. Warranty and guarantee
compliance: General Equipment,
System Performance, and
Membrane Subunit warranties are
specified in Specification 464240
Membrane Bioreactor Equipment
Section 1.13. Bidder shall provide
evidence of meeting these
warranties and provide any
exceptions or clarifications with
their bid.
No exceptions taken. However, design in
proposal does not reflect treatment
capacity for peak flows equalized to 0.150
mgd, as established in Adden dum 3, and
assumes equalization only to peak day flow
of 0.111 mgd.
49-50/86 H2O Innovation provided proposed
warranty with bid.
A major mechanical warranty exception
to Specification Section 464240 Section
1.13 B.1: “this warranty does not extend
to equipment, parts, or components
manufactured by a third party into which
the equipment is incorporated”.
29/212 Ovivo provided list of exceptions to the
warranty and the following:
◼ General equipment – 24 months
◼ Fine bubble diffuser – 60 months
◼ MBR system performance – 12
months
◼ Membrane diffuser clogging – 12
months
◼ Membrane plate – 12 years (4 flat/8
prorated)
14/162,
78-
89/162
Cloacina – appear to
have missed
Addendum 3; have not
designed for handling
up to peak equalized
flow of 0.150 mgd.
H2O Innovation –
proposed boilerplate
warranty. Appears that
they will not warrant
equipment
manufactured by
others, which is not in
compliance with
procurement
specification.
Ovivo – proposed list of
exceptions
H. Membrane process description
and mandatory process and MBR
redundancy requirement: The
Bidder shall submit an explanatory
statement of the MBR System
treatment process. The Bidder shall
also certify and include an
explanatory statement that the MBR
System design meets the reliability
requirements described in
Specification Section 464240
Paragraphs 2.4.A.4, 2.4.B.1, and
2.4.C.1, and Section 400100
Paragraph 2.7, which includes the
following: reliability through
redundancy for Class A reclaimed
water with no flow bypass nor
storage of inadequately treated
water; 100% of max month flow
system performance requirements
listed in Specification Section
Proposal acknowledges WAC 173-219-350
Reliability Requirements.
◼ Headworks: appears to have one
redundant fine screen
◼ Pre -anoxic basin(s): have 1 basin
◼ Anoxic basin(s): have 2 basins,
volumes not redundant
◼ Aerobic basin(s): have partitions, but
volumes not redundant; unclear if
there is operating scheme to allow
fully compliant operation with one out
of service indefinitely
◼ MBR basin(s): have full redundancy
◼ UV disinfection: appears to have
redundancy with 2 units
◼ Mixers: no shelf spares
◼ Blowers, pumps: unclear if there are
hardwired spares; no shelf spares, but
rebuild kits included
◼ Controls: no spare PLC provided
33/86,
48/86
“Two trains are provided o n the
membranes so that the system can
operate with one train offline. A spare
process blower is supplied as part of the
spare parts, ensuring that the aerobic
system can continue to operate in the
event of an aerobic blower failure.”
◼ Headworks: appears to have one
redundant fine screen, with grease
trap
◼ Pre -anoxic basin(s): have 1 basin
◼ Anoxic basin(s): have 1 basin
◼ Aerobic basin(s): have 1 basin
◼ MBR basin(s): have full redundancy
◼ UV disinfection: has redundancy
with 2 units
◼ Mixers: shelf spare provided
◼ Blowers, pumps: shelf spares and
rebuild kits included, but does not
31-35/212 Page 4/162:
464249 2.4 A.B.1
The aerobic zones shall meet 100% of
MMF system performance requirements
with one tank out of service indefinitely.
“Our design verified by our BioWin
modeling provided with this proposal
shows MMF goals accomplished with 1
aerobic tank offline indefinitely.
microBLOX is set up to easily bypass 1
basin keeping the others online.”
464249 2.4.C.1
The Membrane zones shall meet 100% of
MMF system performance requirements
Indefinitely
“Our design verified by our BioWin
modeling provided with this proposal
shows MMF goals accomplished with 1
4/162,
15/162
Cloacina – have
redundancy in MBR
basin volume, but have
not demonstrated
redundancy/reliability
for aeration basin
volume.
H2O Innovation – have
redundancy in MBR
basin volume , but have
not demonstrated
redundancy/reliability
for aeration basin
volume.
Ovivo – appear to
comply and submitted
simulation results for
having one aeration
basin or one MBR basin
Port Hadlock Water Reclamation Facility MBR Equipment Bid Evaluation
4 of 10
Worksheet A question Cloacina H2O Innovation Ovivo Compliance with
procurement
specification
Response summary PDF page Response summary PDF page Response summary PDF page
464240 Paragraph 2.3, with the
largest aerobic zone or MBR zone
out of service indefinitely .
appear to have hardwired
redundancy
◼ Controls: no spare PLC provided
membrane tank offline indefinitely.
microBLOX is set up to easily bypass 1
basin keeping the others online.”
Page 15/162:
System sized such that either one aeration
tank or one membrane tank can be taken
offline indefinitely, and still run at MMF.
3 pre -aeration tanks in parallel, sized such
that two are adequate to provide enough
oxygen contribution needed for MMF
flow.
2 membrane tanks in parallel. Each
membrane tank has hydraulic capacity to
run at MMF with the other tank out of
service indefinitely. All pre -aeration tanks
would need to be online to make up for
oxygen contribution lost.
◼ Headworks: have one redundant fine
screen, coarse screen would be
bypassed if out of service
◼ Pre -anoxic basin(s): have 1 basin
◼ Anoxic basin(s): have 1 basin
◼ Aerobic basin(s): have 3 basins; have
demonstrated that can run plant at
MMF with 1 basin offline
◼ MBR basin(s): have full redundancy
◼ UV disinfection: has redundancy with
2 UV trains
◼ Mixers: shelf spare provided
◼ Blowers, pumps: hardwired spares
provided
◼ Controls: shelf spare PLC provided
out of service and
handling MMF.
I. Asset Management Program ZOHO Creator, program created by
Cloacina.
Cloacina will build module to fit the needs
of the project.
34/86 eMaint, program by Fluke/H2O
Innovation
35/212,
131-
146/212
WaterExpert, program by inCTRL
Solutions/Ovivo
16/162 Cloacina – appears
compliant
H2O Innovation –
appears compliant
Ovivo – appears
compliant
Port Hadlock Water Reclamation Facility MBR Equipment Bid Evaluation
5 of 10
Worksheet A question Cloacina H2O Innovation Ovivo Compliance with
procurement
specification
Response summary PDF page Response summary PDF page Response summary PDF page
1.02 Operations and Maintenance Parameters
A. Min influent flow and WQ
parameters (BOD, TKN, TSSS, pH,
ALK, temp) to operate plant.
A. The Bidder shall include a
statement that indicates the
minimum influent flow and water
quality parameters (including but
not limited to BOD, TKN, TSS, pH,
alkalinity, temperature range) that
will be necessary to operate the
MBR System and meet water
effluent water quality requirements.
The Bidder shall include a minimum
inflow and wastewater strength that
will be necessary in order to operate
the entire treatment system from
influent through to infiltration bed
disposal.
Minimum influent flow condition copied
from conditions in procurement
specification.
60/86 Minimum influent flow condition copied
from conditions in procurement
specification.
Noted that min flows for design load are
33,000 gpd; if flow or loads are under,
supplemental carbon would need to be
added to aerobic tank.
36-37/212 Turndown capability comes from rotary
lobe pumps, basin bypass flexibility
because of redundancy. During startup
flows, one membrane basin could be
taken offline and membrane plates in the
unused basin can be stored dry.
Provided two minimum start-up flow
scenarios of 0.024 mgd and anticipated
start-up flow of 0.048 mgd as stated in
specification, with one membrane basin
offline.
20/162 Cloacina –
acknowledged startup
flow provided in
procurement
specification.
H2O Innovation –
acknowledged startup
flow provided in
procurement
specification.
Ovivo – provided
system simulation
results for operating at
two minimum flow
conditions (0.024 and
0.048 mgd).
B.1 Total MBR System Tank Vol Pre -anoxic basin: 1364 gal
Aerobic basin (total of 3): 12081*3 = 36243
gal
Anoxic basin (total of 2): 12081*2 = 24162
gal
MBR basin (total of 2): 4077*2 = 8154 gal
Membrane area: 11100 SF (duty); 11100 SF
(spare)
34/86,
57/86,
66/86
Pre -anoxic basin: 18500 gal
Aerobic basin: 34500 gal
Anoxic basin: 8000 gal
MBR basin (total of 2): 8000 gal
Membrane area: 11836 SF (duty); 11836
SF spare
38/212 Pre -anoxic basin: 3389 gal
Aerobic basin (total of 3): 6901*3 = 20703
gal
Anoxic basin (total of 2): 3907 + 6161 =
10068 gal
MBR basin (total of 2): 3588*2 = 7176 gal
Membrane area: 2860 SF (duty); 2860 SF
(spare)
21/162
Cloacina – unclear if
have capacity to
operate for
redundancy/reliability
if aeration basin out of
service.
H2O Innovation –
unclear if have capacity
to operate for
redundancy/reliability
if aeration basin out of
service.
Ovivo – demonstrated
ability to operate with
one aeration basin or
one MBR basin out of
service.
B.2.a MBR System Footprint (all
equipment supplied including tanks,
skids, platforms, chemical system,
maintenance envelope)
1710 SF 34/86 40’x50’ = 2000 SF initial phase
93’x50’ for future expansion phase
38-39/212
54’-6” x 31’-8” = 1729 SF
21/162
Not applicable – for
comparison only.
B.2.b Equipment slab area 2058 SF 34/86 40’x50’ = 2000 SF initial phase
38-39/212
1729 SF 22/162 Not applicable – for
comparison only.
Port Hadlock Water Reclamation Facility MBR Equipment Bid Evaluation
6 of 10
Worksheet A question Cloacina H2O Innovation Ovivo Compliance with
procurement
specification
Response summary PDF page Response summary PDF page Response summary PDF page
93’x50’ for future expansion phase
B.2.c Building slab area Not appliable; no building supplied. 34/86 Not appliable; no building supplied. 38-39/212 Not appliable; no building supplied. 22/162 Not applicable – for
comparison only.
B.3 Total interconnecting pipe 100 ft 35/86 Did not provide value; from figure, looks
like 10 ft for interconnecting pipes
between steel tanks. Proposal states that
piping within equipment container is
provided by bidder.
40/212 64 ft 22/162 Not applicable – for
comparison only.
B.4 Total interconnecting wiring 16 ft pre -wired harnesses 35/86 On site electrical work consists of
connecting junction or remote IO panels
to MCP and power panel in the container.
40/212 COMM 24 VDC; 2-wire, 14 AWG: 6 LF
COMM 24 VDC; 2-wire, 14 AWG: 6 LF
480 VAC; 3-wire, 12 AWG: 6 LF
COMM 24 VDC; 2-wire, 14 AWG: 12 LF
Total 30 LF of interconnecting wire.
23/162 Not applicable – for
comparison only.
B.5 Membrane sludged weight 4000 lb 35/86 3000 lb. Shipping weight 1280 lb. 40/212 2140 lb 23/162 Not applicable – for
comparison only.
B.6 Lifting height 17’ 35/86 11.5’ tank height + 8’ lift height over top
of membrane wall = 19.5’ total lifting
height, plus hook height for crane
40/212 9’-10” to the lifting hook + approx. 3’ to
get to platform = 12’-10”
23/162 Not applicable – for
comparison only.
B.7.a Headworks Max grit level <2 inches 35/86 No answer provided Not
applicable
“Grit removal is not required for Ovivo
coarse and f ine screens…influent grit
concentrations shall be reduced to less
than 5 mg/L, measured by standard
methods”
23/162,
43/162
Not applicable – for
comparison only.
B.7.b Fine screen perforation size 2 mm 35/86 2mm, no bypass. Grease trap will be
provided as part of headworks.
41/212 Coarse screen 5 mm, followed by fine
screens 2 mm
23/162 Cloacina – have 2 fine
screens.
H2O Innovation – have
2 fine screens.
Ovivo – have more
screens; redundancy in
fine scre ens. 1 coarse,
3 fine.
B.8 Max influent FOG 150 mg/L 35/86 Max influent FOG to headworks not
provided.
Max FOG to membranes 50 mg/L if
animal/vegetable oil; 3 mg/L if mineral
oil-based FOG.
41/212 100 mg/L
SiC membranes can be cleaned at pH of 13
after major FOG event.
23/162 Not applicable – for
comparison.
B.9 membrane chlorine lifetime
PPM hours
500,000 PPM-hr 35/86 1,000,000 PPM-hr 41/212 5,000,000 PPM-hr
24/162 Not applicable – for
comparison.
Port Hadlock Water Reclamation Facility MBR Equipment Bid Evaluation
7 of 10
Worksheet A question Cloacina H2O Innovation Ovivo Compliance with
procurement
specification
Response summary PDF page Response summary PDF page Response summary PDF page
Chlorine degradation is related to
supporting mate rial of membrane, rather
than SiC membrane itself.
B.10 Membrane flux at 10 C with
one membrane unit offline, MMF
8.1 gfd 35/86 10.5 gfd 41/212 Conflicting information provided: 18.0 gfd
or 31.4 gfd
24/162,
82/162
Not applicable – for
comparison.
B.11 Surface porosity Did not provide answer. 35/86 Nominal pore size is 0.04 micron.
Memstar modules have high porosity at
70-80%, and high membrane
permeability.
41/212 48% 24/162 Not applicable – for
comparison.
B.12 Membrane subunit shelf life Indefinite with proper storage 35/86 “Extended periods of time” if stored
properly
41/212 Indefinite; can be stored dry 24/162 Not applicable – for
comparison.
B.13 Total air scour 230 SCFM 35/86 50 SCFM per train 41/212 140 SCFM per membrane basin; 280 SCFM
with both membrane basins online
24/162 Not applicable – for
comparison.
B.14 Chemical degradation No 35/86 Membranes are resistant to some
chemicals and are affected by others.
41/212 No, for any chemical use and
concentration typical for municipal
WWTP, including accidental overdose of
chemicals.
24/162 Not applicable – for
comparison.
B.15.a Maintenance clean and
backwash – can membranes be
backwashed
Yes 35/86 Yes 41/212 Yes 25/162 Cloacina – comply
H2O Innovation –
comply
Ovivo – comply
B.15.b Maintenance clean and
backwash – Is maintenance clean
fully or semi-automated
Yes 35/86 Yes; Have automated chemically
enhanced backpulse weekly, and semi-
automated clean in place quarterly.
41/212 Yes, fully automated maintenance clean.
For certain conditions, could also add low
doses of chemical to backwash cycles.
25/162 Cloacina – comply
H2O Innovation –
comply
Ovivo – comply
B.16 Physical damage for fatigued
from foreign objects/fatigued from
extended operation.
Yes by foreign objects.
Fatigued from extended operation – yes.
Provided explanation that this is no
different from other membranes including
ceramic membranes, which have sealant to
composite headers.
Also states that Cloacina is the only mfr
that provides triple redundant s afeguard
against accidental hand/programmatic
membrane damage due to over-pressuring.
35/86 Yes; membranes protected by fine
screening and rescreening to minimize
risk of foreign objects and sharp object
intrusion into MBR.
Did not answer question on fatigue.
41/212 No, SiC membranes not prone to physical
damage from foreign objects or fatigued
from extended aeration.
26/162
Not applicable – for
comparison.
Port Hadlock Water Reclamation Facility MBR Equipment Bid Evaluation
8 of 10
Worksheet A question Cloacina H2O Innovation Ovivo Compliance with
procurement
specification
Response summary PDF page Response summary PDF page Response summary PDF page
B.17 Method of sludge recovery
from tank dewatering
Automatic desludging button, which
activates several valves
35/86 Can be hosed at low pressure or
physically cleaned through additional
aeration and physical agitation of fibers.
Membrane aeration system designed to
provide adequate aeration to prevent
excess sludging of fibers during normal
operation.
42/212 In situ backwash with air scour, or if that is
inadequate, modules can be pulled from
basin and pressure -washed.
27/162 Not applicable – for
comparison.
B.18 MLSS operating range 6000-9000 mg/L 35/86 7,000-8,000 mg/L 42/212 8,500-16,507 mg/L depending on the
operating conditions.
29/162 Not applicable – for
comparison.
B.19 Design sludge age
(specification minimum is 20 days)
33-42 days 35/86 22 days 42/212 17-24 days 29/162 Cloacina – comply
H2O Innovation –
comply
Ovivo – in at least one
operating scenario,
does not comply, with
17 days.
B.20 Annual labor hours See comparative present worth analysis
B.21.a Spare parts See comparative present worth analysis
B.21.b Annual power usage (at
Design Flow condition)
See comparative present worth analysis
B.21.c Annual chemical usage (at
Design Flow condition)
See comparative present worth analysis
21.d.ii Replacement membrane
subunits – expected membrane life,
replacement interval
Example projects have membrane
replacement at 10-16 years.
44-45/86 Expected membrane life 10 years 167/212 Membrane life estimated at 20+ years. 36/162 Not applicable – for
comparison.
1.03 Other Bid Support Documentation
A. List of equipment manufacturers Manufacturers and quantity provided 54/86 Manufacturers and quantity provided 8/212,
43/212
Manufacturers provided, quantity unclear 39/162,
33/162
Not applicable – for
comparison.
B. Electrical drawings, showing
connection/interconnection point
characteristics (e.g. voltage, phase,
frequency, currency draw, signal
level, wiring/cable time, field
termination provisions)
General information on interconnection
points provided; example drawings,
including information on typical
instrumentation, provided from a similar
project.
57/86 Example P&IDs provided showing typical
instrumentation, but no information on
controls. No information provided on
interconnection point.
151-
164/212
Illustration provided of where power is to
be connected (under PLC on skid). 480
VAC, 3 ph, 60 Hz, 200 Amp.
40/162 Not applicable – for
comparison.
C. I&C drawings, showing separately
shipped components and assemblies
along with field connections. Show
location of each connection
General information on interconnection
points provided; example drawings,
including information on typical
instrumentation, provided from a similar
project.
57/86 Instrumentation diagram provided, but
no information on control in diagram; no
PLC shown in drawings. No clear
indication of where connections are.
151-
164/212
Equipment and instrumentation factory
pre -wired other than electrical feed
connection. There will need to be a low -
voltage communications wire connection
to DO probe on supplemental tank.
41/162 Not applicable – for
comparison.
D.1 Preliminary PFD, Design Flow PFD provided 58/86 PFD provided 150/212 PFD provided 98/162 Not applicable – for
comparison.
Port Hadlock Water Reclamation Facility MBR Equipment Bid Evaluation
9 of 10
Worksheet A question Cloacina H2O Innovation Ovivo Compliance with
procurement
specification
Response summary PDF page Response summary PDF page Response summary PDF page
D.2 Preliminary PFD, Future
Expansion
No future expansion PFD provided No future expansion PFD provided Future expansion PFD provided 98/162 Cloacina – did not
provide plan
H2O Innovation – did
not provide plan
Ovivo – provided plan
E. Mechanical layout drawings Layout drawing provided 57/86 Schematic illustration with general
dimensions provided.
39/212 Layout drawing provided 99/162 Not applicable – for
comparison.
F Prelim calcs for biological
treatment system
Attached. Equalized peak flow to peak day
0.111 mgd, not 0.150 mgd.
60-67/86 Attached. 169-
212/212
Attached. 42/162 Cloacina – comply, did
attach calculations, but
did not equalize to
peak flow in
Addendum 3.
H2O Innovation –
comply, provided
simulation results but
not in much detail.
Ovivo – comply,
provided calculations
and proof of various
operating scenarios.
G. UV system CA State Water Board
Title 22 approval
Aquionics Proline PQ IL 400 UV System,
which is Title 22 approved
36/86 Aquionics. Note that additional
information could be requested.
48/212 NeoTech finalizing Title 22 conditional
acceptance. If conditional acceptance is
not finalized, Aquionics will be used
instead.
With NeoTech UV, Ovivo plans to put in
two UV rows with 3 units in series. With
one unit out of service, would reduce
treatment output capacity.
47/162 Cloacina – comply
H2O Innovation –
comply
Ovivo – comply
H. Names, license numbers of
registered PEs
List of names provided and license numbers 36/86 No specific names provided, but
statement that they will be stamped by
an engineer registered to practice in
Washington State
48/212 One name provided, and license number 47/162 Not applicable
I. Warranty information, detailing
membrane design fluxes for all
seasonal flow conditions
No additional information provided. Warranted flux values not explicitly
listed; proposed warranty text provided
in proposal.
29/212 Attached. 78-
89/162
Any deviations to
warranty in
specifications will need
to be further
evaluated.
J. System start-up and test
procedures
Not provided. Instructions would be provided to
Contractor. H2O Innovation would
48/212 Attached. 90-
96/162
Cloacina – information
missing.
Port Hadlock Water Reclamation Facility MBR Equipment Bid Evaluation
10 of 10
Worksheet A question Cloacina H2O Innovation Ovivo Compliance with
procurement
specification
Response summary PDF page Response summary PDF page Response summary PDF page
provide representative to site to provide
technical assistance for installation prior
to clean water testing and system
startup.
H2O Innovation –
information missing
Ovivo – some deviation
from specification.
Other items of note Exceptions taken:
◼ Will not do permeability testing of
each membrane module, but would
provide testing data for related
batches (page 19/212).
◼ Proposed payment terms that are
negotiable, but heavily loads
payments before County would
receive equipment (page 18/212).
Other exclusions:
◼ On-site support costs for
performance testing are not
included in cost proposal; daily and
per diem rate schedule provided
(page 29/212)
◼ Design, supply and installation of
any and all weather protection,
buildings or sheds of any kind (page
54/212)
Not applicable.