Loading...
HomeMy WebLinkAboutFletcher_TNC v2X28X X X842,500845,000 847,500 850,000 312,5001 2 3 4 5 Middle Hoh ResiliencyProject Fletcher Ranch - DNR Concept Design Canyon C r e ek Spr u c e C r e e k Upper H o h Roa d Slumpi n g Cl a y Author: Date: 10/4/2021 Path: N:\Projects\Jefferson County\MiddleHoh ResiliencyPlan\GIS\maps\mxd\Concept_LindnerSC.mxdLambert conformal conic projection,NAD 1983 State Plane Coordinate System (WA North Zone). Parcel Boundaries (Jefferson County Assesor,2020). Aerial (RM 16-24, NAIP2019; RM 24-32 NAIP2017). 0 500 1,000Feet ¹0 1 2Miles Legend USGSRiverMiles Parcel Lines Roads(Public and Private) APEXJAMS LOW PROFILEJAM EXISTING LOGJAMREINFORCEMENT PROBABLE EXISTINGHARDPOINT RIPARIAN THINNING, PLANTING,CONIFER RELEASE DEFLECTORJAMS PRIVATE PRIVATE PRIVATE PRIVATE PRIVATE PRIVATE PRIVATE STATE O F W A S H I N G T O N D N R STATE O F W A S H I N G T O N D N R STATE O F W A S H I N G T O N D N R THENATURECON S E R V A N C Y THENATURECONS E R V A N C Y THENATURECONS E R V A N C Y THENATURECONS E R V A N C Y THENATURE CONSERVANCY STATE O F W A S H I N G T O N D N R STATE O F W A S HI N G T O N D N R PRIVATE PRIVATE PRIVATE PRIVATE PRIVATE PROPOSED LEGEND X28X X X842,500845,000 847,500 850,000 312,5001 2 3 4 5 Middle Hoh ResiliencyProject Fletcher Ranch - DNR Concept Design Canyon C r e e k Spru c e C r e e k Upper H o h R o ad Slumpi n g Cl a y Author: Date: 10/4/2021 Pa th: N:\Pro jec ts\Jefferson County\M idd le Hoh Resi liency Plan\GIS\maps \mxd\Concept_LindnerSC.mxd Lambert conformal conic projection,NAD 1983 State Plane CoordinateSystem(WA North Zone). Parcel Boundaries (Jefferson County Assesor,2020). Aerial(RM 16-24, NAIP2019; RM 24-32 NAIP2017). ¹0 500 1,000Feet ¹0 1 2Miles Legend USGSRiverMiles Parcel Lines Roads(Public andPrivate) APEXJAMS LOWPROFILEJAM EXISTING LOGJAMREINFORCEMENT PROBABLE EXISTINGHARDPOINT RIPARIAN THINNING, PLANTING,CONIFER RELEASE DEFLECTORJAMS PRIVATE PRIVATE PRIVATE PRIVATE PRIVATE PRIVATE PRIVATE STATE O F W A S H I N G T O N D N R STATE O F W A S H I N G T O N D N R STATE O F W A S H I N G T O N D N R THENATURECONS E R V A N C Y THENATURECONSE R V A N C Y THENATURECONSER V A N C Y THENATURECONSE R V A N C Y THENATURE CONSERVANCY STATE O F W A S H I N G T O N D N R STATE O F W A S H I N G T O N D N R PRIVATE PRIVATE PRIVATE PRIVATE PRIVATE PROPOSEDLEGEND FLETCHER RANCH Includes conifer > 75-ft tall RE-ESTABLISH RIPARIAN FLOODPLAIN OVER TIME PLANTING, RIPARIAN THINNING, CONIFER RELEASE LIKELY EXISTING HARD POINT EXISTING LOGJAM REINFORCEMENT PRIMARY PROPOSED ACTIONS 1.Opportunistically release young conifer throughout all alder-dominant floodplains •Increase light & growth rate to accelerate natural forest succession 2.Thin alder-dominant floodplain and plant with conifer •Convert alder-dominant floodplains to mixed to accelerate natural forest succession 3.Identify invasive species presence, treat and monitor •Eradicate existing invasive plants •Monitoring to identify and treat new occurrences 4.Install ELJs and/or reinforce existing logjams along floodplain margins to limit further lateral migration •Limit lateral migration of the main stem channel •Provide deep pools with cover in main stem or channel thread 5.Install ELJs and/or reinforce exiting logjams within the floodplain •further limit lateral migration and avulsion potential •Provide pools and cover along side channels within the floodplain 6.Install ELJs and/or reinforce exiting logjams in the main stem channel to split flow •Provide deep pools with cover in main stem or channel thread •Provide initiation point for forested islands to develop in lee Air photo background collected March 2021; LiDAR hillshade 2013/14 ELJs to prevent main stem channel impinging on exposed clay Plant new deposits/surfaces as floodplain developed over time, monitor for invasive species colonization 4 4 3, 5, 6 4 Hoh River1, 2, 3, 5 1, 2, 3, 5 4Plant to restore riparian floodplain buffer, monitor for invasive species colonization 1, 2, 3, 5 6 6 6 6 Plant new deposits/surfaces as floodplain developed over time 6 4 1, 2, 3, 5