Environmental ● Geotechnical Engineering ● Special Inspection ● Non-Destructive Testing ● Materials Testing
Burlington|Olympia|Bellingham|Silverdale|Tukwila
360.755.1990
www.mtc -inc.net
As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval.
Environmental ● Geotechnical Engineering ● Special Inspection ● Non-Destructive Testing ● Materials Testing
Burlington|Olympia|Bellingham|Silverdale|Tukwila
360.755.1990
www.mtc -inc.net
As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval.
Dosewallips State Park - River Campsites Relocation - 19S010-05, 05/12/2021, #F255653, Page 1 of 2
Dosewallips State Park - River Campsites Relocation - 19S010-05 - Field Report:
Reinforcing Steel: Report #F255653
CLIENT Washington State DATE 05/12/2021
PROJECT LOCATION 32374 Highway 101 Brinnon WA PERMIT #BLD20-00368
Inspection Information:
Inspection Date:
05/12/2021 Time Onsite: 11:30 Weather
Conditions:Patly Cloudy 64* F
Inspection Performed:Reinforcing Steel
Subcontractor:Nordvind Continuous or Periodic:Periodic
Sheets:Foundation plan, 11 of 31
Location/Area:Outside Walkway Surround building
Details:11 of 31 Level/Elevation:SOG / See plans
Reinforcing Grade:ASTM A615 GR60 Embeds:None At This Time
Reference Reports:None Approved Plans Dated:
Remarks:
REINFORCING STEEL: Periodic Inspection
MTC inspector on-site to observe placement of ASTM A615 GR60 Reinforcing steel into SOG at the locations noted above.
Reinforcement was checked for proper size, grade, lap splice, spacing, cover, clearance etc. All work appeared to be done
in accordance with approved project plans and specifications provided on-site by contractor.
Noteworthy Items: Contractor used #4 rebar while plans state #3 rebar to be used.
To the best of MTC inspector's knowledge, the above-described work was performed in general accordance with project
specifications and approved plans.
Images:
UPLOADED: 05/12/2021 12:06:01 UPLOADED: 05/12/2021 13:09:59
Environmental ● Geotechnical Engineering ● Special Inspection ● Non-Destructive Testing ● Materials Testing
Burlington|Olympia|Bellingham|Silverdale|Tukwila
360.755.1990
www.mtc -inc.net
As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval.
Dosewallips State Park - River Campsites Relocation - 19S010-05, 05/12/2021, #F255653, Page 2 of 2
UPLOADED: 05/12/2021 13:10:02
REPORTED BY: Jacob Talley REVIEWED BY: Robert McNamara, Project Manager
Environmental ● Geotechnical Engineering ● Special Inspection ● Non-Destructive Testing ● Materials Testing
Burlington|Olympia|Bellingham|Silverdale|Tukwila
360.755.1990
www.mtc -inc.net
All results apply only to actual locations and materials tested. As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or
regarding our reports is reserved pending our written approval.
Environmental ● Geotechnical Engineering ● Special Inspection ● Non-Destructive Testing ● Materials Testing
Burlington|Olympia|Bellingham|Silverdale|Tukwila
360.755.1990
www.mtc -inc.net
All results apply only to actual locations and materials tested. As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or
regarding our reports is reserved pending our written approval.
Dosewallips State Park - River Campsites Relocation - 19S010-05, 05/18/2021, #C256119, Page 1 of 2
Dosewallips State Park - River Campsites Relocation - 19S010-05 - Compression
Test: Concrete: Report #C256119
CLIENT Washington State DATE 05/18/2021
PROJECT LOCATION 32374 Highway 101 Brinnon WA PERMIT #BLD20-00368
Inspection Information:
Inspection Date:
05/18/2021
Time Onsite: 12:00
pm
Weather
Conditions:60's, Partly Cloudy
Inspection Performed:Compression Test: Concrete
Field Data (ASTM C-31):
Location of Placement:Side Walk around building
Sample Location:Side Walk around building rite side
Contractor:Nordvind Subcontractor:N/A Supplier/Plant:Miles/208
Qty Placed, Cu.
Yd.:
10.25 of
15
Slump, Inches (ASTM C-143) or W/C
Ratio:5 Concrete Temp, °F (ASTM C-1064):75
Delivery Ticket
#:173276 Job Spec. Slump:6 Ambient Temp, °F:70
Truck #:1114 Air Content, % (ATSM C-231):5.1 Min Temp, °F:N/A
Batch Time:10:49 Job Spec. Air:5+-1 Max Temp, °F:N/A
Sample Time:12:30
Mix # and Proportions:0150A/10.25
Cement, lbs.:4855 Coarse Agg, lbs.:19080 Admixture, oz./cwt:MBAE 30 oz.
Flyash, lbs.:N/A Coarse Agg, lbs.:N/A Admixture, oz./cwt:N/A
Water, gals.:309 Coarse Agg, lbs.:N/A Admixture, oz./cwt:N/A
Fine Agg, lbs.:14680 Coarse Agg, lbs.:N/A Admixture, oz./cwt:N/A
15 Gallons of water were added Prior to sampling
Sample Type & Compression Test Results:
Received 05/20/2021 Sample Set 1 of 1 Type of Compression
Test:Concrete (ASTM C-39)
Sampling was done in accordance with ASTM C172.
Lab Tests:
New Log
#
Test
Age
(Days)
Date of Test
Total
Load
(Lbs.)
Sample
Dim.
(In.)
Sample
Area (Sq.
In.)
Comp.
Strength
(PSI)
Tested By Break
Type
ASTM
C-617
ASTM
C-1231
4614 7 05/25/2021 50,944 3.99 12.50 4,080 Ciara Macke 2
4615 28 06/15/2021 60,461 3.99 12.50 4,840 Ciara Macke 2
4616 28 06/15/2021 65,116 3.99 12.50 5,210 Ciara Macke 2
4617 28 06/15/2021 66,354 3.99 12.50 5,310 Ciara Macke 2
4618 H 0
REQ'D 28 3,000
Remarks:
Environmental ● Geotechnical Engineering ● Special Inspection ● Non-Destructive Testing ● Materials Testing
Burlington|Olympia|Bellingham|Silverdale|Tukwila
360.755.1990
www.mtc -inc.net
All results apply only to actual locations and materials tested. As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or
regarding our reports is reserved pending our written approval.
Dosewallips State Park - River Campsites Relocation - 19S010-05, 05/18/2021, #C256119, Page 2 of 2
MTC Rep. was present at the site to cast strength cylinders for the sidewalk around the building.
Slump 4" Air 5.1 Temp 75. All placement was acceptable per the contract documents.
No pictures at this time.
Average 28 day strength = 5120 PSI
REPORTED BY: Bryan Talley REVIEWED BY: Medhanie Tecle, Professional Engineer
Environmental ● Geotechnical Engineering ● Special Inspection ● Non-Destructive Testing ● Materials Testing
Burlington|Olympia|Bellingham|Silverdale|Tukwila
360.755.1990
www.mtc -inc.net
All results apply only to actual locations and materials tested. As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or
regarding our reports is reserved pending our written approval.
Environmental ● Geotechnical Engineering ● Special Inspection ● Non-Destructive Testing ● Materials Testing
Burlington|Olympia|Bellingham|Silverdale|Tukwila
360.755.1990
www.mtc -inc.net
All results apply only to actual locations and materials tested. As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or
regarding our reports is reserved pending our written approval.
Dosewallips State Park - River Campsites Relocation - 19S010-05, 03/09/2021, #252027, Page 1 of 1
Dosewallips State Park - River Campsites Relocation - 19S010-05 - Compression
Test: Cast by Others: Report #252027
CLIENT Washington State DATE 03/09/2021
PROJECT LOCATION 32374 Highway 101 Brinnon WA PERMIT #BLD20-00368
Inspection Information:
Inspection Date:
03/09/2021 Time Onsite: N/A Weather
Conditions:N/A
Inspection Performed:Compression Test: Cast by Others
Field Data (ASTM C-31):
Location of Placement:N/A
Sample Location:N/A
Contractor:N/A Subcontractor:N/A Supplier/Plant:Miles
Qty Placed, Cu.
Yd.:14CY Slump, Inches (ASTM C-143) or W/C
Ratio:N/A Concrete Temp, °F (ASTM C-1064):N/A
Delivery Ticket
#:N/A Job Spec. Slump:N/A Ambient Temp, °F:N/A
Truck #:N/A Air Content, % (ATSM C-231):N/A Min Temp, °F:N/A
Batch Time:N/A Job Spec. Air:N/A Max Temp, °F:N/A
Sample Time:N/A
Mix # and Proportions:01500
Cement, lbs.:N/A Coarse Agg, lbs.:N/A Admixture, oz./cwt:N/A
Flyash, lbs.:N/A Coarse Agg, lbs.:N/A Admixture, oz./cwt:N/A
Water, gals.:N/A Coarse Agg, lbs.:N/A Admixture, oz./cwt:N/A
Fine Agg, lbs.:N/A Coarse Agg, lbs.:N/A Admixture, oz./cwt:N/A
Sample Type & Compression Test Results:
Received 03/10/2021 Sample Set of Type of Compression
Test:Concrete (ASTM C-39)
Lab Tests:
New Log
#
Test
Age
(Days)
Date of Test
Total
Load
(Lbs.)
Sample
Dim.
(In.)
Sample
Area (Sq.
In.)
Comp.
Strength
(PSI)
Tested By Break
Type
ASTM
C-617
ASTM
C-1231
2533 28 04/06/2021 38,214 4.02 12.69 3,010 Ciara Macke 2
2534 28 04/06/2021 41,182 4.02 12.69 3,250 Ciara Macke 2
REQ'D 28 3000
Remarks:
Samples cast by others. Only able to get 2 cores from plastic pipe. No other concrete information was provided.
Average 28 day strength = 3,130 psi
REPORTED BY: Ciara Macke REVIEWED BY: Medhanie Tecle, Professional Engineer
Environmental ● Geotechnical Engineering ● Special Inspection ● Non-Destructive Testing ● Materials Testing
Burlington|Olympia|Bellingham|Silverdale|Tukwila
360.755.1990
www.mtc -inc.net
All results apply only to actual locations and materials tested. As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or
regarding our reports is reserved pending our written approval.
Environmental ● Geotechnical Engineering ● Special Inspection ● Non-Destructive Testing ● Materials Testing
Burlington|Olympia|Bellingham|Silverdale|Tukwila
360.755.1990
www.mtc -inc.net
All results apply only to actual locations and materials tested. As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or
regarding our reports is reserved pending our written approval.
Dosewallips State Park - River Campsites Relocation - 19S010-05, 03/18/2021, #C251522, Page 1 of 2
Dosewallips State Park - River Campsites Relocation - 19S010-05 - Compression
Test: Concrete: Report #C251522
CLIENT Washington State DATE 03/18/2021
PROJECT LOCATION 32374 Highway 101 Brinnon WA PERMIT #BLD20-00368
Inspection Information:
Inspection Date:
03/18/2021 Time Onsite: 9am Weather
Conditions:46* F rain
Inspection Performed:Compression Test: Concrete
Field Data (ASTM C-31):
Location of Placement:Interior slab on grade, 14 isolated Footings for Porch
Sample Location:Isolated Footings at SW corner
Contractor:Nordvind Subcontractor:N/A Supplier/Plant:Miles / 208
Qty Placed, Cu.
Yd.:
+/- 11 C.Y.
of 20
Slump, Inches (ASTM C-143) or W/C
Ratio:4 Concrete Temp, °F (ASTM C-1064):59
Delivery Ticket
#:172860 Job Spec. Slump:4 Max Ambient Temp, °F:46
Truck #:1177 Air Content, % (ATSM C-231):N/A Min Temp, °F:N/A
Batch Time:8:43am Job Spec. Air:N/A Max Temp, °F:N/A
Sample Time:10:05
Mix # and Proportions:01500
Cement, lbs.:5205 Coarse Agg, lbs.:#57: 20280 Admixture, oz./cwt:N/A
Flyash, lbs.:N/A Coarse Agg, lbs.:N/A Admixture, oz./cwt:N/A
Water, gals.:323 Coarse Agg, lbs.:N/A Admixture, oz./cwt:N/A
Fine Agg, lbs.:17700 Coarse Agg, lbs.:N/A Admixture, oz./cwt:N/A
0 Gallons of water were added Prior to sampling
Sample Type & Compression Test Results:
Received 03/19/2021 Sample Set 1 of 1 Type of Compression
Test:Concrete (ASTM C-39)
Sampling was done in accordance with ASTM C172.
Lab Tests:
New Log
#
Test
Age
(Days)
Date of Test
Total
Load
(Lbs.)
Sample
Dim.
(In.)
Sample
Area (Sq.
In.)
Comp.
Strength
(PSI)
Tested By Break
Type
ASTM
C-617
ASTM
C-1231
2295 7 03/25/2021 52,826 4.00 12.57 4,200 Ciara Macke 2
2296 28 04/15/2021 68,472 4.00 12.57 5,450 Ciara Macke 2
2297 28 04/15/2021 70,883 4.00 12.57 5,640 Ciara Macke 2
2298 28 04/15/2021 71,314 4.00 12.57 5,670 Ciara Macke 2
2299 H 0
REQ'D 28 3000
Remarks:
Environmental ● Geotechnical Engineering ● Special Inspection ● Non-Destructive Testing ● Materials Testing
Burlington|Olympia|Bellingham|Silverdale|Tukwila
360.755.1990
www.mtc -inc.net
All results apply only to actual locations and materials tested. As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or
regarding our reports is reserved pending our written approval.
Dosewallips State Park - River Campsites Relocation - 19S010-05, 03/18/2021, #C251522, Page 2 of 2
For more information refer to feild report #F251516
Average 28-day break = 5,590 psi
REPORTED BY: Jacob Talley REVIEWED BY: Medhanie Tecle, Professional Engineer
Environmental ● Geotechnical Engineering ● Special Inspection ● Non-Destructive Testing ● Materials Testing
Burlington|Olympia|Bellingham|Silverdale|Tukwila
360.755.1990
www.mtc -inc.net
All results apply only to actual locations and materials tested. As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or
regarding our reports is reserved pending our written approval.
Environmental ● Geotechnical Engineering ● Special Inspection ● Non-Destructive Testing ● Materials Testing
Burlington|Olympia|Bellingham|Silverdale|Tukwila
360.755.1990
www.mtc -inc.net
All results apply only to actual locations and materials tested. As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or
regarding our reports is reserved pending our written approval.
Dosewallips State Park - River Campsites Relocation - 19S010-05, 03/18/2021, #C251522, Page 1 of 2
Dosewallips State Park - River Campsites Relocation - 19S010-05 - Compression
Test: Concrete: Report #C251522 - DRAFT
CLIENT Washington State DATE 03/18/2021
PROJECT LOCATION 32374 Highway 101 Brinnon WA PERMIT #BLD20-00368
Inspection Information:
Inspection Date:
03/18/2021 Time Onsite: 9am Weather
Conditions:46* F rain
Inspection Performed:Compression Test: Concrete
Field Data (ASTM C-31):
Location of Placement:Interior slab on grade, 14 isolated Footings for Porch
Sample Location:Isolated Footings at SW corner
Contractor:Nordvind Subcontractor:Supplier/Plant:Miles / 208
Qty Placed, Cu.
Yd.:
+/- 11 C.Y.
of 20
Slump, Inches (ASTM C-143) or W/C
Ratio:4 Concrete Temp, °F (ASTM C-1064):59
Delivery Ticket
#:172860 Job Spec. Slump:4 Max Ambient Temp, °F:46
Truck #:1177 Air Content, % (ATSM C-231):N/A Min Temp, °F:
Batch Time:8:43am Job Spec. Air:N/A Max Temp, °F:
Sample Time:10:05
Mix # and Proportions:01500
Cement, lbs.:5205 Coarse Agg, lbs.:#57: 20280 Admixture, oz./cwt:
Flyash, lbs.:Coarse Agg, lbs.:Admixture, oz./cwt:
Water, gals.:323 Coarse Agg, lbs.:Admixture, oz./cwt:
Fine Agg, lbs.:17700 Coarse Agg, lbs.:Admixture, oz./cwt:
0 Gallons of water were added Prior to sampling
Sample Type & Compression Test Results:
Received 03/19/2021 Sample Set 1 of 1 Type of Compression
Test:Concrete (ASTM C-39)
Lab Tests:
New Log
#
Test
Age
(Days)
Date of Test
Total
Load
(Lbs.)
Sample
Dim.
(In.)
Sample
Area (Sq.
In.)
Comp.
Strength
(PSI)
Tested By Break
Type
ASTM
C-617
ASTM
C-1231
2295 7 03/25/2021 52,826 4.00 12.57 4,200 Ciara Macke 2
2296 28 04/15/2021 0
2297 28 04/15/2021 0
2298 28 04/15/2021 0
2299 H 0
REQ'D 28 3000
Remarks:
For more information refer to feild report #F251516
DR
A
F
T
Environmental ● Geotechnical Engineering ● Special Inspection ● Non-Destructive Testing ● Materials Testing
Burlington|Olympia|Bellingham|Silverdale|Tukwila
360.755.1990
www.mtc -inc.net
All results apply only to actual locations and materials tested. As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or
regarding our reports is reserved pending our written approval.
Dosewallips State Park - River Campsites Relocation - 19S010-05, 03/18/2021, #C251522, Page 2 of 2
REPORTED BY: Jacob Talley REVIEWED BY: ,
DR
A
F
T
Environmental ● Geotechnical Engineering ● Special Inspection ● Non-Destructive Testing ● Materials Testing
Burlington|Olympia|Bellingham|Silverdale|Tukwila
360.755.1990
www.mtc -inc.net
As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval.
Environmental ● Geotechnical Engineering ● Special Inspection ● Non-Destructive Testing ● Materials Testing
Burlington|Olympia|Bellingham|Silverdale|Tukwila
360.755.1990
www.mtc -inc.net
As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval.
Dosewallips State Park - River Campsites Relocation - 19S010-05, 03/18/2021, #F251516, Page 1 of 2
Dosewallips State Park - River Campsites Relocation - 19S010-05 - Field Report:
Concrete: Report #F251516
CLIENT Washington State DATE 03/18/2021
PROJECT LOCATION 32374 Highway 101 Brinnon WA PERMIT #BLD20-00368
Inspection Information:
Inspection Date:
03/18/2021 Time Onsite: 9am Weather
Conditions:46*F rain
Inspection Performed:Concrete
Subcontractor:Nordvind Continuous or Periodic:Periodic for RS Continuous for RC
Sheets:Foundation plan, 11 of 31 Location/Area:Interior SOG & 14 isolated Footings for porch
(No Grids)
Details:11 of 31 Level/Elevation:Foundation-SOG / See plans
Approved Plans Dated:03/02/2021
Remarks:
REINFORCING STEEL: Periodic Inspection
MTC inspector on-site to observe placement of ASTM A615 GR60 reinforcing steel into footings & SOG at the location
noted above.
Reinforcing steel was checked for proper size, grade, lap splice, placement, cover, clearance, spacing etc. and was secure
prior to concrete placement.
All work was done according to project plans and specifications provided on-site by contractor.
CONCRETE PLACEMENT: Continuous Inspection
Drawings indicate that they conform to 2015 IBC, Seismic Design Category D.
MTC inspector on site, as requested, to observe the placement of approximately 20 CY of concrete with Mix Design ID
#01500 supplied by Miles into footings and interior SOG at the location noted above.
One set of five (4” x 8”) cylinders was cast for compressive strength test specimens. Refer to Report #C251513 for field
test results and for more information.
Concrete was placed via PumpTruck, was mechanically consolidated with high-cycle vibrator, and finished by hand.
To the best of MTC inspector's knowledge, the above-described work was performed in general accordance with project
specifications and approved plans.
Images:
Environmental ● Geotechnical Engineering ● Special Inspection ● Non-Destructive Testing ● Materials Testing
Burlington|Olympia|Bellingham|Silverdale|Tukwila
360.755.1990
www.mtc -inc.net
As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval.
Dosewallips State Park - River Campsites Relocation - 19S010-05, 03/18/2021, #F251516, Page 2 of 2
UPLOADED: 03/22/2021 08:42:34 UPLOADED: 03/22/2021 08:42:37
UPLOADED: 03/22/2021 08:43:45
REPORTED BY: Jacob Talley REVIEWED BY: Robert McNamara, Project Manager
Environmental ● Geotechnical Engineering ● Special Inspection ● Non-Destructive Testing ● Materials Testing
Burlington|Olympia|Bellingham|Silverdale|Tukwila
360.755.1990
www.mtc -inc.net
All results apply only to actual locations and materials tested. As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or
regarding our reports is reserved pending our written approval.
Environmental ● Geotechnical Engineering ● Special Inspection ● Non-Destructive Testing ● Materials Testing
Burlington|Olympia|Bellingham|Silverdale|Tukwila
360.755.1990
www.mtc -inc.net
All results apply only to actual locations and materials tested. As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or
regarding our reports is reserved pending our written approval.
Dosewallips State Park - River Campsites Relocation - 19S010-05, 05/18/2021, #C256119, Page 1 of 2
Dosewallips State Park - River Campsites Relocation - 19S010-05 - Compression
Test: Concrete: Report #C256119 - DRAFT
CLIENT Washington State DATE 05/18/2021
PROJECT LOCATION 32374 Highway 101 Brinnon WA PERMIT #BLD20-00368
Inspection Information:
Inspection Date:
05/18/2021
Time Onsite: 12:00
pm
Weather
Conditions:60's, Partly Cloudy
Inspection Performed:Compression Test: Concrete
Field Data (ASTM C-31):
Location of Placement:Side Walk around building
Sample Location:Side Walk around building rite side
Contractor:Nordvind Subcontractor:N/A Supplier/Plant:Miles/208
Qty Placed, Cu.
Yd.:
10.25 of
15
Slump, Inches (ASTM C-143) or W/C
Ratio:5 Concrete Temp, °F (ASTM C-1064):75
Delivery Ticket
#:173276 Job Spec. Slump:6 Ambient Temp, °F:70
Truck #:1114 Air Content, % (ATSM C-231):5.1 Min Temp, °F:N/A
Batch Time:10:49 Job Spec. Air:5+-1 Max Temp, °F:N/A
Sample Time:12:30
Mix # and Proportions:0150A/10.25
Cement, lbs.:4855 Coarse Agg, lbs.:19080 Admixture, oz./cwt:MBAE 30 oz.
Flyash, lbs.:Coarse Agg, lbs.:N/A Admixture, oz./cwt:N/A
Water, gals.:309 Coarse Agg, lbs.:N/A Admixture, oz./cwt:N/A
Fine Agg, lbs.:14680 Coarse Agg, lbs.:N/A Admixture, oz./cwt:N/A
15 Gallons of water were added Prior to sampling
Sample Type & Compression Test Results:
Received 05/20/2021 Sample Set 1 of 1 Type of Compression
Test:Concrete (ASTM C-39)
Lab Tests:
New Log
#
Test
Age
(Days)
Date of Test
Total
Load
(Lbs.)
Sample
Dim.
(In.)
Sample
Area (Sq.
In.)
Comp.
Strength
(PSI)
Tested By Break
Type
ASTM
C-617
ASTM
C-1231
4614 7 05/25/2021 50,944 3.99 12.50 4,080 Ciara Macke 2
4615 28 06/15/2021 0
4616 28 06/15/2021 0
4617 28 06/15/2021 0
4618 H 0
REQ'D 28 3,000
Remarks:
MTC Rep. was present at the site to cast strength cylinders for the sidewalk around the building.
DR
A
F
T
May 25 2021
Environmental ● Geotechnical Engineering ● Special Inspection ● Non-Destructive Testing ● Materials Testing
Burlington|Olympia|Bellingham|Silverdale|Tukwila
360.755.1990
www.mtc -inc.net
All results apply only to actual locations and materials tested. As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or
regarding our reports is reserved pending our written approval.
Dosewallips State Park - River Campsites Relocation - 19S010-05, 05/18/2021, #C256119, Page 2 of 2
Slump 4" Air 5.1 Temp 75. All placement was acceptable per the contract documents.
No pictures at this time.
REPORTED BY: Bryan Talley REVIEWED BY: ,
DR
A
F
T
May 25 2021