HomeMy WebLinkAboutInterwest Construction, Inc., Change Order No. 3 - 042522 Sheet c _ DEPARTMENT OF PUBLIC WORKS Change
Date: /18/2022 CHANGE ORDER Order No.
Ordered by County Engineer under terns of
Section 1-04.4 of the Standard Specifications
Contract No.
EiChange proposed by Contractor To:
Interwest Construction,Inc.
or d by: Interwest Construction,Inc. ' 609 North Hill Blvd. --j
Y
Contracts Fran Name ` 3/2- Burlington,WA.98233
f
Signator�s, Dare
1) e- Y�pS!h 4- _W
,
Title
Consent given by Surety:(ivirenrequired) Project Title
SR 116 and Cedar Ave.Ped.-Rite Improvements
By; Project No.1802057
Attorney-in-fact Dale
You arc ordered to perform the following described work upon receipt of an approved copy of this change order:
Item 52 Mitigation for Pedestrian Light Pole installation
This change order adds one new item"Item 52 Mitigation for Pedestrian Light Pole installation,per Each"and per
Standard Specification 1-04.7. The Contractor has claimed that different site conditions have been created by the
installation by the PUD of the Pedestrian Light Poles along Cedar Avenue,which will cause additional work and
delays for the Contracor.The Contractor has agreed that the resulting additional work and delay only applies to
the 14 Pedestrian Light Poles along Cedar Ave.
Estimated cost is:$6,266.40
Change in Contract Time:2 additional Working Days
Total Change Order 3 Summary
$6,266.40 Item 52 Mitigation for premature Pedestrian Light Installation by the PUD
$6,266.40 Total Estimated Net Cost Change
All work materials and measurement to be in accordance with the provisions of the standard specifications and
special provisions for the type of construction involved.
ORIGINAL CURRENT' ES'f[MA'TED ESTIMATED
CONTRACT CONTRACT NET CHANGE CONTRACT'I'OIAL
AMOUNT AMOUNT THIS ORDER Af"I'ER CHANGE
$573,723.61 $576,331.82 $6,266,40 $582,598,22
ORIGINAL CURRENT CONTRACT TIME NEW CONTRACT
CONTRACT TIME CONTRACT TIME CHANGE(Add/Del) TIME
75 Working Days 77 Working Days 2 Working Days 79 Working days
j APPROVAL RECOMMENDED APPR( AL RECO NDIiD
l)c (
41
4A16
Praje Manager Date County En ineer Date
PROVAIi..RECItbMMENDED
0 APPR ED
ill*al—
'((2-5-.&_
Engineering Servils.Ma►rager Date Chair,Jefferson County Commissioners Date
•
' I 3
N1M 1 8• .0 Oa ,C VC
oil 1 I i I N P• N N
III 1 L) Ep• 4D 4p
t 1 I 1 E/?! 6A Y3
i
f _ 1, f 1 H, Ili O. O L,
I1 {' I� 7 o d•, E^
i p0 o a O
� F I N, CDN F
1 I i Q f �I W
V
I
1
r
4 ICI F 1 s S
I 1 U
'z Ol d-1 �, vi
1 1 #Fr i z
I� > i A
W
I I h
f3€F J �I
f W17.1 IN# N N ;..r
z jy ( 7' d• 7; E-•
;
W
i 1 .
1 €
p . t i 1 1 1 t i
z I 1 {F" '
151 v` L1 1w11 1' Q 1 W W W'
V. 1z W 1
«. £ g '- ,2
I I
7 1
z l� i o` o of
of o 0
!
1F ,
I co coa a>,
-u_ I ry '
E S
an! Uf
_ 1 ;FIJ Or co O,
o; O O'
OI ICI t O! a o
II 1 W ! X ' &9. col En 1
E.*
i
O# �j zIr Qf Q �'
7 _
O10 W
Q . O
�1 E 0 `.rWh j i z i a., q�,
Qa 1
i t-. t. b0
0. I Q j 1 12 1 ! I w ._] ,..]
W1 !J1 1 0 0 Z1 ❑ Q
ig:li ►�"" ? O •a .oj •ooz:— o 1
j , ,
• a ; .0 c ctlY _ �
2 a 5: 2 a 5 I
I N ( I R 1 ._..
O I 1 ; y !
N a
1
_ a O! , Qi
1 7 10 (51 t N F
°1 I 1 I 0a
N f 1 1 WI (
o r"{
4
o. iii IO: �i (1I
am j , ! � I I 7.i W vi. , ,
Department of Public Works
O Consent Agenda
Page 1 of 1
Jefferson County
Board of Commissioners
Agenda Request
To: Board of Commissioners
Mark McCauley, County Administrator
From: Monte Reinders, P.E., Public Works Director/County Engineev�
k.
Agenda Date: April 25, 2022
Subject: Change Orders No. 2, 3, and 4, for SR 116 and Cedar Avenue
Pedestrian - Bike Improvements Project, Project No. 1802057,
County Road No. 637109, WSDOT Project No. HLP-SR19(006)
Statement of Issue: Change Orders No. 2, 3, and 4 with Interwest Construction, Inc.
of Burlington, Washington.
Analysis/Strategic Goals/Pro's Et Con's: These change orders consist of:
Change Order No. 2: Substitution of Crushed Surfacing Top Course for all occurrences
of Crushed Surfacing Base Course in order to improve the constructability methods for
this project.
Change Order No. 3: Changed condition for constructing concrete sidewalk adjacent
to the installed Pedestrian Light Poles along Cedar Avenue.
Change Order No. 4: Removal of 2 utility poles that conflict with the proposed
concrete sidewalk.
Fiscal Impact/Cost Benefit Analysis: Change Order No. 2 adds no ($0.00) additional
cost or Working Days. Change Order No. 3 adds $6,266.40 and 2 Working Days.
Change Order No. 4 adds $1,075.02 and1 Working Day. The total cost increase for
all 3 change orders is $7,341.42. This project is funded at 100% by a WSDOT Safe
Route to School Program (State) grant.
Recommendation: Public Works recommends that the Board authorize Change Orders
No. 2, 3, and 4 with Interwest Construction, Inc., and return two originals of each to
Public Works for further processing.
Department Contact: John Wayand, Project Manager, 385-9377.
Revie !aCountnistrato '
By: %,
Mark r Date