Loading...
HomeMy WebLinkAboutBLD2019-00139-10- CommunicationsREVISED 2/22/2022 REVISED 2/22/2022 Email: mike@mdstructural.com phone: 360.433.9093 500 Broadway St. Ste. 460, Vancouver WA 98660 1 May 11, 2022 Shane Harper studio STL shane@studio-stl.com 360.344.8385 RE: Nothnagle Special Inspection Requirements Project #3121 Site Address: 620 Beckett Point Road Port Townsend, WA 98368 Dear Shane, At your request, I have reviewed the special inspection requirements for the Nothnagle Residence. In the structural notes, we have listed some inspections that are not required. Please see below: 1.Special Inspection is not required for concrete construction. The concrete has been designed using f’c of 2,500 psi and meets exception 2 of section 1705.3 of the IBC. 2.Special Inspection is not required for steel construction. There is limited steel work on this project (one post) and the loading is not critical. 3.Special Inspection for the wood sheathed shear walls is to be periodic, performed after nailing of the shear walls and before covering. If you have any questions regarding these requirements, please do not hesitate to contact me at our office. Sincerely, Michael Daubenberger, SE S T R U C TURA L E N G I N E E R RECEIVED DCD 5/12/22