Loading...
HomeMy WebLinkAboutCBV CostsCosts incurred from September 13. 2021 to March 25. 2022 Ooerations $ 134.878.58 ICR $ 25.848.29 Set uD and on-aoina costs of Phase 1 $ 132.757.51 Construction Manaaement Fee $ 9.250.00 Design & Plannina Fees $ 8.400.00 Enaineerina Fees $ 5.000.00 Site excavation $ 10.154.63 Septic $ 1.448.32 Electric site work $ 27.551.33 Water & Septic Utilities $ 8.693.08 Electic- Phase 2a $ 23.812.29 Garbaae area Dad $ 1.626.75 Phase 1 fence rental (11189 month) $ 6.931.52 Storaae tents $ 6.451.46 $ 402.803.76 Contract with Jefferson County $ 398.000.00 Over K amount $ 4,803.76