Loading...
HomeMy WebLinkAboutManagers Report JCPRAB 04062022 New line around the perimeter of the infield to keep water from being sprayed on the infield and irrigate the area better. In the heat of summer this field requires about 1,000,000 gallons of water a month, around $8,000. These repairs will reduce the water and increase the quality of the field. Faulty valves repaired New timer/controller, once we get Internet/WiFi we will add a rain gauge and weather station so staff can get up to the minute info and adjust the irrigation from on an app on their phones, saving time and water. This excellent company is doing the irrigation renovation for $17,417 The back of this machine installs irrigation pipe without digging. They didn’t use the trencher in the front of it. The most important part of the project was digging up 92 irrigation heads, raising them to the right height, putting new nozzles in them to save water, and installing these adjustable joints which enable them to be adjusted to the right height easily in the future. HJ Carroll Restroom, office, and concession stand building with roof repairs. Rather than replace the whole roof we had these sky lights replaced, and the entire roof refastened, we will get 20 more years for ¼ cost of a new roof. This project was $7,100 List of Capital Projects 2022-2023 Project Value Status HJ Carroll Irrigation Renovation $50,000 HJ done for $18,000 Irondale Community Irrigation Renovation Shared with above Fall of 2022 HJ Carroll Restroom Roof Repairs $10,000 Done for $7,500 Quincy St Fence and Gates at Memorial Field $60,000 Permitting in progress Oak Bay Caretakers Site $30,000 Design in progress Indian Island Picnic Shelter Replacement $40,000 Hold East Beach Park Renovation $30,000 Hold HJ Carroll Salmon Shelter ADA Access Update $10,000 Contracted. Work in summer 2022 HJ Basketball Court Surfacing, Improve Goals $20,000 Out to bid. Work in fall 2022. JUMP! Playground 1,900,000 Contracting in progress, construction in summer $2,150,000 Park Maintenance and Operations Staff  Lamont Thornton, Parks Maintenance 1, full time, year round permanent position  Michael Goodwin, Parks Maintenance 1, full time, seasonal position  Part time (2 days week), year round – open, no viable candidates at this time  Oak Bay Camphost – open, no viable candidates at this time  HJ Carroll Caretaker – opens on June 18, advertising now Equipment  Investigating robotic mowers and athletic field line painters  Purchasing third zero-turn mower  Need two trucks, they are unavailable until late fall 2022, or early 2023 Campgrounds  Very good condition, operating with LTAC Funds  Opened April 1  New partnership with JCSO for supervision – very exciting improvement  Enhanced supervision plan by all staff members  Manager does supervision 12 hours/week from April – Oct Events  A marked increase in reservation at HJ Carroll – many for outdoor classrooms, fitness classes, meetings, family gatherings that were postponed, weddings that were postponed  8 High school soccer games this spring  6 North Peninsula Football Club (soccer) Mens-semi pro soccer team games and many practices at Memorial Field Trails  Maple syrup trail, new bike only trail opening at Gibbs Lake soon – months ahead of schedule. Beautiful trail. Recreation Programs  Record Breaking Spring Soccer Registration o 90+ pre-k players! o 270 total players – most ever!  Successful new wrestling camp done in February, partnership with schools and coaches  New open gyms – PT High School Basketball Gym open game for 8th grade plus! o Partnership with schools and coaches  Port Townsend Cooperative Playschool Partnership open and running!  Free drop in rec – coming back gradually