Loading...
HomeMy WebLinkAbout053 00 et '. p. LN. ~" '::1 "'0 D STATE OF WASHINGTON County of Jefferson In the Matter of: Updating the Official County Road Log: 1 sl Street ) ) ) RESOLUTION NO. 53..--00 WHEREAS, the following road has been established as a Public Right-of- Way in the Plats of Phillips Addition to Irondale and lronda1e Heights; and WHEREAS, the following road has been constructed to the standards of the Jefferson County Department of Public Works; and WHEREAS, the following road will be maintained at public expense; and WHEREAS, the Official County Road Log is filed in the County Engineer's Office; NOW, THEREFORE BE IT RESOLVED, that the County Engineer is hereby directed to make the following addition to the Official County Road Log: Road Number 638209 Road Name 1 sl Street Section! T ownship/Range S2, T29N, R1 W. Milepost Begin/End 0.00 - 0.19 Intersects Cedar Avenue, c.R No. 637109; M.P. 0.23 Right 'Î ttL 'k APPROVED AND ADOPTED this fa< day of (; Ä{)-t!. ,2000. SEAL: ATTEST: Lorna L Delaney, CMC Clerk of the Board D!bl/f~ JEFFERSON COUNTY DEPARTMENT OF PUBLIC WORKS P.O. Box 2070 1322 Washington St. Port Townsend, WA 98368 (360) 385-9160 Gary A. Rowe, P.E., Public Works Director/County Engineer MEMORANDUM TO: Jefferson County Board of Commissioners FROM: Gary A. Rowe, Public Works Director / County Engineer 4~ a..f?~c.. April 26, 2000 DATE: RE: County Engineer's Report: 1 sl Street and South Maple Street County Road construction The referenced roads are within the Plat ofIrondale Heights. 1 sl Street is also within the existing Plat of Phillips Addition to Irondale. South Maple Street is also within the Plats of Phillips Addition to lrondale and South Port Townsend. The developer of lrondale Heights has constructed 15t Street from Cedar Avenue to its intersection with Maple Street, a distance of approximately 1,000 feet. South Maple Street is already on the County Road Log from Irondale Road to its intersection with 151 Street. The developer has improved South Maple Street from 2nd Street to 1 sl Street, a distance of approximately 260 feet. Both roadways have a 22 feet wide asphalt surface. The Department of Public Works reviewed and approved the road construction and stormwater management plans. The roads were designed in accordance with the requirements of the Department's adopted standards, the Policy on Geometric Design of the American Association of State Highway and Transportation Officials. The stormwater management plan is consistent with the standards of the Washington Department of Ecology Stormwater Management Manual for the Puget Sound Basin. The Department of Public Works inspected construction. The materials used in construction conform to the Standard Specifications of the Washington Department of Transportation. The roads were constructed in accordance with the approved plans. Dedication of these roads would extend the existing County Road system in the area and provide improved circulation. ill consideration of the above, I recommend that the Board of County Commissioners accept the dedication of 1 st Street as a County Road and approve the resolution adding it to the County Road Log. GAR/jwp 100% Recycled Paper