APPLICATION: 18-2561 DEV, JEFFCO SPORTSMANS NOISE ABATEMENT & SAFETY STALLS
Sponsor: Jefferson Co Sportsmen's Assn Program: Firearms & Archery Range Rec.Status: Application Returned
APPLICATION REVIEW
LINKS TO ADDITIONAL INFORMATION
Development Projects - Manual 4
Long Term Obligations - Manual 7
Developing a PowerPoint Presentation
Firearms & Archery Range Rec Program - Manual 11
FARR Grant Applicant's To-Do-Lists
ADVISORY COMMITTEE COMMENTS
Use way less text on slides and use full screen pictures
There were questions about match including donation so you might want to break it out under Question 7 give more details so they believe you have
that much in labor especially
Change slide 8 as it is just a screen shot of what they see already in prism maybe an excel spread sheet or some kind of graph or chart easy to read
and understand about what matches you have and the source of them.
Give more clarity on what the pods are about in design and make sure you know what your buying and what they delivering is it site built from panels or
is it complete drop in place building. I think they were unsure exactly what you were going to install there or build and how it will really work .
Address the sound around range an what the decimal noise reduction will be if more than just s few decimals like it was said. Think they want to see
more sound numbers or if it really does what you ned to do in sound reductions. Give them more confidence its going to make it quieter and more
safe.
Really follow the criteria and answer each one with clarity. Number and label slides
Hear are some general comments I paste into every ones review
Please be sure to Label all slides with numbers and the
correct criteria you are answering. Be sure to use full page slides and limit
text on slides to only a few bullet points.
Please do NOT read text off slides to evaluators. Please follow a script and keep text on
slides to a minimum and only use text bullet points or labels on slides for
important messages.
Your project type only requires answers to certain
questions. Please review the scoring
criteria in the manual and only answer those required. Do NOT answer staff scored questions.
Question 11 Matching Shares, although it is a
pre-scored question you can bump up your match to get more points if
you have the capacity to match more.
If you need to put something in about a question you do not
answer, for example such as “Immediacy of threat “ but you don’t answer that question
unless you are acquiring land, maybe it
can fit under the “need” question.
Please keep your introduction short and key in on the
location and type of work and scope of this project only. You want them to have a good idea of where
and what this project is going to be after they hear it. Leave off history and other non-essential
details. You could work them into the answers on the questions worth the most
points. Be sure to focus on getting the most points under the criteria as
possible. You get no points for your
introduction. But they should be waiting
to hear more about it and get their answers to questions as you present the
answers under each criteria question.
You may need to add more slides in your power point
presentation to address all of the criteria question in order to get points for
each one. Be sure to label all slide
with numbers and use full pictures on each slide where possible. Make them big and clear to show message.
PROJECT DETAILS
COSTS
Page Grant Manager Comment
Project Description I have or will made edits to the project description to be more precise and have it ready for our
contract language should it be funded. Please do not edit this before you talk to me. You may re-
write or add to the portion after the last sentence but Prism limits the amount of words that can be
used
Page Grant Manager Comment
Page Grant Manager Comment
PROJECT PERMITS
ATTACHMENTS
SUBMIT APPLICATION
Development Cost
Estimates
Architectural, Administrative, and Engineering maximum(AAE) is 20% of allowable construction
project costs. Project funding will be limited to the amount in the application. Cultural resources
review for potential adverse impacts is required under EO 05-05 prior to ground-disturbing
activities. You may want to include costs for a cultural resources survey, in case one is
required.Cultural Resources-Costs: All projects should include costs associated with completing
a cultural resources survey, unless the project area has already been investigated. If RCO
determines a survey or other oversight is not necessary, those funds can be used for other
projects activities. The amount and type of field investigation is scaled to the nature and extent
of the proposed ground disturbing activity. The cost of the survey will vary, however, we
recommend that a minimum of $10,000 be included. If your project is occurring in or near a
known archaeological site, or will affect historic structures, it is recommended that you include an
appropriate amount of funds to address these issues. A cultural resources consultant can assist
you in developing an appropriate cost estimate. Association for Washington Archaeology
maintains a consultant list at https://washingtonarchaeology.org/consultants-list. Cultural
resources assessment costs are eligible for reimbursement if included in your grant agreement.
RCO will not initiate cultural resources review and consultation until after the projects have been
approved for funding, you will then be notified of your specific requirements.
Cost Summary make sure you have the right amount of money in this project for what you will be doing in 2 years
. Lately the costs of any construction and labor rates have gone way up and you want to have
enough money for the future if the pods and installation costs more in the time where you will be
doing the work.
Page Grant Manager Comment
Project Permits Please enter the dates you expect to apply for permits; or enter the date the permit was received,
the expiration date, and the permit number. Enter additional information critical to the permit and
review process timeline.
Page Grant Manager Comment
Attachments Your APE map needs to be redone. Needs outline around the site where the work will disturb the
ground and be dug up. Use the picture or map of area where it can show where on the site the
work will take place. it also need to have north arrow, address of site and section township and
range numbers on it. Your boundary maps and draft final map need to be more accurate. You
might want to use the map from the visuals PPt you did and use the Visuals map or the Adjacent
users map or facilities layout map slide for this instead of what you attached.
Page Grant Manager Comment
Submit Application Be sure to do improvements and modifications needed and then re submit the project in prism
again before technical completion date of January 14th 2019. However, please don’t wait until the
last minute.
Your power point presentations are not due until 3 business days before the evaluation day you
are presenting on. However, please don’t wait until the last minute to attach your PPT in prism.