Loading...
HomeMy WebLinkAboutPiping Installation Options at Wetland Boundary 8-27WLWLWLWL WL WLWLWL WL WL WL WL WL WL WL WL PP1 7 10+00 11+0 0 12+00 13+00 14+00 3 4 12.0' WIDE GRAVEL ROADWAY, SEE 3/C-007 10" PS 3 C-011 20' WIDE TEMP CONSTRUCTION ACCESS RD 5 5 6 TYP 2FIBER OPTICWWWUTVUTVUTVUTVFOFOFOFO10''PS 6''PS6''PS6''PS6''PS10''P S 10''P S 10''PS 10''PS 10''PS 10''PS 10''PS 10''PS 10''PS8590 84 84868788 89 91 92 93 94 9 5 10096 9 6 9696 97 98 9995 93939 3 94 94 94 949485 90 84 86 87 88 89 91 92 WETLAND BOUNDARY 3-PHASE PWR GRADING LIMIT GRADING LIMIT 43 LF 8" CULVERT FUTURE SEWER FUTURE SEWER OVERHEAD POWER FUTURE SEWER COMM MATCHLINE STA 14+40SCALE: HORIZ: 1"= 20' VERT: 1"= 5' PROFILE N ACCESS RD 65 70 75 80 85 90 95 100 105 65 70 75 80 85 90 95 100 105 EXSTPROP10+0095.995.9198.198.1295.695.5595.495.4195.895.7911+0095.995.8595.495.4398.398.3596.396.2994.394.2612+0093.593.4789.489.3686.486.4093.193.1094.394.2913+0094.694.6494.194.1593.893.8094.094.0393.993.9114+0093.793.7493.093.0314+4092.892.75-0.32%-0.92%4.60%0.16%-2.40% -2.16%-1.01%-3.31% 2.23%0.98%-0.60%-1.53% -3.97% -3.39%5.71% -2.56%3.42%GB STA 10+05.02EL 95.67GB STA 10+39.77EL 95.56GB STA 10+69.11EL 95.29GB STA 10+80.76EL 95.82GB STA 11+00.00EL 95.85GB STA 11+33.66EL 95.04GB STA 11+83.27EL 93.97GB STA 12+14.96EL 92.90GB STA 12+36.21EL 92.35GB STA 12+57.76EL 93.09GB STA 12+87.07EL 94.76GB STA 13+06.09EL 94.57GB STA 13+33.75EL 93.66GB STA 13+65.40EL 94.06GB STA 13+91.74EL 93.90GB STA 14+01.88EL 93.75GB STA 14+30.42EL 92.6210" PS Checked By: Drawn By: Project No.: Designed By:www.tetratech.comMARKDATEDESCRIPTIONBY3/28/2021 4:42:25 PM - C:\USERS\BRYAN.THOMASY\BIM 360\TETRA TECH INC\200-12562-20003 PT. HADLOCK\PROJECT FILES(WORKING MODEL)\CAD-MODELFILES\SHEETFILES\WWTF\C-201-INFLUENT PRESSURE SEWER P&P.DWG - THOMASY, BRYAN1 A B C D E F 2 3 4 5 6 7 Bar Measures 1 inch Copyright: Tetra Tech200-12562-20003RECLAMATION PLANTAND INFLUENT PIPELINEJEFFERSON COUNTY, WASHINGTONPORT HADLOCK UGA SEWER SYSTEM1420 FIFTH AVENUE, SUITE 600SEATTLE, WA 98101PHONE:(206) 883-9300 FAX:(206) 883-930160% DESIGN PRE LI MI N A R Y NOT F O R C O N S T R U C TI O N CALL BEFORE YOU DIG 811 MATCH LINE SEE C-7010 SCALE: 5 10 1" = 5' VERT CONSTRUCTION NOTES CONNECTION TO EXISTING POWER. COORDINATE WITH JEFFERSON COUNTY PUD (PUD). SEE ELECTRICAL DRAWINGS NEW POWER POLE TO BE INSTALLED BY PUD. COORDINATE 3-PHASE SITE POWER CONNECTION WITH PUD. SEE ELECTRICAL DRAWINGS PROPOSED GRADING SHOWN IS FOR 20' WIDE TEMPORARY CONSTRUCTION ACCESS ROAD. FINAL GRAVEL ROADWAY SECTION TO BE 12' WIDE. SEE CROSS SECTIONS 1-3/C-505 SEE DETAIL 3/C-501 FOR FINAL GRAVEL ROADWAY SECTION TRASH RACK ON PIPE ENDS PER 6/C-505 AND PIPE OUTLET QUARRY SPALLS MAT PER 5/C-508 REMOVE OR ABANDON IN-PLACE EXISTING CULVERT AS NECESSARY FOR CONSTRUCTION INSTALL THREE REMOVABLE BOLLARDS PER 8/C-502. SPACING BETWEEN BOLLARDS SHALL BE 4' MIN. AND 5' MAX. INSTALL 21" BLIND FLANGE AT END OF INFLUENT GRAVITY PIPE 1 2 3 4 5 6 7 8 1 W-101NESS' CORNER ROADC-201PLAN AND PROFILEINFLUENT SEWERSTA XX+XX TO STA XX+XXC. AU-YEUNG B.THOMASY J. CLAREN0 SCALE: 10'20'40' 1'' = 20'