HomeMy WebLinkAboutSummary of Changes to PROS Plan for June 1, 2022 JCPRAPSummary of Major Changes to the 2015 PROS Plan Preliminary Rough Draft
JCPRAB June 1, 2022 Version
Introduction
This is a preliminary working draft. Input, edits, and suggestions are wanted at this time.
This version has been extensively updated by Matt Tyler. It was reviewed by Eric Kuzma, Engineering
Services Manager & Assistant Public Works Director, as well as by John Flemming, Engineer 3 (primarily
for trails information).
The JCPRAB has been sent a .pdf that does not show changes to the 2015 plan. However, upon request,
a version that shows all changes, and the original version are available.
The overall goals of this update are:
Support future RCO grants,
Simplify the existing plan,
Update the existing plan with new information in a timely manner using available resources, and
Include more info about non-motorized trails.
Major Updates
All pertinent public outreach/input, demographic, inventory, and other information updated.
Many edits for clarity.
Chapter 6 “Recommendation/Action Plan” was removed because it is largely redundant to
Chapter 5, and contained mostly outdated strategic planning information pertaining to how
individual parks would be maintained (volunteer vs professional), how rec programs would be
operated.
Detailed legal information about how various park districts work, and sources of funding have
been deleted because it may have changed and is not necessary to reproduce in the actual plan.
Instead the location of the information on-line is provided.
The survey completed by the ERPRC in 2011 is left in.
Old CIP removed, all new CIP inserted
The actual ERPRC report is deleted, but referred to where it can be found on-line.
Appendix A, Park and Facility Descriptions is deleted because it is out of date and too detailed.
Additional multi-use trail information added, especially regarding the Tri-Area active
transportation network and the ODT.
Additional information was added about specific projects such as the Quilcene Arts and History
Trail, land banking property near Chimacum Park, replacement of playgrounds; and the need for
activity specific amenities such as athletic fields, mountain bike trails, and pickle ball courts etc.
Presentation
The plan will be presented by Matt Tyler in a power point that provides additional detail and a
chance for input.
Schedule
13-May-22 1 2 3 4 5 6 7 8 9
March April May June Jul August Sept Oct Nov
Start 18-Mar
Updating
Preliminary rough draft complete 18-Apr
First proofreading by admin 18-Apr
First draft for PW review 25-Apr
Edits back to Matt for further updating 1-May
Updating
Send to JCPRAB 13-May
First Review by JCPRAB as New Business in Meeting 1-Jun
Updating and Detailed Formatting
PW Staff Second Review 1-Jul
Produce Final Draft
Final Draft Complete 3-Aug
Approval by JCPRAB 3-Aug
Public Hearing 19-Sep
Second Hearing and Adoption 17-Oct
Certify and Transmit to RCO X
DRAFT Parks, Rec, Open Space, and Trails Comprehensive Plan Update Schedule