Loading...
HomeMy WebLinkAbout075 99 STATE OF WASHINGTON County of Jefferson IN THE MATTER OF ACCEPTING BID FOR THE FLETCHER CREEK CULVERT REPLACEMENT, LOWER HOH ROAD, COUNTY PROJECT # CD 1382 } } } } } RESOLUTION NO.75-99 WHEREAS, Jefferson County Board of Commissioners on August 9, 1999 called for bids for the above mentioned project, and; WHEREAS, due notice of the call for bids was given as required by law, and; WHEREAS, one (1) bid was received and opened during public session for the week of August 23, 1999, as shown in the attached bid tabulation, and; WHEREAS, it is in the best interest of the people of Jefferson County to select the most responsive of the acceptable bids received, now therefore, IT IS HEREBY RESOLVED, that the best and most responsive bid was submitted by Addleman Logging Co. Inc, for a total bid amount of$108,700.00 and that this bid be accepted and IT IS FURTHER RESOL VED, that the specifications and contract documents in their entirety as included in the bid package, are part ofthis bid acceptance. APPROVED AND ADOPTED this 26thday of August ~ 1999 . SEAL: JEFFERSON COUNTY BOARD OF COMMISSIONERS ATTEST Lorna L. Delaney Clerk of the Board ~ VOI- ') 5 ...."" "'~"6 I '- '~, ' - >--' rg;~ feJ BID TABULATION SHEET FLETCHER CREEK CULVERT REPLACEMENT Construction BidT ab. xis DATE BYKC 26.Aug-99 -- BID OPENING AUGUST 23, 1999. CONTRACTOR NO.1 Addleman Logging ENGINEER'S ESTIMATE 497 Henry Boyd Re>ad PO11 AMeles, WA 98362 ITEM APPROK UNIT ITEM DESCRiPTION UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. QUANTITY 810 BID BID 810 BID BID 810 BIO BID 81D BID BID BID BID PREPARATION 1 1 L.S. Moblijzatjon 514,400.00 514,400.00 $24,000.00 $24,000.00 2 0_5 ACRE Clearing and Grubbing 58,000_00 $4.000.00 517,000_00 58,500_00 GRADING 3 340 C.Y. Gravel Borrow 100. Haul 530.00 510,200.00 524.00 $8,160_00 DRAINAGE 4 30 TON Quarry Spa! Un;ng $40 ,00 51,200.00 530.00 5900.00 5 160 TON Streambed Gravel 560.00 59,600,00 522.00 53,520.00 6 1 LS- Aluminum eo. Culvert Insla/latjon 550,000.00 550,000_00 510,000.00 510,000_00 SURFACING 7 45 C.v. Gravel Base 530.00 51,350.00 520.00 5900_00 8 40 TON Crushed Surfadru;¡ Top Course 540.00 51,600_00 550.00 52,000.00 ASPHALT CONCRETE PAVEMENT ~ 9 40 TON Aspha~ ColIc. Pavement CI. 8 5100.00 $4,000.00 5242,00 S9,saO_OO ~ EROSION CONTROL AND PLANTING 10 0.25 ACRE Seedlno 51,600,00 S4OO,OO $3,200,00 5800,00 , 11 1 L,S. Temoorarv Water PoIlutionIEros;on Control 510,000.00 510,000.00 $4,000,00 $4,000.00 , 12 1 l.S. Landscap;ru;¡ 510,000.00 510,000.00 54,600.00 $4,600.00 ~" 'to TRAFFIC 13 1 l.S. Traffic Detour 515,000.00 515,000.00 55,00000 55,000.00 OTHER ITEMS 14 350 CX Siructure E.cavabon aass Bind. Haul 560.00 521,000.00 $12.00 54,200.00 15 1 L.S. Trimmlna and Cleanup 52,000_00 52,000.00 51,000,00 51,000.00 16 160 C.Y. Unsuitable Faundatjon Excavatjon Incl. Haul $45.00 58,100.00 510_00 51,800.00 17 1020 S_F, Sharing or Exrn Excavation CI. 8. 55,00 55,100.00 52.00 52,040.00 18 160 CX Quarry Spalls for Subgrade Baddill 540.00 $6,400.00 535.00 $5,600.00 19 1 EACH Bed Control Loo 52,200.00 52,200-00 51,900_00 $1,900_00 20 1 EACH Rool Wad Bani< Protection 51,400.00 51,400.00 51,500_00 S1.500.00 21 30 TON Man Rock 5225.00 $6,750.00 550.00 51,500.00 22 1 EACH Deflector Lag 52,00000 52.000_00 51,200,00 51,200_00 23 2 EACH Log With Root Wad 51,ZOO.00 52,400.00 51,250.00 52,500.00 24 2 EACH Vortex Rock Weir 5800,00 51,600.00 5500.00 51.000.00 25 1 EACH LoCliRock Grade Gonlrol 53,500_00 53,500.00 52,400.00 52.400_00 Total. S1M.20C.ÐO $108,700.00 SO,OO SO.OO 50,00 50.00 / JEFFERSON COUNTY DEPARTMENT OF PUBLIC WORKS P.O. Box 2070 1322 Washington St. Port Townsend, WA 98368 (360) 385-9160 Frank Gifford, Public Works Director/County Engineer MEMORANDUM DATE: August 26, 1999 TO: Board of County Commissioners Frank Gifford, Public Works Director/County Engineer, interim. 4t! ;.. /6;, Recommendation of award of bid for Fletcher Creek Culvert Replacement, Lower Hoh Road, Project #CD1382. FROM: Re: The Public Works Department has completed checking the bids for the above referenced project. Addleman Logging Co. Inc., 497 Henry Boyd Road, Port Angeles, W A 98362, submitted the only bid, for the amount of$108,700.00. Public Works recommends award of the Fletcher Creek Culvert Replacement contract to Addleman Logging Company, Inc. Cc: Project file CD1382 , VOI~ 25 r~:,: 788 100% Recycled Paper