Loading...
HomeMy WebLinkAboutstamped_001 Pre-application Materials PRE21-00010 Pre-Application Conference Non-Conforming Expansion of existing resort County Attendees: Shannen Cartmel – Lead Associate Planner, Austin Watkins – Interim Director, Jeff Monroe – Plans Examiner, John Fleming – PW, Tom Aumock - Consulting International Fire Code Inspector & Plans Examiner, Brian Tracer – Fire Marshal EJFR Time and Date: May 13, 2021 at 10:00 AM Applicant: Andrew Nordstrom Representatives: Tori Masterson and John Sampson, Hoedemaker Pfeiffer LLC Other Team Attendees: Todd Hulbert and Dave Pitkethly, Hulbert Custom Construction; Brian Gregory, Allworth Design; Ann Boeholt, Soundview Consultants; Tracy Gudgel, Zenovic & Associates Site Location: Parcel number 921084010, 921084011, 921084029; 10 Beach Drive, Nordland, WA 98358 Zoning: Rural Residential 1:5 Approximate Size of Site: 8.9 acres Description of Proposal: Renovation and improvement of beachfront cottages and amenity spaces of nonconforming rural recreational lodging resort. The proposal includes the addition of a commercial kitchen, gathering area, and tent or RV campsites. The Jefferson County Code is available on-line at: http://www.codepublishing.com/WA/JeffersonCounty/ Permitting Path: The applicant will need to get several permits for this proposal, which includes land use (CUP) and shoreline permits, septic permits, and building permits. Jefferson County Community Development (DCD) recommends that the applicant apply for land use and shoreline permits, followed by septic permits, and then building permits. The only requirement of this is that the septic permit must be applied for prior to the submittal of the building permit applications. The building permits will not be approved until the septic permit has approval. Applying for the land use/shoreline and septic permits within the same time frame allows the applicant to address any outstanding requirements requested for each permit and navigate any permitting issues that may arise during review, while still allowing review of all the other permits to continue. The applicant may also desire to apply for the building permit at the same time as the land use/shoreline and septic permit applications; however, this is at the risk of the applicant the building permits cannot be approved until the land use/shoreline and septic permitting is complete. Revision may be required to the building permits to comply with land use/shoreline and septic permits. The exception to this permitting path is for cabins 5, 6, and 7. These buildings are in current violation and must have a new septic system approved, functional and finaled prior to any approval for building permits being granted. ENVIRONMENTAL HEALTH – Linda Atkins – 360-385-4403 or latkins@co.jefferson.wa.us. Unable to attend meeting. For all septic/EH questions please contact Linda directly. Exhibit 1 - Page 1 of 80 AGENDA for Meeting: Consulting International Fire Code Inspector & Plans Examiner - Tom Aumock Plans Examiner – Jeff Monroe East Jefferson Fire and Rescue Fire Marshal – Brian Tracer. Provided DCD with road standards to allow fire truck access and proper turn around space if unavailable for meeting. PUBLIC WORKS – John Fleming (360) 385-9168 or jfleming@co.jefferson.wa.us • This is a commercial project and requires review by the Jefferson County Department of Public Works for Stormwater Management proposals. This includes new review of unpermitted structures and the stormwater management must be consistent with the most current addition of the Western Washington Stormwater Management Manual. DEVELOPMENT REVIEW DIVISION – Shannen Cartmel (360) 379-4454 or scartmel@co.jefferson.wa.us Land Use Permitting Option 1: Expansion of non-conforming use (JCC 18.20.260(1)(c)): • Conditional Use discretionary (C(d)) Type two permitting path for expansions greater than 10%. ▪ State Environmental Policy Act (SEPA) review required ▪ Requires Public Notice to all property owners within 300 feet of the property, in the paper of record, all applicable agencies, and at the site. 14 – day notice period to be combined with SEPA review notice. ▪ This process is usually administrative, but has the potential to go to a public hearing with a decision being made by the Jefferson County Hearing Examiner. ▪ The proposal must meet the following: ▪ The proposed area for expansion is contiguous to the nonconforming use. ▪ The area for expansion of use complies with all applicable bulk and dimensional standards, performance provisions, and environmental and shoreline regulations. ▪ The are for expansion shall not increase the land area devoted to the nonconforming use by more than 100 percent of that use at the effective date of the nonconformance. ▪ The expansion shall not be granted if it would result in a significant increase in the intensity of the use of the nonconformity. ▪ Must meet all conditional use permit criteria outlined in JCC 18.40 Article VIII. See JCC 18.40.530: • (1) The county may approve or approve with modifications an application for a conditional use permit (i.e., uses listed in Table 3-1 in JCC 18.15.040 as “C(a),” “C(d)” or “C”) if all of the following criteria are satisfied: o (a) The conditional use is harmonious and appropriate in design, character and appearance with the existing or intended character and quality of development in the vicinity of the subject property and with the physical characteristics of the subject property; o (b) The conditional use will be served by adequate infrastructure including roads, fire protection, water, wastewater disposal, and stormwater control; o (c) The conditional use will not be materially detrimental to uses or property in the vicinity of the subject parcel; Exhibit 1 - Page 2 of 80 o (d) The conditional use will not introduce noise, smoke, dust, fumes, vibrations, odors, or other conditions or which unreasonably impact existing uses in the vicinity of the subject parcel; o (e) The location, size, and height of buildings, structures, walls and fences, and screening vegetation for the conditional use will not unreasonably interfere with allowable development or use of neighboring properties; o (f) The pedestrian and vehicular traffic associated with the conditional use will not be hazardous to existing and anticipated traffic in the vicinity of the subject parcel; o (g) The conditional use complies with all other applicable criteria and standards of this title and any other applicable provisions of the Jefferson County Code or state law; and more specifically, conforms to the standards contained in Chapters 18.20 and 18.30 JCC; o (h) The proposed conditional use will not result in the siting of an incompatible use adjacent to an airport or airfield; o (i) The conditional use will not cause significant adverse impacts on the human or natural environments that cannot be mitigated through conditions of approval; o (j) The conditional use has merit and value for the community as a whole; o (k) The conditional use is consistent with all relevant goals and policies of the Jefferson County Comprehensive Plan; and o (l) The public interest suffers no substantial detrimental effect. Consideration shall be given to the cumulative effect of similar actions in the area. • (2) In instances where all of the above findings cannot be made, the application shall be denied. • Expansion of nonconforming structures must comply with JCC 18.20.260(2) and (3). Option 2: Conditional Use Permit to Establish a conforming use (JCC18.20.350(9) and (10)): • Conditional use (C) type III (hearing examiner) permitting path with variance to parcel size requirement ▪ SEPA review required ▪ Small Scale Tourist and Recreational Use with recreational overnight cabins/conference or retreat center and a rural restaurant. To add an RV and tent camping, a variance from the typical small-scale and recreational criteria regulating only one small scale or recreational use per legal tax parcel. See JCC 18.20.350(3)(c). Further, a variance would be required from the SSRT performance standards, which require that the size of the recreational cabins/conference center be at least 10 acres in size. See JCC 18.20.350(9)(a). The variances would be combined with the conditional use type three permit hearing. ▪ Requires Public Notice to all property owners within 300 feet of the property, in the paper of record, all applicable agencies, and at the site. 14 – day notice period to be combined with SEPA review notice. ▪ Requires a public hearing with the Jefferson County Hearing Examiner (notice of the hearing is published at least 10 days prior to the hearing) ▪ Would create a conforming use that allows for easier expansion in the future. ▪ Must meet all conditional use permit criteria outlined in JCC 18.40 Article VIII. ▪ Must meet all variance permit criteria outlined in JCC 18.40 Article IX. Exhibit 1 - Page 3 of 80 o A variance may be granted only if the applicant demonstrates all of the following: o (1) The variance will not constitute a grant of special privilege inconsistent with the limitation upon uses of other properties in the vicinity and land use district in which the subject property is located; o (2) The variance is necessary because of special circumstances relating to the size, shape, topography, location or surroundings of the subject property, to provide it with use rights and privileges permitted to other properties in the vicinity and in the land use district in which the subject property is located; o (3) The granting of the variance will not be materially detrimental to the public welfare or injurious to the property or improvements in the vicinity and land use district in which the subject property is located; o (4) The special circumstances of the subject property make the strict enforcement of the provisions of this code an unnecessary hardship to the property owner; o (5) The special circumstances are not the result of the actions of the applicant; and o (6) The variance is consistent with the purposes and intent of this Unified Development Code. ▪ Must meet the all the applicable criteria under JCC 18.20.350. Some important ones are highlighted below: ▪ The minimum parcel size must be 10 acres (see above variance path to approval with the 8.9 acres). ▪ Can have 15 built cabins or bedrooms for overnight lodging comprising up to 6,000 square feet of gross floor area. ▪ Lodging operators may not allow any person to occupy overnight lodging on the premises for more than three months in any year. ▪ New residential development not permitted (including sale of land for year-round or second-home residential housing that is owner-occupied or rented) ▪ An on-site caretaker or manager’s residence is allowed. ▪ Can also apply for a rural restaurant which is allowed as a small -scale recreational and tourist use subject to the following: • Only when associated with and subordinate to a primary recreational or tourist use. • Indoor dining facilities shall not exceed a total of 50 seats, including outdoor seating. • The structure cannot constitute no greater than 5,000 square feet of gross floor area. • Drive-through food service is prohibited but does not include an espresso stand. • This can be applied for in conjunction with the Type III or later down the road as a Conditional Use Discretionary (C(d)) type II permit. Codes and regulations for RV Parks and commercial campgrounds (if desired) –Glamping would likely be considered a RV park and/or commercial campground. This is a requirement for either option of permitting the use. This approval would be combined with the other SSRT uses and type III permit. ▪ Recreational Vehicle (RV) Park or Commercial Campground requirements: • The minimum parcel area for the RV park/commercial campground shall be five acres. Exhibit 1 - Page 4 of 80 • Cannot exceed 60 spaces. • RVs can only be located in an approved RV space and are limited to one per space. • Temporary occupancy not to exceed nine months. • The minimum width for the parcel shall be 300 feet. • No storage of heavy equipment. • No home or business can be operated from the park. • A responsible caretaker, owner or manager shall be placed in charge of any RV/campground park to keep grounds, facilities and equipment in a clean, orderly, and sanitary condition and will answer to the owner for any violation of any provisions of the Jefferson County Code or any other ordinance. • Allowable accessory uses and improvements (subject to individual permitting requirements) may include facilities for: o Picnicking, boating, fishing, swimming, outdoor games, miniature golf courses, mechanical amusements, and other sports and activities. • A buffer area shall be provided within all boundaries of 100 feet in depth within all common property boundaries or public streets. • No RV or camp site may be located within a buffer area. • No building or structure may be erected or placed within a buffer area. • No refuse disposal area shall e located within a buffer area. • No plant materials may be deposited or removed within a buffer area except as a part of recognize landscaping scheme or except for emergency access. • Only roads which cross the buffer, are as close to right angles as practicable an connect directly with the road system contained within the remainder of the park shall be permitted within a buffer area; no road shall traverse the buffer area and give direct access form any public road to any RV space or camp site. • The road system shall comply with the standards and specifications for roads pursuant to JCC 18.30 and any fire related access requirements. • Adequate off-street parking shall be provided. • Each RV space shall have sufficient unobstructed access to or frontage on, an RV park road, so as to permit the movement of RVs. • No structural addition to any RV shall be permitted. • All utilities, including electrical power and telephone lines, shall be installed underground • All roads, walkways, grouped-bay parking and service areas shall be provided with lighting adequate to ensure the safety of vehicular and pedestrian traffic. • Adequately sized wastewater disposal facilities shall be required and must be approved by the Jefferson County environmental health department. • Any other criterion applicable from any of Jefferson County Codes or ordinances, and any state or federal regulations. Shoreline Permitting: Chapter 18.25 JCC • The site consists of Natural Shoreline and Shoreline Residential Designations. • Septic systems and associated components are prohibited within the Natural Shoreline designation, but a Shoreline Conditional Use C(d) permit in Shoreline Residential designation. • Development in shoreline jurisdiction means: “a use consisting of the construction or exterior alteration of structures; dredging; drilling; dumping; filling; removal of any sand, gravel, or minerals; bulkheading; driving of piling; placing of obstructions; or any project of a permanent or temporary Exhibit 1 - Page 5 of 80 nature which interferes with the normal public use of the surface of the waters overlying lands subject to this program at any state of water level.” This includes any utility components as well. (JCC 18.25.100(4)(g)). • Any waterward development within the 150’ buffer and 10’ building setback, including decks, patios, staircases, additions, utility components or other similar projects, requires a Shoreline Variance. o The shoreline variance requires a 30-day public notice to all property owners within 300 feet, the paper of record, any applicable agencies, and at the project site. o Jefferson County makes preliminary approval and recommendations to Washington State Department of Ecology (ECY), who makes the final approval. Jefferson County’s decision for the variance is made by the Jefferson County hearing examiner. Approval for these additions from Department of Ecology is rare. o Due to the commercial scale of this proposal, any waterward development within the 150’ buffer will be subject to a SSDP, which is a type III decision made by the Jefferson County hearing examiner. The decision is then noticed to ECY and the Attorney General’s Office. • Any lateral development within the 150’ buffer and the 10’ building setback, including any of the above - mentioned projects, would be processed as a Shoreline Conditional Use (discretionary) permit. • A shoreline substantial development permit (SSDP) will likely be required unless it is exempt under JCC 18.25.560. A SSDP is a Type III permit (hearing examiner). • The land use and shoreline permitting can be combined into one permitting process. However, the shoreline permitting (variance or conditional use) must be approved be ECY after local approval. • OWHM will need to be mapped based upon the wetland delineation from the estuary. • Land use, building, septic permit applications are not vested to the SMP. See JCC 18.40.320. Jefferson County is in the process of reviewing and updating its SMP. If any changes are made to the SMP which affect this project, then new SMP would apply (unless the permit has been issued). • Habitat management plan will be required due to work within 160 feet buffer/setback. Critical Areas: Chapter 18.22 JCC • Mapped Critical Areas: o Wetlands – any permitting or new development will require a wetland delineation. The wetland may have changed based upon the new bridge construction and estuary. OHWM o FEMA Flood Zone AE. Any update or remodel to any structures within this mapped area must comply with current FEMA regulations. FEMA regulations are federal and due not vest to any date of application. JCC 15.15 lays out FEMA requirements. ▪ Biological opinion will be required due to flood zone in the shoreline. o Seismic Hazard Mapped on property – expansion of any structures or placement of new structures, septic or other utility components will require a geotechnical report prepared by a qualified professional with a state stamp that addresses 18.22 JCC and supports proposed development. The applicant will also be required to record a notice to title for this report. o High-Risk SIPZ mapped on portion of the parcel. ▪ This requires all wells be decommissioned and public water supply be brought to the parcels. Other criteria located in JCC 18.22 Article III. o SARPA and SARPA + SUSC Critical Aquifer Recharge Area mapped on parcel. ▪ SARPA + SUSC – is a nitrogen BMP area and the septic system must meet all nitrogen BMP requirements in JCC 18.22 Article III and JCC 18.30.180. Your septic designer should be familiar with these requirements. Other important information: Exhibit 1 - Page 6 of 80 o Land use approval and shoreline approvals can be processed together. In instances where public notices are required or other processes and approvals are different, if the processes are combined, the more stringent requirement applies. For example, the 30-day notice period for shoreline would be required over the 14-day notice period for the conditional use permit. o It is likely that the land use/shoreline permitting will be a Type III public hearing (hearing examiner). The highest permit type require will bring the other permits into a public hearing. If the highest permit type is the Type II CUP (discretionary), the Unified Development Code Administrator will decide if the entire permit should be heard by the Hearing Examiner (Type III) based upon JCC 18.40.520(2). o Any buildings that have been built or expanded without permits (that were likely built after permits were required) will require Built-Without-Permit (BWOP) building permits. SEPA: • State Environmental Policy Act (SEPA) is required. There are no SEPA exemptions that apply to this proposal. • SEPA checklist is located here: https://ecology.wa.gov/DOE/files/d7/d7373ce2-12cb-4fd2-a0e1- 1d25557ac187.pdf. • SEPA guidance is located here: https://ecology.wa.gov/Regulations-Permits/SEPA/Environmental- review/SEPA-guidance. • SEPA handbook is here: https://ecology.wa.gov/DOE/files/4c/4c9fec2b-5e6f-44b5-bf13- b253e72a4ea1.pdf • Questions on the SEPA checklist need to be answered thoroughly. Additional Questions Proposed by applicant: • What is timeline/process for the Conditional Use Permit? o It is dependent on staff availability and case load of the department at the time of submittal. Any land use approval has a 28-day window to be deemed complete. Once this occurs, DCD can still request additional information if required. o The notice of application period will be either 14 or 30 days. o The staff will make sure all comments are addressed, request potential additional information and begin preparing the staff report. o SEPA determination will be made and require the appropriate appeal timelines either prior to public hearing or administrative approval. o The permit is subject to several appeal periods depending on path forward. o Shoreline permits that go to department of ecology have a 10-day appeal period after Jefferson County’s preliminary decision. Once the 10 days is up DCD then sends to ECY. Then they generally review within 30 days followed by an appeal period that does not allow any construction until it has been completed. o Land use/shoreline permitting is typically at least 6 months, if not longer. • Which cabins can be over the counter permits (minor remodels – no additional bedrooms or structural changes) o Cabin 1 o Cabin 7 o Cabin 8 o Cabin 9 ▪ None. All permits will require plan examiners review and full building permits due to the commercial nature of the proposal and the unknown status of some of the buildings. • What is the permitting timeline for remodels? Exhibit 1 - Page 7 of 80 o The currant permit estimate is 10-12 weeks. However, as a commercial project, some of the plans may be reviewed by an outside consultant and could take substantially longer. These approvals will also be reliant on land use approval, shoreline approval, septic approval, and water approval that all have very different timelines. • Water connection a. Process, timeline, etc. o The applicant must decommission all wells on the property and apply for public water source. Per Environmental Health, well drillers are 3-4 months out, it is recommended that you get started looking at options for this process. As far as connection to Jefferson PUD water, it is their timeline for approval. Contact Jefferson County PUD. For questions regarding the potable water approval and well decommissioning from County review, please contact Susan Porto at 360-385- 9904 or sporto@co.jefferson.wa.us. • What are the limitations with Glamping on the property and does adding the temporary structures fall under Jefferson County Code sections dealing with nonconforming uses and structures (JCC 18.20.260) o Define Glamping? RV’s? Tents? o a. There are both non-conforming uses and structures – Section 3 of JCC 18.20.260 applies to the subject property. o Correct depending on permitting path desired as described above. o b. If the use and/or the structures are expanded, does a UDC Type permit approval allow for the type of expansion requested? ▪ See above. Once the land use is approved, building permits for expansions can easily be approved if in compliance with conditions of approval for the use. Buildings are each individually subject to critical areas and individual approval, especially if they were built without permits. o c. Can seasonal platforms be built to allow for glamping tents? ▪ Yes. As long as the tents are an approved use for the land use regulations. • Parking: o What are the parking requirements for a site like this? Is there are minimum num ber of parking stalls required? Can the guest parking be separated from the cabins and centrally located outside the shoreline area? ▪ Subject to JCC 18.30 standards. ▪ Parking for physically handicapped needs shall be provided consistent with state standards at a rate of not less than two percent of the total number of parking spaces, or a minimum of one parking space, whichever is greater. ▪ Yes, the parking can be located in one central area. ▪ Parking standards are determined by JCC 18.30.100. Based upon this use, it is likely that the parking will be determined by the UDC Administrator. ITE parking standards are typically used as the guideline. • Trees: o There are trees on the site that we would like to consider for removal. Some of the most common issues are: o Trees that are dead or dying or in a state of decay near structures, public spaces or public roads. Previously topped trees ▪ Tree alterations are subject to a separate tree removal permit. Depending on the location of the tree and the critical areas it is within, different requirements can be present. The geotechnical report needs to address the proposals as far as stability, if in the wetland, the wetland biologist needs to address. All tree alterations or removals require an arborist report detailing the health of each tree proposed to be either removed or trimmed and the methods that will be used for doing so. • Invasive Plant Mitigation: Exhibit 1 - Page 8 of 80 o Would removal of non-native invasive plants be considered ‘clearing and grading’ if replanting with site appropriate native plants is to take place in these areas? ▪ It is dependent on the location of the invasive plants. In mitigation, removal of invasive plants is sometimes a method to achieve required levels of mitigation. Generally, the strict removal of non-native plants like Himalayan blackberry and others – you will need to work with your biologist to determine that they are in-fact invasive, would not be considered clearing and grading. This does not apply to any trees. It would be considered grading if you are leveling the ground you remove the plants from. • Shoreline Setback: o How is removal of crushed rock areas in the shoreline setback viewed if these areas are returned to native planting? Would this be considered ‘clearing and grading’? ▪ Removal is good. Restoration is key and highly preferred. I recommend this be part of mitigation that may be required. o Can native planting take place in the shoreline setback without permit review? ▪ It is preferably reviewed with the shoreline applications. This will allow you to use these instances as mitigation if needed. o Permitting requirements for trenching utilities in the shoreline? ▪ Covered above. Requires shoreline review and permitting. No exemption for utilities. It is considered development. It is subject to the shoreline management plan and act. Also the SSDP process as utilities aren’t exempt from commercial operations. Application & Fees Estimate: • Complete Application CUP (C(d)) and (C): o Permit Application o Conditional Use Permit Form o A narrative statement substantiating how the proposed development meets all applicable criteria. For example, conditional use permit criteria, nonconforming expansion criteria, variance criteria, small-scale tourist and recreational use criteria and any other applicable sections. o SEPA Checklist pertaining to entire development proposal. o Geotechnical Report o Engineered Stormwater Report o Wetland Delineation o Site Plan (must show Ordinary High Watermark – OHWM). Must also have all applicable criteria from the Jefferson County Site Plan checklist. Must also show any delineated wetlands. o Additional Information if required. The administrator’s determination of completeness shall not preclude the administrator from requiring additional information. (JCC18.40.110 (6)). • Complete Application for Shoreline Development: o Permit Application o Shoreline Supplemental Application o Site Plan (must show Ordinary High Watermark – OHWM). Must also have all applicable criteria from the Jefferson County Site Plan checklist. Must also show any delineated wetlands. o If requesting a conditional use permit, a variance or a SSDP, must have a habitat management plan with mitigation. o Biological opinion due to flood zone. o Additional Information if required. The administrator’s determination of completeness shall not preclude the administrator from requiring additional information. (JCC18.40.110 (6)). Exhibit 1 - Page 9 of 80 • Fees due at time of preliminary application: • Conditional Use Permit C(d): ▪ $1552.00 Base fee (DCD will invoice at rate of $97.00 per hour, after 16 hours). ▪ $970.00 SEPA ▪ $149.00 Notice of SEPA/Application ▪ $12.00 Notice Board ▪ $24.00 Scanning Fee ▪ $722.00 Public Works Base fees (PW will invoice for work over 8 hours of review at a rate per approved fee schedule depending on reviewer) ▪ $171.45 Tech Fee ▪ $3600.45 Total • *potentially subject to hearing examiner fee of $1298.44 if the decision gets pushed from administrative. This will also include additional fees for notice of hearing, and a 5% technology fee. • Conditional Use (C) with or without variance (extra hours will be billed) ▪ $2,231.00 Base fee (DCD will invoice at rate of 97.00 per hour, after 23 hours) ▪ $970.00 SEPA ▪ $149.00 Notice of SEPA/Application ▪ $12.00 Notice Board ▪ $24.00 Scanning Fee ▪ $722.00 Public Work Base fees (PW will invoice for work over 8 hours of review at a rate per approved fee schedule depending on reviewer) ▪ $149.00 Notice of Hearing ▪ $1298.44 Hearing Examiner ▪ $277.77 Five percent technology fee ▪ $5833.21 Total fee due at time of submittal • Shoreline Exemption ▪ $679.00 base fee ▪ $24.00 Scanning fee ▪ $35.15 Five percent technology fee ▪ $738.15 total • Can be combined with individual building permits, a standalone permit for all shoreline exemption work, or in conjunction with any CUP/Variance permit. Would be required for CUP/Variance if this is the resultant proposal. • Shoreline Conditional Use or Variance with or without SSDP: ▪ $2425.00 (DCD will invoice at rate of 97.00 after 25 hours) ▪ $149.00 Notice of Application ▪ $12.00 Notice Board ▪ $24.00 Scanning Fee ▪ $149.00 Notice of Hearing ▪ $1298.44 Hearing Examiner ▪ $202.87 five percent tech fee ▪ $4260.31 total due at submittal • Additional DCD fees may also include: SEPA review and other appropriate fees if applicable after the pre-application conference. Fees are based on 2021 fee schedule and are subject change. • Contact our reception desk for an appointment for intake at 360.379.4450. Exhibit 1 - Page 10 of 80 • Recording fees, property taxes must be paid for the current year per JCC18.35.140(5) and RCW84.56.345. JCC 18.40.090(5) Assurances Unavailable. It is impossible for the conference to be an exhaustive review of all potential issues. The discussions at the conference or the information provided by the administrator shall not bind or prohibit the county’s future application or enforcement of all applicable laws and regulations. No statements or assurance s made by county representatives shall in any way relieve the applicant of his or her duty to submit an application consistent with all relevant requirements of county, state and federal codes, laws, regulations and land use plans. Pre-applications do not vest any portion of the development proposal. The applicant should read and understand all applicable statues, regulations, and rules. Exhibit 1 - Page 11 of 80 Thomas L. Aumock Consulting Fire Code Inspector & Plans Examiner Jefferson County Department of Community Development 2303 Hendricks Street, Port Townsend, WA 98368 Office : (360) 385-3938 Email: taumock@cablespeed.com Cell : (360) 643-0272 MEMORANDUM To: Joel Peterson, Associate Planner, Jefferson Co. Department of Community Development Fr: Thomas L. Aumock, Consulting Fire Code Inspector & Plans Examiner Dt: 29 April 2021 Re: PRE21-0009 Blake Lodge, 10 Beach Drive, Marrowstone Is., A.P.N. 92108 4011,4012, and 4029 I am in receipt of the above-referenced paperwork as a pre-application for proposed facility improvements to an existing shoreline lodge and cabins on Marrowstone Island. The purpose of this review is to provide pre-application guidance on the jurisdiction and on Code standards for proposed services, access roads, and available fire protection water supplies. Cited are excerpts from International Fire Code, 2018 Edition, as amended by Washington Administrative Code 51-41, the International Mechanical Code, N.F.P.A 96 et al, and the guideline “Jefferson County Non-public Road/Driveway Design and Construction Standards”. The Jefferson County "ArcGIS" Public Safety Map was used for existing P.U.D fire hydrant and distance data. The Jefferson County Coordinated Water System Plan provides the recommended fire flows, hydrant distances, etc. As noted, a pre-application tele-conference was conducted on this date. Consultants for the project, Hoedemaker Pfeifer, provided pre-app questions for the proposed project. The following items pertain to Codes under this plans examiner and Fire Code consultant was requested to review. Item 5, “Lodge-Commercial Kitchen" Requirements: International Fire Code & N.F.P.A. 96, et al. The commercial kitchen was noted to be for the Lodge’s assembly function, whereby, commercial cooking could take place, including catering. A formal permit with detailed drawings is required, and I have attached a detailed paper on the subjects noted below, attached. As such, all the kitchen appliances would be required to have a formal manufacturer's listing or testing certification, including the hood. Next, a formal cooking center exhaust hood would be required. This hood should have a formal manufacturer's listing or testing certification. The hood exhaust system would need to meet Code for the size of the cooking appliances, and its exhaust piping shall meet the requirements for penetration through ceilings, attic, and roof, or sidewalls. The exhaust termination of the exhaust will be required to be separated from any fresh-air intakes on the roof, by Code. Separation methods of appliances from any deep-fat cooking appliance would be required. Manual fuel shut -off for appliances would be required to be accessible. An automatic fire sprinkler system for the hood is required for Code for any commercial cooking hood operation that produces grease-laden vapors. The Codes also require automatic power and fuel shutoffs for automatic fire suppression system activation, with manual reset. A Class K fire extinguisher is required in the kitchen. Exhibit 1 - Page 12 of 80 Any combustible construction wall behind the commercial cooking operation shall be non-combustible, or be protected by a non-combustible shield complying with N.F.P.A 96. The occupancy load limits for the assembly room area will be established by this Fire Code administrator based upon size, seating, standing and table and chairs capability. Item 14. Residential and Lodge Automatic Fire Sprinklers and Fire Detection The Cabins, and the Lodge occupancy levels do not exceed the thresholds for required automatic fire sprinkler systems under the International Fire Code. Therefore, this is an owner option to provide these appliances. It is noted that the Codes do require automatic fire detection devices, and CO 2 devices where applicable. This is based upon the Pre-App submittals. International Mechanical Code Commercial Kitchen Requirements The commercial cooking hood Code requires make -up air for the exhaust system to be approximately 94- 97 percent of the exhaust volume. Make-up air is derived from an approved exterior source, by a formal automatic air supply system, or device, and must be sourced from the kitchen area. Roadway Ingress and Egress For Fire and Life Safety Response The existing roadway layout for the property was reviewed with the International Fire Code Section 503 “building access 150-foot” standard. The existing roadways meet the purpose and intent by allowing efficient emergency services delivery, and the looped roadways are an asset. The condition and capability of the existing roadways have not been determined. The "Rural Access Road/Driveway" Standard is codified under Chapter 18.30 of the Jefferson County Code. Table 6 -1. "Density, Dimension and Open Space Standards" sets the design criteria for a "private road". Note that a "Driveway" is not subject to any design criteria. These standards were initially adopted by ordinance in 2006. It is the Dept. of Community Development's non-codified driveway standards intent to fill that void for "driveway" construction and design standard and provide guidance for I.F.C. Chapter 503 provisions, which were not adopted by the State of Washington. Jeffers on County also did not adopt the appendices of the I.F.C. Jefferson County has adopted the attachment "NON-PUBLIC ROAD/DRIVEWAY DESIGN AND CONSTRUCTION STANDARDS" with the purpose "to assist property owners with responsible design and construction standards for efficient delivery of emergency services to the subject property[s], as well as other services." Thus, it is non-binding as the proposed roadway is on private property. The non-binding “Jefferson County Non-Public Road/Driveway Design and Construction Standards ” therefore act as a “risk management” tool for landowners to evaluate the driveway’s ability to provide efficient emergency services delivery for present and future owners. The proposed roadway will allow efficient emergency services delivery, and the road-end turn-around is especially necessary due to the length of this driveway. Jefferson County Department of Community Development NON-PUBLIC ROAD/DRIVEWAY DESIGN AND CONSTRUCTION STANDARDS The "Rural Access Road/Driveway" Standard is Cod ified under Chapter 18.30 of the Jefferson County Code. Exhibit 1 - Page 13 of 80 Table 6 -1. "Density, Dimension and Open Space Standards" sets the design criteria for a "private road". However, a "Driveway" is not subject to any design criteria. These standards were initially adopted by ordinance in 2006. It is the Dept. of Community Development's intent to fill that "driveway" guidance void and provide guidance for I.F.C. Chapter 503 provisions, which were not adopted by the State of Washington. Jefferson County also did not adopt the appendices of the I.F.C. which have stricter standards for urban areas. The County has the authority to use certain listed UL and ASTM as "referenced standards" in the I.F.C. [Ch. 80] Background from the Washington State Adoption of the 2015 International Fire Code “WAC 51- 54A-0503 Fire Apparatus Access Roads” “Section 503.1 Where required. Fire apparatus access roads shall be provided and maintained in accordance with locally adopted street, road, and access standards. Section 503.1.1 Buildings and facilities, is not adopted. Section 503.1.2 Additional access, is not adopted. Section 503.2 Specifications. This section is not adopted. Section 503.3 Marking. This section is not adopted. Section 503.4 Obstruction of fire apparatus access roads. This section is not adopted.” Applicable Standards • 2018 Edition of the International Fire Code [I.F.C.], Chapter 5, Section 503 “Fire Apparatus Access Roads”, and I.F.C. Appendix D. [Guideline only, not adopted as Code by Jefferson County] • American Association of State Highway and Transportation Officials [A.A.S.H.T.O.] • Washington State Department of Transportation [W.S.D.O.T.] • Less than 100 average daily traffic volume criteria [A.D.T.] • Underwriters Lab 325- as it applies to electric gates and closing appliances rated 600 volts or less. • ASTM F2200 Standard Specification for Automated Vehicular Gate Construction Purpose In the absence of State adoption of portions of Section 503 of the International Fire Code, Jefferson County provides these standards to assist property owners with responsible design and construction standards for efficient delivery of emergency services to the subject property[s], as well as other services. Scope The scope of this policy is for emergency services access provisions on private properties and privately constructed and maintained roadways to at least 150 feet of a significant structure as measured from the rear of that structure. This means a fire truck can park, and deploy firefighters with a minimum 150 -foot length fire h ose from each side of the structure, and meet in the back, but without obstructions. Standards A travel surface should be constructed and maintained according to these standards: • All materials should meet W.S.D.O.T. standard specifications for road construction. • Twenty [20] foot minimum unobstructed width with the following elements. --Minimum finished driving surface width of twelve [12] feet should be provided, and maintained. --Four [4] foot shoulder—each side—is recommended in sloped landscapes, as shoulders provide lateral support of elevated roadway surfaces and provide a safer “operations zone” around parked emergency services vehicles on the roadway. --Brush and landscaping should not impede the sides of the travel surface with a width and height of 14 feet. Exhibit 1 - Page 14 of 80 • Minimum 6-inch ballast or gravel base, which may need to be increased depending upon the suitability of native material, with 2- inch minimum depth of compacted crushed surfacing top course • 2-percent crown slope at the centerline to allow for proper water drainage. • Compaction of the material to a load capacity of 75,000 pounds minimum. • Cut and fill slopes, including ditches, should be designed to provide 2:1 slope gradient. • Any curvature and departures in the roadway should have a minimum 28-foot radius (internal measurement). Apron radii may be located within the existing public way provided the public paved surface width accommodates same. • Maximum grade is 12%, with greater than 12% suggests Fire District approval and/or should be paved. • Gradient change/transitions should be limited to seven [7] percent or less, to accommodate the wheelbase of the fire trucks and the body frame beyond the rear axle. • Driveway approach to any constructed roadway should meet and approved 75 degree to 105 degree approach angle, to include brush clearance for line of sight at any “stop and yield” controlled intersection with a constructed public road, and include an approved paved apron. • An approved address sign with minimum 5-inch numbers should be posted where the driveway intersects with public roadway. Obtain this from the County Dept. of Community Development. • Gates and fences on the roadway are obstacles to efficient emergency services delivery, and create width constrictions. Any such assemblies should be eleven [11] feet in opening width, and should not be locked unless an approved lock-box or key code system is installed. Key code systems must be registered with the JeffCom E-911 Center for the associated dispatching requirements. Gates are not allowed t o be constructed within the public right-of-way, and need to be placed at the property line intersection with the public right-of-way unless approved by the Jefferson County Dept. of Public Works. • Driveway turnarounds for roadways over 250 feet in length s hould be provided, and should be designed using the standards from the 2015 International Fire Code, Appendix D. • Where private roadways are greater than 1,000 feet, owners should provide intermediate turnout[s], and should provide a formal off-highway turnaround at the road entrance to allow vehicles to turnaround without having to back-out onto the public right of way. A recorded document should be executed in cases where property is served over a roadway easement. Such document prescribes the necessary ingress/egress provisions recommended by these standards, and most importantly, should include a maintenance agreement --which includes multiple-party use of a driveway access. Common Question/Responses: 1) What is the minimum distance of opening bet ween gate posts to allow entry by emergency vehicles? Gates and fences on the roadway are obstacles to efficient emergency services delivery, and create width constrictions. Any such assemblies should be eleven [11] feet in opening width, and should not be locked unless an approved lock-box system is installed." "Approval" in this case is by the Operations Chief of the respective Fire & Life Safety Protection agency. 2) How does fire, police, and ambulance services get access to unlocking a gate? Call Jeffcom and register the key code with the dispatcher personnel. 3) How far should a gate be setback from right-of-way? Public roads are within specific right of way widths, thus, road edges, ditches, etc. may have varying setbacks from the legal edge of the right-of -way. The gate is normally not to be placed in a public right- of-way, thus, would be placed on the private property line abutting the right of way. This requirement is likely included in the Jefferson County Road Access Permit for the subject intersection. 4) Who maintains the gate? Exhibit 1 - Page 15 of 80 Maintaining the operation, and upkeep is set by the manufacturer's standards, and is the responsibility of the owner[s], or owner representative. 5) Backup power supply to electric gates, or gates automatically open in power outages. Gates should have a manual override capability, or a back-up power supply. 6) On automatic gates, a means of sensing obstructions in pathway of opening or closing. Automatic gates should have a built in safety feature for sensing closure obstructions. 7) Snow clearance from bottom of gate swing. This is an owner/lessee maintenance issue likely based upon the manufacturer's operation standards Fire and Life Safety Fire Flow Analysis This facility has a “Rural” classification from the “Jefferson County Coordinated Water System Plan". As such, there is no minimum fire flow requirement for this project. The area is served by Jefferson County P.U.D No. 1 public water system. The ArcGIS Public Safety Map for this area does not indicate a fire hydrant in the vicinity of this project. Therefore, fire protection water supply operations would be accomplished through the use of water tender shuttles. It is recommended that the owner consider the installation of a fire hydrant with locating assistance from the Jefferson County P.U.D. No. 1. Exhibit 1 - Page 16 of 80 Scan the QR code to access the digital form. DEPARTMENT OF COMMUNITY DEVELOPMENT 621 Sheridan Street, Port Townsend, WA 98368 Tel: 360.379.4450 | Fax: 360.379.4451 Web: www.co.jefferson.wa.us/communitydevelopment E-mail: dcd@co.jefferson.wa.us PRE-APPLICATION CONFERENCE Purpose The purpose of the pre-application process is to ensure consistency with the applicable sections of JCC Title 18. Process 1. Submit an application for a pre-application conference with the required items below. 2. Once submitted, staff will be assigned to the case, and they will coordinate with you on potential meeting dates. 3. Discuss project at meeting with all required departments. If necessary meeting will be held on site. 4. Receive written report from Jefferson County on process to move forward with project. 5. Submit all required applications for project; once approvals are issued, start project! The Jefferson County Code (JCC) 18.40.090 & 18.25.640: When Required. Pre-application conferences are required for all Type II, Type III, Type IV and Type V project applications and Type I project applications proposing impervious surfaces of 10,000 square feet or more and/or non-single-family structures of 5,000 square feet or more. Additionally, pre-application conferences are required for industrial, commercial, and critical area stewardship plan applications. The administrator may exercise discretion not to require a pre-application conference if the administrator determines that the conference information is self-evident, already transmitted, or would not add value to the subsequent application. Pre-application conferences for all other types of applications are optional, and requests for conferences will be considered by the administrator on a time-available basis. The consultation includes preliminary review and administrative assistance. This service does not include extensive field inspection or correspondence. Pre-application consultation does not limit subsequent administrative review. At the conference, Department of Community Development personnel shall provide the applicant with: 1. A list of the requirements for a completed application; 2. A general summary of the procedures to be used to process the application; 3. The references to relevant code provisions or development standards that may apply to the approval of the application; and 4. A list of any applicable hourly review fees that may be charged by one or more County agencies upon the filing of a project permit application with the County. Discussions at the conference or the information provided by the staff shall not bind or prohibit the County’s future application or enforcement of all applicable laws and regulations. No statements or assurances made by County representatives shall in any way relieve the applicant of their duty to submit an application consistent with all relevant requirements of County, state and federal codes, laws, regulations and land use plans. Required Submittal Items Pre-Application Conference Application Conceptual Design plan – see pg. 2 Permit Fees based on departments requested/required to attend for project type List of everybody who will be involved in the meeting and/or project Attach any special reports already completed for the project/parcel 4 4 4 4 4 Apr 06 2021 Exhibit 1 - Page 17 of 80 G:\PermitCenter\%%%FORMS%%%\Land Use\Pre-App\pre-app conference form QR code.docx REV. 2/20/2020 Page 2 Application Directions 1. Please answer all questions on this form completely. 2. Attach one sketch of the Conceptual Design plan for the proposed use or activity, showing the following information: a. Vicinity sketch; b. North arrow and scale; c. Property boundaries and identification of land uses on adjacent properties; d. Means of ingress and egress; e. Property/lot drainage; f. Possible locations of sewage disposal and water supply systems; g. Location of utility easements; and h. Proposed location of buildings, including setbacks to property boundaries. 3. Attach payment of the applicable fee, as set forth in the Jefferson County Fee Ordinance. Applicant Name: Mailing address: Telephone: email: Representative: Mailing address: Telephone: email: representative: Telephone: email: Representative: Telephone: email: Representative: Telephone: email: Include additional names on a separate sheet. Property Description General Location: Legal Description (from Property Tax Statement): 9-Digit Parcel Number: Total Acreage: Zone: % Lot Coverage: This is the % of your property that is covered by impervious surface. Applicant:  Owner  Lessee  Contract Purchaser  Other ____________________________ 8.9 RR-5 3.9% Architect Andrew Nordstrom 4014 Hunts Point Rd, Bellevue, WA 98004 206.650.3573 andrewlnordstrom@gmail.com Tori Masterson 206.354.2619 6113 13th Ave S, Seattle, WA 98108 tori@hoedemakerpfeiffer.com John Sampson 509.551.6647 john@hoedemakerpfeiffer.com Todd Hulbert 360.531.2374 todd@hulbertcc.com Dave Pitkethly 206.369.0398 dave@hulbertcc.com 921084010, 921084011, 921084029, 1071400 4 See attached "Exhibit A" 10 Beach Dr, Nordland, WA 98358 See attached contact list Apr 06 2021 Exhibit 1 - Page 18 of 80 e a6edoaznz,E' A1a mp spm uo lrlql flrJapoo d&€rd\ddvdd\osn rue-n%%96snuoJ%%%tBluscrtlurad\:e'pua$e ol parlnboJ/pelsanbal quauu€dap puE laafoJd uo paseq saajssaal lelolsyoS- aal A8olouqcallelolqns(00'?6Is) leuondo - l!s!n olts00'?zsaal uels(00'{65) puaup ol parlnbaJ/palsanbe.t I - 11gqg1gru 31;3(00'9EIS) pua$e o1 parlnbar/pa$anbar I * SIJO^,llqnd(00'/GS) pua$e o1 pertnbar/pa$anbar I * EUlplln€(00'IZZS) pue$E ol paJrnbar/pelsanba.t l! - l-l{eeH lelUa1guOJtAU300's8rsasn pue-lsaal asuareruo) uollerltddv-aJdllNO 3Sn lltjlo(aleo)ruuorlerlldde-ard slrll ol palelal sraUeu, u1 lua8e Aul se pe'of,uaraJuo,apu8;sep Aqaraq 1(areo)tY/1/V'sJnoq ssaulsnq lelnBat 8ug:np Aluo JnlJo_aq lleqss.luetrlldde at{} ol fuua;o lq8;: pue ssarlv'suorlelnta.r pue sanel alqeltldde;1e qgnn par;duror seqaqt sapnlluol {sanrleluasardal s,rolEr}slu!upv aqlro Joler$lulurpv aql q8norql) ifuno? aql uaqm arldxa lleqs ^rila lo lllElr stttt 'suogpadsul rapl pa:1nba.r iue pue analle.r uoprr;;dde troosodrnd alos aqt Jo, slueie ro sa^lleNoseJdal ,saaloldua s$ pue l1uno3 uosrqlaf ol fuluo lo lqt! pus ssa}]e aphoJd ol oaj8e requnl I'{urlad sit{lro EullueJt BLll }o aJuanbesuoi u! Jo lo ilnsal e se ^ilnof, uosJaJ*af $ulede enJffe lem AuE u! ieuj LlxlLlri sasuodxa pue saalsy'auro11e alqeuosear 'slsor Unol Sluaur8pnl'$eHlnell lle $ulete Aluno] uosja#at ssalureq ploq pue ,Uluuropu! ,a^es ol aar8e reqilru I'p!o pue lgnu tuqaq Uuuad slr.ll ur{nseJ Aeu la{red uoll$ldde qq1 o1 1:adsoJ r{il/\^ Jaulr onue4pdde aql Aq epeu, lrE leueleur e }o uolsrlrrro lue .ro pooqasle3 ;qraleu Auy'i{uadord palca#e aql}o sreu/uto lle ro }uasuo, pue a8payvrou:g llnJ eqr qrm apeu tupq $ uollsJl0de sgl }eqr,$luar osle 1 'atpapnoulrleql lo tsaq oql ol perroJ pue anJl sl ulaleq papno:d uolleujotul aql leql llsa$e JeumoAuEllrdde aql ,utJol uollellldde aqt Eutu8ls Ag'uollerlldde luoudola ep arnln, e $a^ lou saop uolFllnsuo, uolle4dde-ald v "uolp{nsuo3 uo[erlldde-a.rd aql ]o 6ulraql ie palta .i! si.ioilsineej 4tjnof uo pa$Eq 5! uoll€ll'lsuoJ uo;1ec;;dde-ard a.it Supiip trueilliide a il3adso:rj e oi pep;no;d iiolleE.rolult"l,n?f?0 fi(arnleuE!s luerllddV)aJnsolrslo pJepuEls{tuessa$u iii5Bed iiuorrrFpe q)eu-l uoi{uraao DatajJRenovation and improvement of beachfront cottages and amenity spaces of resort with grandfathered use. Seeking Conditional Use Permit. Improvements include updated interior finishes, lighting, fixtures, walls, and floors. Additional bedrooms and bathrooms proposed in select cottages. Renovations to existing lodge building including assembly space and commercial kitchen. New septic system. Landscape improvements. Additional buildings to be proposed outside of shoreline buffer. Potential for glamping/camping capacity. Apr 06 2021 Exhibit 1 - Page 19 of 80 G:\PermitCenter\%%%FORMS%%%\Land Use\Pre-App\pre-app conference form QR code.docx REV. 2/20/2020 Page 4 CONCEPTUAL DESIGN PLAN Please submit (or attach) a site map that graphically shows the required conceptual design items listed on page 2. *See attached Site Plan Apr 06 2021 Exhibit 1 - Page 20 of 80 EXHIBIT "A" Parcel1: ThatportionofGovernmentLot3 inSection8,Township29 North,Range 1 East,W.M.,describedasfollows: Beginningata pointwhichis990 feetSouthand 660 feetEastoftheNorthwestcornerofsaidGovernmentLot 3; ThenceEast660 feettotheEastlineof saidGovernmentLot3; ThenceSouthalongsaidEastline300 feet; ThenceWest 660 feet; ThenceNorth300 feettothePointofBeginning; EXCEPT theSouth200 feetthereof. Parcel2: The South200 feetofthefollowingdescribedtract: ThatportionofGovernmentLot 3 inSection8,Township29 North,Range 1 East,W.M.,describedasfollows: Beginningata pointwhich is990 feetSouthand 660 feetEastoftheNorthwestcornerofsaidGovernmentLot 3; ThenceEast660 feettotheEastlineofsaidGovernmentLot 3; ThenceSouthalongsaidEastline300 feet; ThenceWest 660 feet; ThenceNorth300 feettothePointofBeginning. Parcel3: ThatportionofGovernmentLot 3 inSection8,Township29 North,Range 1 East,W.M.,describedasfollows: Beginningata pointwhichis1,290feetSouthand 660 feetEastoftheNorthwestcornerofsaidGovernmentLot 3; ThenceEast660 feettotheEastlineofsaidGovernmentLot3; ThenceSouthalongsaidEastline400 feet,more or less,tothemeanderlineofOak Bay; ThencealongsaidmeanderlineNorth53°West 150 feet; ThenceNorth79°30'West 550 feet; Thence,leavingsaidmeanderline,North215 feet,more orless,tothePointofBeginning;SaidTractbeing designedon theCountyAssessorsPlatand DescriptionBook asTax No.10 ofsaidSection8; EXCEPT theNorth300 feetthereof; ALSO EXCEPTING THEREFROM therightofway forany countyroadoversaidpremises. Parcel4: Alltidelandsofthesecondclass,asconveyedby theStateofWashington,situateinfrontof,adjacentto,or abuttingupontheWest 640 feetoftheEast660 feetofGovernmentLot3,Section8,Township29 North,Range 1 East,W.M. AllSituateintheCountyofJefferson,Stateof Washington. LPB 10-05(i-l) Page2 of3 Apr 06 2021 Exhibit 1 - Page 21 of 80 HOEDEMAKER PFEIFFER Team Contact List Project: Blake Lodge 10 Beach Drive, Nordland WA 98358 Owner: Andrew Nordstrom (mailing address) 4014 Hunts Point Rd, Bellevue WA 98004 andrewlnordstrom@gmail.com (206)650-3573 Architect/Designer: Hoedemaker Pfeiffer 6113 13th Ave S, Seattle WA 98108 (206)545-8434 Tim Pfeiffer tim@hoedemakerpfeiffer.com c. (917)415-9481 Tori Masterson tori@hoedemakerpfeiffer.com c. (206)354-2619 Missy Bucher missy@hoedemakerpfeiffer.com c. (310)498-1395 John Sampson john@hoedemakerpfeiffer.com c. (509)551-6647 Landscape Architect: Allworth Design 211 Taylor Street Suite 403A, Port Townsend WA 98368 (206)623-7396 or (360)344-2508 Randy Allworth randy@allworthdesign.com c. (206)595-2457 Brian Gregory brian@allworthdesign.com c. (206)719-8449 Contractor: Hulbert Custom Construction Todd Hulbert todd@hulbertcc.com (360)531-2374 Dave Pitkethly dave@hulbertcc.com (206)369-0398 Apr 06 2021 Exhibit 1 - Page 22 of 80 OAK BAYB-9FF=19.9'DECK B-2FF=24.9'CONC.B-11FF=19.9'DECKESTUARYWOODS AND BRUSHWOODS AND BRUSHWOODS AND BRUSHESTUARYESTUARYBEACH RD.BARN(EARTH FLOOR)B-8 FF=21. 6' DECK B-5FF=15.7'DECKCARPORTB-3FF=21.7'DECKLODGEFF=26.8'DECKHOUSEFF=36.5'PORCHCARPORTB-8 FF=27. 3' DECK SHEDGRAVE L F L O O R WOO D S A N D B R U S H BOAT LAUNCH (CONC.)B-4FF=16.1'DECKCONC. PADSTEPSTEPCONC. PORCHEQUIP.FF=38.0'UTIL.FF=40.4'DECKGARAGEFF=26.7'GARAGEFF=36.4'MOBILEFF=36.4'GREENHOUSEDECKNSITE PLAN1 COVERED DRIVE PORT COVERED DRIVE PORT COVERED STORAGE EXISTING 30' WOOD LOG DIVIDERS TYP. NON PAVED BEATEN PATH TYP.101'-10"180'-10"256'-0"99'-3"637'-11"300'-5"24'-8" 276'-9"101'-4"31'-5"98'-2"109'-9"578'-11"PROPERTY LINE ORDINARY HIGH WATER LINE VIEW SETBACK (AVG OF ADJ SIDES) SHORELINE BUFFER SETBACK GRAVEL CONCRETE PAVING ROCK BRICK PAVING ASPHALT PAVING WATER SUPPLY LINE ELECTRICAL POWER GAS SUPPLY LINE TREE SURVEY NOTES LEGEND LEGAL DISCRIPTION ASSESSOR'S PARCEL #921084010, 921084011, 921084029, 1071400. FOR PROPERTY DESCRIPTION SEE "EXHIBIT A" OF THAT DEED FILED UNDER JEFFERSON COUNTY AUDITOR'S FILE #641419. 1.REFER TO HABITAT MAINTENANCE PLAN FOR SITE-SPECIFIC ANALYSIS & NO NET LOSS MITIGATION STRATEGIES 2.REFER TO CIVIL DRAWINGS FOR GRADING & DRAINAGE INFORMATION 3.REFER TO STORM DRAINAGE REPORT FOR TEMPORARY EROSION & SEDIMENT CONTROL STRATEGIES GENERAL NOTES IMPERVIOUS SURFACES AND DRAINAGE REFER TO DRAINAGE REPORT FOR ADDITIONAL IMPERVIOUS SURFACE INFORMATION. 6113 13th Avenue South, Seattle, Washington 98108 206 545 8434 NOT FOR CONSTRUCTION HOEDEMAKER ISSUE DATEBLAKE LODGEPFEIFFER 10 BEACH DRIVENORDLAND, WA.98358This document contains information proprietary to Hoedemaker Pfeiffer, LLC and is furnished in confidence for the limited purpose of evaluation, bidding, or review. This document or its contents may not be used for any other purpose and may not be reproduced or disclosed to others without the pre-written consent of Hoedemaker Pfeiffer, LLC. All rights reserved. Copyright 2019. 1:500 A002 EXISTING OVERALL SITE PLAN BA CD 300'-0" Apr 06 2021 Exhibit 1 - Page 23 of 80 Exhibit 1 - Page 24 of 80 Exhibit 1 - Page 25 of 80 Exhibit 1 - Page 26 of 80 Exhibit 1 - Page 27 of 80 Exhibit 1 - Page 28 of 80 OAK BAY40 40 40 40 4040 40 40 35 3535 3535 35 35353030 303030 3030 30 30 25 2525 25 25 25 25 2520202020 20 2020 2020 20151515 15 15151515 1515101010 10 1010101010101010101010105555555555B-6FF=19.9'DECK B-1FF=24.9'CONC.B-7FF=19.9'DECKESTUARYWOODS AND BRUSHWOODS AND BRUSHWOODS AND BRUSHESTUARYESTUARYBEACH RD.BARN(EARTH FLOOR)B-8 FF=21.6' DECK 15B-4FF=15.7'DECKCARPORTB-2FF=21.7'DECKLODGEFF=26.8'DECKWELL HOUSEB-10FF=36.5'PORCHCARPORTB-9FF=27.3'DECK SHEDGRAVEL F L O O R WOODS AND BRUSHFIR12FIR14BOAT LAUNCH (CONC.)B-3FF=16.1'DECKIRRIGATIONCONTROLVALVECONC. PADSTEPSTEPCONC. PORCHSS C/OWELL2 SEPTIC PORTSEQUIP.FF=38.0'UTIL.FF=40.4'DECKGARAGEFF=26.7'GARAGEFF=36.4'MOBILEFF=36.4'CONC.GRAVEL PATHGREENHOUSEDECKPPTELEPEDO/H ELEC.PPO/H ELEC.B-5FF=17.6'DECK FF=17.5' OHWM OHWM OHWMOHWMOHWM150'SHORELINE BUFFER 150'SHORELINE BUFFER 150'SHORELINEBUFFER150'SHORELINEBUFFER200'SHORELINE BUFFER 200'SHORELINE BUFFER 200'SHORELINEBUFFER200'SHORELINEBUFFERNSITE PLAN1 COVERED DRIVE PORT COVERED DRIVE PORT NON PAVED BEATEN PATH TYP.101'-10"180'-10"256'-0"99'-3"637'-11"300'-5"24'-8" 276'-9"101'-4"31'-5"98'-2"109'-9"578'-11"PROPERTY LINE ORDINARY HIGH WATER LINE VIEW SETBACK (AVG OF ADJ SIDES) SHORELINE BUFFER SETBACK GRAVEL CONCRETE PAVING ROCK BRICK PAVING ASPHALT PAVING WATER SUPPLY LINE ELECTRICAL POWER GAS SUPPLY LINE TREE SURVEY NOTES LEGEND LEGAL DISCRIPTION ASSESSOR'S PARCEL #921084010, 921084011, 921084029, 1071400. FOR PROPERTY DESCRIPTION SEE "EXHIBIT A" OF THAT DEED FILED UNDER JEFFERSON COUNTY AUDITOR'S FILE #641419. 1.REFER TO HABITAT MAINTENANCE PLAN FOR SITE-SPECIFIC ANALYSIS & NO NET LOSS MITIGATION STRATEGIES 2.REFER TO CIVIL DRAWINGS FOR GRADING & DRAINAGE INFORMATION 3.REFER TO STORM DRAINAGE REPORT FOR TEMPORARY EROSION & SEDIMENT CONTROL STRATEGIES GENERAL NOTES IMPERVIOUS SURFACES AND DRAINAGE REFER TO DRAINAGE REPORT FOR ADDITIONAL IMPERVIOUS SURFACE INFORMATION. 6113 13th Avenue South, Seattle, Washington 98108 206 545 8434 NOT FOR CONSTRUCTION HOEDEMAKER ISSUE DATEBLAKE LODGEPFEIFFER 10 BEACH DRIVENORDLAND, WA.98358This document contains information proprietary to Hoedemaker Pfeiffer, LLC and is furnished in confidence for the limited purpose of evaluation, bidding, or review. This document or its contents may not be used for any other purpose and may not be reproduced or disclosed to others without the pre-written consent of Hoedemaker Pfeiffer, LLC. All rights reserved. Copyright 2019. 1:500 A002 EXISTING OVERALL SITE PLAN BA CD 300'-0" Exhibit 1 - Page 29 of 80 40 40 40 4040 40 35 35 3535 30 3030 30 30 25 25 25 25 202020 20 2015B-6FF=19.9'DECKB-7FF=19.9'DECKBARN(EARTH FLOOR)B-8FF=21.6' DECK B-10FF=36.5'PORCHCARPORTB-9FF=27.3'DECK SHEDGRAVEL FL O O R WOODS AND BRUSHEQUIP.FF=38.0'UTIL.FF=40.4'DECKB-5FF=17.6'DECK FF=17.5' 150'SHORELINE BUFFER 150'SHORELINE BUFFER200'SHORELINE BUFFER 200'SHORELINE BUFFER NSITE PLAN - A1 PROPERTY LINE ORDINARY HIGH WATER LINE VIEW SETBACK (AVG OF ADJ SIDES) SHORELINE BUFFER SETBACK GRAVEL CONCRETE PAVING ROCK BRICK PAVING ASPHALT PAVING WATER SUPPLY LINE ELECTRICAL POWER GAS SUPPLY LINE TREE 1.UNDERGROUND UTILITIES WERE NOT LOCATED AS PART OF THIS SURVEY 2.BUILDING SETBACK LINE SHOWN PER CITY OF BAINBRIDGE ISLAND MUNICIPAL CODE 18.12.020 THESE SETBACKS CAN CHANGE DEPENDING ON THE STRUCTURE PROPOSED SURVEY NOTES LEGEND LEGAL DISCRIPTION TRACT 9, WESTHAMPTON, AS PER PLAT RECORDED IN VOLUME 7 OF PLATS, PAGE 39, RECORDS OF KITSAP COUNTY, EXCEPT THAT PORTION OF THE SOUTH 110 FEET THEREOF LYING WESTERLY OF THE WESTERLY LINE OF THE WEST 20 FEET OF SAID TRACT 9; TOGETHER WITH TIDELANDS OF THE SECOND CLASS, AS CONVEYED BY THE STATE OF WASHINGTON, SITUATE IN FRONT OF, ADJACENT TO AND ABUTTING THEREON; AND TOGETHER WITH THAT PORTION OF OYSTERLANDS FRONTING THEREON LYING WITHIN FLETCHER BAY, DESCRIBED IN DEED RECORDED IN VOLUME 399 OF DEEDS, PAGE 326, RECORDS OF KITSAP COUNTY, BEARING AUDITOR'S FILE NO. 419037, THE EASTERLY BOUNDARY OF SAID OYSTERLANDS BEING A LINE COMMENCING AT THE NORTHEAST CORNER OF SAID TRACT 9 AND RUNNING NORTHEASTERLY TO A POINT WHERE THE EASTERLY BOUNDARY LINE OF TRACT 8 OF SAID PLAT EXTENDED NORTH 0'41'58" WEST INTERSECTS THE NORTHERLY BOUNDARY OF SAID OYSTERLANDS. SUBJECT TO ALL EASEMENTS, EXCEPTIONS AND ENCUMBRANCES OF RECORD. 1.REFER TO HABITAT MAINTENANCE PLAN FOR SITE-SPECIFIC ANALYSIS & NO NET LOSS MITIGATION STRATEGIES 2.REFER TO CIVIL DRAWINGS FOR GRADING & DRAINAGE INFORMATION 3.REFER TO STORM DRAINAGE REPORT FOR TEMPORARY EROSION & SEDIMENT CONTROL STRATEGIES 4.HARDSCAPE PATIO LOCATIONS REFLECT ACCURATE SIZE & LOCATION. FINAL SHAPE TO BE DETERMINED PER LANDSCAPE ARCHITECT 5.REFER TO A004 FOR MITIGATION PLANTING LOCATIONS & SOIL AMENDMENT LOCATIONS GENERAL NOTES IMPERVIOUS SURFACES AND DRAINAGE REFER TO DRAINAGE REPORT FOR ADDITIONAL IMPERVIOUS SURFACE INFORMATION. 2507 SF - EXISTING SFR (INCL. OVERHANGS) 1441 SF - (E) ACCESSORY BLDG (INCL. OVERHANGS) 1340 SF - (E) CARPORT AND COVERED WALKWAY 2630 SF - (E) DRIVEWAY AND BRICK TERRACE 3568 SF - (E) PATIOS, WALKWAYS, HARDSCAPE 2360 SF - (E) GRAVEL BEDS ALONG WEST SHORE 12905 SF TOTAL IMPERVIOUS SURFACE (NOTE THAT AREAS ABOVE OVERLAP AND ARE REDUNDANT) 6113 13th Avenue South, Seattle, Washington 98108 206 545 8434 NOT FOR CONSTRUCTION HOEDEMAKER ISSUE DATEBLAKE LODGEPFEIFFER 10 BEACH DRIVENORDLAND, WA.98358This document contains information proprietary to Hoedemaker Pfeiffer, LLC and is furnished in confidence for the limited purpose of evaluation, bidding, or review. This document or its contents may not be used for any other purpose and may not be reproduced or disclosed to others without the pre-written consent of Hoedemaker Pfeiffer, LLC. All rights reserved. Copyright 2019. BA CD 1/16" = 1'-0" A003 EXISTING SITE PLAN - A Exhibit 1 - Page 30 of 80 40 35 35 3535303030 30 2525 25 2520 2020 2015 15151515 1515101010105555B-1FF=24.9'CONC.B-8FF=21.6'DECK 15B-4FF=15.7'DECKCARPORTB-2FF=21.7'DECKLODGEFF=26.8'DECKWELL HOUSEB-10FF=36.5'PORCHCARPORTB-9FF=27.3'DECK SHEDGRAVEL FL O O R FIR12FIR14B-3FF=16.1'DECKIRRIGATIONCONTROLVALVECONC. PADSTEPSTEPCONC. PORCHSS C/OWELL2 SEPTIC PORTSGARAGEFF=26.7'GARAGEFF=36.4'MOBILEFF=36.4'CONC.GRAVEL PATHGREENHOUSEDECKO/H ELEC.PPO/H ELEC.B-5FF=17.6'DECK FF=17.5'OHWM150'SHORELINE BUFFER 150'SHORELINEBUFFER150'SHORELINEBUFFER200'SHORELINEBUFFER200'NSITE PLAN - B1 PROPERTY LINE ORDINARY HIGH WATER LINE VIEW SETBACK (AVG OF ADJ SIDES) SHORELINE BUFFER SETBACK GRAVEL CONCRETE PAVING ROCK BRICK PAVING ASPHALT PAVING WATER SUPPLY LINE ELECTRICAL POWER GAS SUPPLY LINE TREE 1.UNDERGROUND UTILITIES WERE NOT LOCATED AS PART OF THIS SURVEY 2.BUILDING SETBACK LINE SHOWN PER CITY OF BAINBRIDGE ISLAND MUNICIPAL CODE 18.12.020 THESE SETBACKS CAN CHANGE DEPENDING ON THE STRUCTURE PROPOSED SURVEY NOTES LEGEND LEGAL DISCRIPTION TRACT 9, WESTHAMPTON, AS PER PLAT RECORDED IN VOLUME 7 OF PLATS, PAGE 39, RECORDS OF KITSAP COUNTY, EXCEPT THAT PORTION OF THE SOUTH 110 FEET THEREOF LYING WESTERLY OF THE WESTERLY LINE OF THE WEST 20 FEET OF SAID TRACT 9; TOGETHER WITH TIDELANDS OF THE SECOND CLASS, AS CONVEYED BY THE STATE OF WASHINGTON, SITUATE IN FRONT OF, ADJACENT TO AND ABUTTING THEREON; AND TOGETHER WITH THAT PORTION OF OYSTERLANDS FRONTING THEREON LYING WITHIN FLETCHER BAY, DESCRIBED IN DEED RECORDED IN VOLUME 399 OF DEEDS, PAGE 326, RECORDS OF KITSAP COUNTY, BEARING AUDITOR'S FILE NO. 419037, THE EASTERLY BOUNDARY OF SAID OYSTERLANDS BEING A LINE COMMENCING AT THE NORTHEAST CORNER OF SAID TRACT 9 AND RUNNING NORTHEASTERLY TO A POINT WHERE THE EASTERLY BOUNDARY LINE OF TRACT 8 OF SAID PLAT EXTENDED NORTH 0'41'58" WEST INTERSECTS THE NORTHERLY BOUNDARY OF SAID OYSTERLANDS. SUBJECT TO ALL EASEMENTS, EXCEPTIONS AND ENCUMBRANCES OF RECORD. 1.REFER TO HABITAT MAINTENANCE PLAN FOR SITE-SPECIFIC ANALYSIS & NO NET LOSS MITIGATION STRATEGIES 2.REFER TO CIVIL DRAWINGS FOR GRADING & DRAINAGE INFORMATION 3.REFER TO STORM DRAINAGE REPORT FOR TEMPORARY EROSION & SEDIMENT CONTROL STRATEGIES 4.HARDSCAPE PATIO LOCATIONS REFLECT ACCURATE SIZE & LOCATION. FINAL SHAPE TO BE DETERMINED PER LANDSCAPE ARCHITECT 5.REFER TO A004 FOR MITIGATION PLANTING LOCATIONS & SOIL AMENDMENT LOCATIONS GENERAL NOTES IMPERVIOUS SURFACES AND DRAINAGE REFER TO DRAINAGE REPORT FOR ADDITIONAL IMPERVIOUS SURFACE INFORMATION. 2507 SF - EXISTING SFR (INCL. OVERHANGS) 1441 SF - (E) ACCESSORY BLDG (INCL. OVERHANGS) 1340 SF - (E) CARPORT AND COVERED WALKWAY 2630 SF - (E) DRIVEWAY AND BRICK TERRACE 3568 SF - (E) PATIOS, WALKWAYS, HARDSCAPE 2360 SF - (E) GRAVEL BEDS ALONG WEST SHORE 12905 SF TOTAL IMPERVIOUS SURFACE (NOTE THAT AREAS ABOVE OVERLAP AND ARE REDUNDANT) 6113 13th Avenue South, Seattle, Washington 98108 206 545 8434 NOT FOR CONSTRUCTION HOEDEMAKER ISSUE DATEBLAKE LODGEPFEIFFER 10 BEACH DRIVENORDLAND, WA.98358This document contains information proprietary to Hoedemaker Pfeiffer, LLC and is furnished in confidence for the limited purpose of evaluation, bidding, or review. This document or its contents may not be used for any other purpose and may not be reproduced or disclosed to others without the pre-written consent of Hoedemaker Pfeiffer, LLC. All rights reserved. Copyright 2019. BA CD 1/16" = 1'-0" A004 EXISTING SITE PLAN - B Exhibit 1 - Page 31 of 80 OAK BAY15 1010101010101055555BOAT LAUNCH (CONC.)2 SEPTIC PORTSDECK FF=17.5'OHWMOHWMNSITE PLAN - C1 PROPERTY LINE ORDINARY HIGH WATER LINE VIEW SETBACK (AVG OF ADJ SIDES) SHORELINE BUFFER SETBACK GRAVEL CONCRETE PAVING ROCK BRICK PAVING ASPHALT PAVING WATER SUPPLY LINE ELECTRICAL POWER GAS SUPPLY LINE TREE 1.UNDERGROUND UTILITIES WERE NOT LOCATED AS PART OF THIS SURVEY 2.BUILDING SETBACK LINE SHOWN PER CITY OF BAINBRIDGE ISLAND MUNICIPAL CODE 18.12.020 THESE SETBACKS CAN CHANGE DEPENDING ON THE STRUCTURE PROPOSED SURVEY NOTES LEGEND LEGAL DISCRIPTION TRACT 9, WESTHAMPTON, AS PER PLAT RECORDED IN VOLUME 7 OF PLATS, PAGE 39, RECORDS OF KITSAP COUNTY, EXCEPT THAT PORTION OF THE SOUTH 110 FEET THEREOF LYING WESTERLY OF THE WESTERLY LINE OF THE WEST 20 FEET OF SAID TRACT 9; TOGETHER WITH TIDELANDS OF THE SECOND CLASS, AS CONVEYED BY THE STATE OF WASHINGTON, SITUATE IN FRONT OF, ADJACENT TO AND ABUTTING THEREON; AND TOGETHER WITH THAT PORTION OF OYSTERLANDS FRONTING THEREON LYING WITHIN FLETCHER BAY, DESCRIBED IN DEED RECORDED IN VOLUME 399 OF DEEDS, PAGE 326, RECORDS OF KITSAP COUNTY, BEARING AUDITOR'S FILE NO. 419037, THE EASTERLY BOUNDARY OF SAID OYSTERLANDS BEING A LINE COMMENCING AT THE NORTHEAST CORNER OF SAID TRACT 9 AND RUNNING NORTHEASTERLY TO A POINT WHERE THE EASTERLY BOUNDARY LINE OF TRACT 8 OF SAID PLAT EXTENDED NORTH 0'41'58" WEST INTERSECTS THE NORTHERLY BOUNDARY OF SAID OYSTERLANDS. SUBJECT TO ALL EASEMENTS, EXCEPTIONS AND ENCUMBRANCES OF RECORD. 1.REFER TO HABITAT MAINTENANCE PLAN FOR SITE-SPECIFIC ANALYSIS & NO NET LOSS MITIGATION STRATEGIES 2.REFER TO CIVIL DRAWINGS FOR GRADING & DRAINAGE INFORMATION 3.REFER TO STORM DRAINAGE REPORT FOR TEMPORARY EROSION & SEDIMENT CONTROL STRATEGIES 4.HARDSCAPE PATIO LOCATIONS REFLECT ACCURATE SIZE & LOCATION. FINAL SHAPE TO BE DETERMINED PER LANDSCAPE ARCHITECT 5.REFER TO A004 FOR MITIGATION PLANTING LOCATIONS & SOIL AMENDMENT LOCATIONS GENERAL NOTES IMPERVIOUS SURFACES AND DRAINAGE REFER TO DRAINAGE REPORT FOR ADDITIONAL IMPERVIOUS SURFACE INFORMATION. 2507 SF - EXISTING SFR (INCL. OVERHANGS) 1441 SF - (E) ACCESSORY BLDG (INCL. OVERHANGS) 1340 SF - (E) CARPORT AND COVERED WALKWAY 2630 SF - (E) DRIVEWAY AND BRICK TERRACE 3568 SF - (E) PATIOS, WALKWAYS, HARDSCAPE 2360 SF - (E) GRAVEL BEDS ALONG WEST SHORE 12905 SF TOTAL IMPERVIOUS SURFACE (NOTE THAT AREAS ABOVE OVERLAP AND ARE REDUNDANT) 6113 13th Avenue South, Seattle, Washington 98108 206 545 8434 NOT FOR CONSTRUCTION HOEDEMAKER ISSUE DATEBLAKE LODGEPFEIFFER 10 BEACH DRIVENORDLAND, WA.98358This document contains information proprietary to Hoedemaker Pfeiffer, LLC and is furnished in confidence for the limited purpose of evaluation, bidding, or review. This document or its contents may not be used for any other purpose and may not be reproduced or disclosed to others without the pre-written consent of Hoedemaker Pfeiffer, LLC. All rights reserved. Copyright 2019. BA CD 1/16" = 1'-0" A005 EXISTING SITE PLAN - C Exhibit 1 - Page 32 of 80 1515 15 101010 10 10ESTUARYWOODS AND BRUSHWOODS AND BRUSHWOODS AND BRUSHESTUARYESTUARYDECK FF=17.5' OHWM OHWM OHWM150'SHORELINE BUFFER NSITE PLAN - D 1/16" = 1'-0"1 PROPERTY LINE ORDINARY HIGH WATER LINE VIEW SETBACK (AVG OF ADJ SIDES) SHORELINE BUFFER SETBACK GRAVEL CONCRETE PAVING ROCK BRICK PAVING ASPHALT PAVING WATER SUPPLY LINE ELECTRICAL POWER GAS SUPPLY LINE TREE 1.UNDERGROUND UTILITIES WERE NOT LOCATED AS PART OF THIS SURVEY 2.BUILDING SETBACK LINE SHOWN PER CITY OF BAINBRIDGE ISLAND MUNICIPAL CODE 18.12.020 THESE SETBACKS CAN CHANGE DEPENDING ON THE STRUCTURE PROPOSED SURVEY NOTES LEGEND LEGAL DISCRIPTION TRACT 9, WESTHAMPTON, AS PER PLAT RECORDED IN VOLUME 7 OF PLATS, PAGE 39, RECORDS OF KITSAP COUNTY, EXCEPT THAT PORTION OF THE SOUTH 110 FEET THEREOF LYING WESTERLY OF THE WESTERLY LINE OF THE WEST 20 FEET OF SAID TRACT 9; TOGETHER WITH TIDELANDS OF THE SECOND CLASS, AS CONVEYED BY THE STATE OF WASHINGTON, SITUATE IN FRONT OF, ADJACENT TO AND ABUTTING THEREON; AND TOGETHER WITH THAT PORTION OF OYSTERLANDS FRONTING THEREON LYING WITHIN FLETCHER BAY, DESCRIBED IN DEED RECORDED IN VOLUME 399 OF DEEDS, PAGE 326, RECORDS OF KITSAP COUNTY, BEARING AUDITOR'S FILE NO. 419037, THE EASTERLY BOUNDARY OF SAID OYSTERLANDS BEING A LINE COMMENCING AT THE NORTHEAST CORNER OF SAID TRACT 9 AND RUNNING NORTHEASTERLY TO A POINT WHERE THE EASTERLY BOUNDARY LINE OF TRACT 8 OF SAID PLAT EXTENDED NORTH 0'41'58" WEST INTERSECTS THE NORTHERLY BOUNDARY OF SAID OYSTERLANDS. SUBJECT TO ALL EASEMENTS, EXCEPTIONS AND ENCUMBRANCES OF RECORD. 1.REFER TO HABITAT MAINTENANCE PLAN FOR SITE-SPECIFIC ANALYSIS & NO NET LOSS MITIGATION STRATEGIES 2.REFER TO CIVIL DRAWINGS FOR GRADING & DRAINAGE INFORMATION 3.REFER TO STORM DRAINAGE REPORT FOR TEMPORARY EROSION & SEDIMENT CONTROL STRATEGIES 4.HARDSCAPE PATIO LOCATIONS REFLECT ACCURATE SIZE & LOCATION. FINAL SHAPE TO BE DETERMINED PER LANDSCAPE ARCHITECT 5.REFER TO A004 FOR MITIGATION PLANTING LOCATIONS & SOIL AMENDMENT LOCATIONS GENERAL NOTES IMPERVIOUS SURFACES AND DRAINAGE REFER TO DRAINAGE REPORT FOR ADDITIONAL IMPERVIOUS SURFACE INFORMATION. 2507 SF - EXISTING SFR (INCL. OVERHANGS) 1441 SF - (E) ACCESSORY BLDG (INCL. OVERHANGS) 1340 SF - (E) CARPORT AND COVERED WALKWAY 2630 SF - (E) DRIVEWAY AND BRICK TERRACE 3568 SF - (E) PATIOS, WALKWAYS, HARDSCAPE 2360 SF - (E) GRAVEL BEDS ALONG WEST SHORE 12905 SF TOTAL IMPERVIOUS SURFACE (NOTE THAT AREAS ABOVE OVERLAP AND ARE REDUNDANT) 6113 13th Avenue South, Seattle, Washington 98108 206 545 8434 NOT FOR CONSTRUCTION HOEDEMAKER ISSUE DATEBLAKE LODGEPFEIFFER 10 BEACH DRIVENORDLAND, WA.98358This document contains information proprietary to Hoedemaker Pfeiffer, LLC and is furnished in confidence for the limited purpose of evaluation, bidding, or review. This document or its contents may not be used for any other purpose and may not be reproduced or disclosed to others without the pre-written consent of Hoedemaker Pfeiffer, LLC. All rights reserved. Copyright 2019. BA CD 1/16" = 1'-0" A006 EXISTING SITE PLAN - d Exhibit 1 - Page 33 of 80 2x WALL CONSTRUCTION MASONRY WALL CONSTRCUTION SMOKE/CO2 DETECTOR EXHAUST FAN WINDOW TAG DOOR TAG 6113 13th Avenue South, Seattle, Washington 98108 206 545 8434 NOT FOR CONSTRUCTION HOEDEMAKER ISSUE DATEBLAKE LODGEPFEIFFER 10 BEACH DRIVENORDLAND, WA.98358This document contains information proprietary to Hoedemaker Pfeiffer, LLC and is furnished in confidence for the limited purpose of evaluation, bidding, or review. This document or its contents may not be used for any other purpose and may not be reproduced or disclosed to others without the pre-written consent of Hoedemaker Pfeiffer, LLC. All rights reserved. Copyright 2019. LEVEL 1 DEMO PLAN3 PROPOSED LEVEL 1 FLOOR PLAN1 LEVEL 2 DEMO PLAN4 PROPOSED LEVEL 2 FLOOR PLAN2 1/4" = 1'-0" A1.01 CABIN 01 FLOOR PLANS GENERAL NOTES 1.DO NOT SCALE DRAWINGS, REFER TO DIMENSIONS SHOWN. 2.CONTACT ARCHITECT FOR ANY MISSING DIMENSIONS OR INFORMATION 3.ALL DIMENSIONS ARE TO FACE OF FRAMING, UNLESS NOTED OTHERWISE 4.ROUGH CARPENTER TO COORDINATE FRAMING LAYOUT WITH LIGHTING, PLUMBING & MECHANICAL PLANS. INFORM ARCHITECT OF ANY DISCREPANCIES 5. SEE A800-A802 WINDOW & DOOR SCHEDULES FOR UNIT SIZES 6.SEE COVER SHEET FOR TYPICAL ABBREVIATIONS & LEGEND 7.REFER TO A001 FOR DETAILED PROJECT NOTES & BEST PRACTICES 8.BUILDING MASSING/ENVELOPE TO REMAIN, UNO. SDCM DR WND LEGEND KEY PLAN N N N N N A1.03 1 A1.032 A1.033 A1.03 64 5 A1.03 7 01-601-5 01-4 01-3 01-1 01-2 MAIN 01.1 (E) BEDROOM 01.4 (N) BATH 01.3 (E) BATH 01.2 01-8 (E) BEDROOM 01.6(E) BEDROOM 01.7 01-7 (E) HALL 01.5 01-A 01-C 01-B 01-D 2'-6"43 4" 2'-2" REPLACE ALL WINDOWS, TYP. DEMO ALL (E) FIXTUERS + FINISHES P-X P-X P-X P-X P-X #1 3'-7"4'-5"3'-3"5'-5"2'-8"2'-1"3'-1012"5'-0"1'-2"41 2"2'-6"2'-712"Exhibit 1 - Page 34 of 80 6113 13th Avenue South, Seattle, Washington 98108 206 545 8434 NOT FOR CONSTRUCTION HOEDEMAKER ISSUE DATEBLAKE LODGEPFEIFFER 10 BEACH DRIVENORDLAND, WA.98358This document contains information proprietary to Hoedemaker Pfeiffer, LLC and is furnished in confidence for the limited purpose of evaluation, bidding, or review. This document or its contents may not be used for any other purpose and may not be reproduced or disclosed to others without the pre-written consent of Hoedemaker Pfeiffer, LLC. All rights reserved. Copyright 2019. 1/4" = 1'-0" A1.02 CABIN 01 ELEVATIONS & DETAILS BUILDING ELEVATION - SOUTH3 BUILDING ELEVATION - EAST1 BUILDING ELEVATION - NORTH4 BUILDING ELEVATION - WEST2 (E) DOOR TO BE INFILLED (N) ENTRY DOOR GENERAL NOTES 1.DO NOT SCALE DRAWINGS, REFER TO DIMENSIONS SHOWN. 2.CONTACT ARCHITECT FOR ANY MISSING DIMENSIONS OR INFORMATION 3.ALL DIMENSIONS ARE TO FACE OF FRAMING, UNLESS NOTED OTHERWISE 4.ROUGH CARPENTER TO COORDINATE FRAMING LAYOUT WITH LIGHTING, PLUMBING & MECHANICAL PLANS. INFORM ARCHITECT OF ANY DISCREPANCIES 5. SEE A800-A802 WINDOW & DOOR SCHEDULES FOR UNIT SIZES 6.SEE COVER SHEET FOR TYPICAL ABBREVIATIONS & LEGEND 7.REFER TO A001 FOR DETAILED PROJECT NOTES & BEST PRACTICES 8.BUILDING MASSING/ENVELOPE TO REMAIN, UNO. Exhibit 1 - Page 35 of 80 6113 13th Avenue South, Seattle, Washington 98108 206 545 8434 NOT FOR CONSTRUCTION HOEDEMAKER ISSUE DATEBLAKE LODGEPFEIFFER 10 BEACH DRIVENORDLAND, WA.98358This document contains information proprietary to Hoedemaker Pfeiffer, LLC and is furnished in confidence for the limited purpose of evaluation, bidding, or review. This document or its contents may not be used for any other purpose and may not be reproduced or disclosed to others without the pre-written consent of Hoedemaker Pfeiffer, LLC. All rights reserved. Copyright 2019. GENERAL NOTES 1.DO NOT SCALE DRAWINGS, REFER TO DIMENSIONS SHOWN. 2.CONTACT ARCHITECT FOR ANY MISSING DIMENSIONS OR INFORMATION 3.ALL DIMENSIONS ARE TO FACE OF FRAMING, UNLESS NOTED OTHERWISE 4.ROUGH CARPENTER TO COORDINATE FRAMING LAYOUT WITH LIGHTING, PLUMBING & MECHANICAL PLANS. INFORM ARCHITECT OF ANY DISCREPANCIES 5. SEE A800-A802 WINDOW & DOOR SCHEDULES FOR UNIT SIZES 6.SEE COVER SHEET FOR TYPICAL ABBREVIATIONS & LEGEND 7.REFER TO A001 FOR DETAILED PROJECT NOTES & BEST PRACTICES 8.BUILDING MASSING/ENVELOPE TO REMAIN, UNO. ELEVATION X1 1/2" = 1'-0" A1.03 CABIN 01 ELEVATIONS & DETAILS ELEVATION X4 ELEVATION X5ELEVATION X6 ELEVATION X1 ELEVATION X2ELEVATION X3 P-X T-X P-XP-X P-X Exhibit 1 - Page 36 of 80 E.P. 2x WALL CONSTRUCTION MASONRY WALL CONSTRCUTION SMOKE/CO2 DETECTOR EXHAUST FAN WINDOW TAG DOOR TAG 6113 13th Avenue South, Seattle, Washington 98108 206 545 8434 NOT FOR CONSTRUCTION HOEDEMAKER ISSUE DATEBLAKE LODGEPFEIFFER 10 BEACH DRIVENORDLAND, WA.98358This document contains information proprietary to Hoedemaker Pfeiffer, LLC and is furnished in confidence for the limited purpose of evaluation, bidding, or review. This document or its contents may not be used for any other purpose and may not be reproduced or disclosed to others without the pre-written consent of Hoedemaker Pfeiffer, LLC. All rights reserved. Copyright 2019. LEVEL 1 DEMO PLAN 1/4" = 1'-0"6 PROPOSED LEVEL 1 FLOOR PLAN 1/4" = 1'-0"5 1/4" = 1'-0" A2.01 CABIN 02 FLOOR PLANS LEGEND GENERAL NOTES 1.DO NOT SCALE DRAWINGS, REFER TO DIMENSIONS SHOWN. 2.CONTACT ARCHITECT FOR ANY MISSING DIMENSIONS OR INFORMATION 3.ALL DIMENSIONS ARE TO FACE OF FRAMING, UNLESS NOTED OTHERWISE 4.ROUGH CARPENTER TO COORDINATE FRAMING LAYOUT WITH LIGHTING, PLUMBING & MECHANICAL PLANS. INFORM ARCHITECT OF ANY DISCREPANCIES 5. SEE A800-A802 WINDOW & DOOR SCHEDULES FOR UNIT SIZES 6.SEE COVER SHEET FOR TYPICAL ABBREVIATIONS & LEGEND 7.REFER TO A001 FOR DETAILED PROJECT NOTES & BEST PRACTICES 8.BUIDING MASSING/ENVELOPE TO REMAIN, UNO. SDCM DR WND KEY PLAN N N N A2.01 4 3 A2.011 2 MAIN 02.1 (N) BATH 02.2 (E) BEDROOM 02.3 02-1 02-4 02-5 02-3 02-2 02-A 02-C02-B BUILDING ELEVATION - SOUTH 1/4" = 1'-0"2 BUILDING ELEVATION - NORTH 1/4" = 1'-0"1 BUILDING ELEVATION - WEST 1/4" = 1'-0"4 BUILDING ELEVATION - EAST 1/4" = 1'-0"3 2'-0"21 2"2'-238"REPLACE ALL WINDOWS, TYP. DEMO ALL (E) FIXTUERS + FINISHES P-X P-X P-X #2 ENTRY 02.4 (E) DECK (N) ENTRY PORCH (N) ENTRY PORCH 2'-31 2"2'-8"4"6"2'-8"3'-812"3'-0"10'-21 2" Exhibit 1 - Page 37 of 80 6113 13th Avenue South, Seattle, Washington 98108 206 545 8434 NOT FOR CONSTRUCTION HOEDEMAKER ISSUE DATEBLAKE LODGEPFEIFFER 10 BEACH DRIVENORDLAND, WA.98358This document contains information proprietary to Hoedemaker Pfeiffer, LLC and is furnished in confidence for the limited purpose of evaluation, bidding, or review. This document or its contents may not be used for any other purpose and may not be reproduced or disclosed to others without the pre-written consent of Hoedemaker Pfeiffer, LLC. All rights reserved. Copyright 2019. 1/2" = 1'-0" A2.02 CABIN 02 ELEVATIONS & DETAILS ELEVATION X 1/2" = 1'-0"4 ELEVATION X 1/2" = 1'-0"1 ELEVATION X 1/2" = 1'-0"3 ELEVATION X 1/2" = 1'-0"2 P-X T-X P-X T-X P-X Exhibit 1 - Page 38 of 80 E.P.2x WALL CONSTRUCTION MASONRY WALL CONSTRCUTION SMOKE/CO2 DETECTOR EXHAUST FAN WINDOW TAG DOOR TAG 6113 13th Avenue South, Seattle, Washington 98108 206 545 8434 NOT FOR CONSTRUCTION HOEDEMAKER ISSUE DATEBLAKE LODGEPFEIFFER 10 BEACH DRIVENORDLAND, WA.98358This document contains information proprietary to Hoedemaker Pfeiffer, LLC and is furnished in confidence for the limited purpose of evaluation, bidding, or review. This document or its contents may not be used for any other purpose and may not be reproduced or disclosed to others without the pre-written consent of Hoedemaker Pfeiffer, LLC. All rights reserved. Copyright 2019. LEVEL 1 DEMO PLAN3 PROPOSED LEVEL 1 FLOOR PLAN1 LEVEL 2 DEMO PLAN4 PROPOSED LEVEL 2 FLOOR PLAN2 1/4" = 1'-0" A3.01 CABIN 03 FLOOR PLANS LEGEND GENERAL NOTES 1.DO NOT SCALE DRAWINGS, REFER TO DIMENSIONS SHOWN. 2.CONTACT ARCHITECT FOR ANY MISSING DIMENSIONS OR INFORMATION 3.ALL DIMENSIONS ARE TO FACE OF FRAMING, UNLESS NOTED OTHERWISE 4.ROUGH CARPENTER TO COORDINATE FRAMING LAYOUT WITH LIGHTING, PLUMBING & MECHANICAL PLANS. INFORM ARCHITECT OF ANY DISCREPANCIES 5. SEE A800-A802 WINDOW & DOOR SCHEDULES FOR UNIT SIZES 6.SEE COVER SHEET FOR TYPICAL ABBREVIATIONS & LEGEND 7.REFER TO A001 FOR DETAILED PROJECT NOTES & BEST PRACTICES 8.BUILDING MASSING/ENVELOPE TO REMAIN, UNO. SDCM DR WND KEY PLAN N NNNNA3.024 5 A3.02 1 7 A3.02 3 A3.02 2 A3.02 6 MAIN 03.2 KITCHEN 03.3 (N) BEDROOM 03.5 (N) BATH 03.6 (N) SLEEPING PORCH 03.1 (E) BEDROOM 03.7 (E) BATH 03.4 03-1 03-3 03-4 03-5 03-8 03-7 03-B 03-A 03-F 03-E 03-D03-C 03-H 03-G 03-6 03-2 REPLACE ALL WINDOWS, TYP. DEMO ALL (E) FIXTUERS + FINISHES2'-0"5'-2"2'-8"12'-0"DEMO (E) ENTRY PORCH + ENCLOSURE REPLACE ALL WINDOWS, TYP. REMOVE (E) STOVE + FLUE P-X P-X P-X P-X P-X #3 ATTIC (E) DECK (E) DECK (N) ENTRY PORCH 4'-51 2"4'-0"4'-91 2"412"2'-4"2'-51 2"10'-3"3'-3" 3'-11 2" 2'-0"5'-2" 6'-5" DEMO (E) GYP CEILING 2'-6"2'-4"2'-10"3'-412"2'-612"2'-5"2'-6"3'-4"4"17'-0"Exhibit 1 - Page 39 of 80 6113 13th Avenue South, Seattle, Washington 98108 206 545 8434 NOT FOR CONSTRUCTION HOEDEMAKER ISSUE DATEBLAKE LODGEPFEIFFER 10 BEACH DRIVENORDLAND, WA.98358This document contains information proprietary to Hoedemaker Pfeiffer, LLC and is furnished in confidence for the limited purpose of evaluation, bidding, or review. This document or its contents may not be used for any other purpose and may not be reproduced or disclosed to others without the pre-written consent of Hoedemaker Pfeiffer, LLC. All rights reserved. Copyright 2019. BUILDING ELEVATION - NORTH4 BUILDING ELEVATION - EAST2 1/4" = 1'-0" A3.02 CABIN 03 ELEVATIONSBUILDING ELEVATION - SOUTH3 BUILDING ELEVATION - WEST1 (N) ENTRY PORCH (E) DOOR TO BE INFILLED, ENTRY STAIRS TO BE REMOVED GENERAL NOTES 1.DO NOT SCALE DRAWINGS, REFER TO DIMENSIONS SHOWN. 2.CONTACT ARCHITECT FOR ANY MISSING DIMENSIONS OR INFORMATION 3.ALL DIMENSIONS ARE TO FACE OF FRAMING, UNLESS NOTED OTHERWISE 4.ROUGH CARPENTER TO COORDINATE FRAMING LAYOUT WITH LIGHTING, PLUMBING & MECHANICAL PLANS. INFORM ARCHITECT OF ANY DISCREPANCIES 5. SEE A800-A802 WINDOW & DOOR SCHEDULES FOR UNIT SIZES 6.SEE COVER SHEET FOR TYPICAL ABBREVIATIONS & LEGEND 7.REFER TO A001 FOR DETAILED PROJECT NOTES & BEST PRACTICES 8.BUIDING MASSING/ENVELOPE TO REMAIN, UNO. Exhibit 1 - Page 40 of 80 6113 13th Avenue South, Seattle, Washington 98108 206 545 8434 NOT FOR CONSTRUCTION HOEDEMAKER ISSUE DATEBLAKE LODGEPFEIFFER 10 BEACH DRIVENORDLAND, WA.98358This document contains information proprietary to Hoedemaker Pfeiffer, LLC and is furnished in confidence for the limited purpose of evaluation, bidding, or review. This document or its contents may not be used for any other purpose and may not be reproduced or disclosed to others without the pre-written consent of Hoedemaker Pfeiffer, LLC. All rights reserved. Copyright 2019. ELEVATION X1 1/2" = 1'-0" A3.03 CABIN 03 ELEVATIONS & DETAILS GENERAL NOTES 1.DO NOT SCALE DRAWINGS, REFER TO DIMENSIONS SHOWN. 2.CONTACT ARCHITECT FOR ANY MISSING DIMENSIONS OR INFORMATION 3.ALL DIMENSIONS ARE TO FACE OF FRAMING, UNLESS NOTED OTHERWISE 4.ROUGH CARPENTER TO COORDINATE FRAMING LAYOUT WITH LIGHTING, PLUMBING & MECHANICAL PLANS. INFORM ARCHITECT OF ANY DISCREPANCIES 5. SEE A800-A802 WINDOW & DOOR SCHEDULES FOR UNIT SIZES 6.SEE COVER SHEET FOR TYPICAL ABBREVIATIONS & LEGEND 7.REFER TO A001 FOR DETAILED PROJECT NOTES & BEST PRACTICES ELEVATION X2 ELEVATION X5 ELEVATION X4 ELEVATION X6 ELEVATION X7 ELEVATION X3 P-X T-X P-X P-X T-X Exhibit 1 - Page 41 of 80 E.P. 2x WALL CONSTRUCTION MASONRY WALL CONSTRCUTION SMOKE/CO2 DETECTOR EXHAUST FAN WINDOW TAG DOOR TAG 6113 13th Avenue South, Seattle, Washington 98108 206 545 8434 NOT FOR CONSTRUCTION HOEDEMAKER ISSUE DATEBLAKE LODGEPFEIFFER 10 BEACH DRIVENORDLAND, WA.98358This document contains information proprietary to Hoedemaker Pfeiffer, LLC and is furnished in confidence for the limited purpose of evaluation, bidding, or review. This document or its contents may not be used for any other purpose and may not be reproduced or disclosed to others without the pre-written consent of Hoedemaker Pfeiffer, LLC. All rights reserved. Copyright 2019. LEVEL 1 DEMO PLAN 1/4" = 1'-0"6 PROPOSED LEVEL 1 FLOOR PLAN 1/4" = 1'-0"5 1/4" = 1'-0" A4.01 CABIN 04 FLOOR PLANS LEGEND GENERAL NOTES 1.DO NOT SCALE DRAWINGS, REFER TO DIMENSIONS SHOWN. 2.CONTACT ARCHITECT FOR ANY MISSING DIMENSIONS OR INFORMATION 3.ALL DIMENSIONS ARE TO FACE OF FRAMING, UNLESS NOTED OTHERWISE 4.ROUGH CARPENTER TO COORDINATE FRAMING LAYOUT WITH LIGHTING, PLUMBING & MECHANICAL PLANS. INFORM ARCHITECT OF ANY DISCREPANCIES 5. SEE A800-A802 WINDOW & DOOR SCHEDULES FOR UNIT SIZES 6.SEE COVER SHEET FOR TYPICAL ABBREVIATIONS & LEGEND 7.REFER TO A001 FOR DETAILED PROJECT NOTES & BEST PRACTICES 8.BUILDING MASSING/ENVELOPE TO REMAIN, UNO. SDCM DR WND KEY PLAN N NN A4.02 6 A4.02 5 A4.024 A4.022 1 3 MAIN 04.3 BEDROOM 04.6 BEDROOM 04.5 BATH 04.4 SLEEPING PORCH 04.1 BATH 04.7 04.5 04.4 04.3 04.7 04.6 04.204.1 04-C 04-D 04-E 04-F 04-G04-H04-I04-J04-K 04-L 04-M 04-A 04-B BUILDING ELEVATION - WEST 1/4" = 1'-0"2 BUILDING ELEVATION - EAST 1/4" = 1'-0"1 BUILDING ELEVATION - SOUTH 1/4" = 1'-0"4 BUILDING ELEVATION - NORTH 1/4" = 1'-0"3 REPLACE ALL WINDOWS, TYP. DEMO ALL (E) FIXTUERS + FINISHES 5'-9 3 4 " 8" 14'-2" 1'-3" 4'-5"2'-8" REMOVE (E) STOVE P-X P-X P-X P-X P-X #5 (N) ENTRY 04.26'-1134"11'-91 4"578"3'-0"2'-818"11'-5" 3'-0" 7'-11" 10'-53 4"3'-6"4"2'-6"1'-6"2'-818"3'-0"8'-101 2"3'-0"1'-6"5'-63 8"4'-0"10'-0"2'-43 8"2'-612"5'-1112"Exhibit 1 - Page 42 of 80 6113 13th Avenue South, Seattle, Washington 98108 206 545 8434 NOT FOR CONSTRUCTION HOEDEMAKER ISSUE DATEBLAKE LODGEPFEIFFER 10 BEACH DRIVENORDLAND, WA.98358This document contains information proprietary to Hoedemaker Pfeiffer, LLC and is furnished in confidence for the limited purpose of evaluation, bidding, or review. This document or its contents may not be used for any other purpose and may not be reproduced or disclosed to others without the pre-written consent of Hoedemaker Pfeiffer, LLC. All rights reserved. Copyright 2019. 1/2" = 1'-0" A4.02 CABIN 04 ELEVATIONS & DETAILS GENERAL NOTES 1.DO NOT SCALE DRAWINGS, REFER TO DIMENSIONS SHOWN. 2.CONTACT ARCHITECT FOR ANY MISSING DIMENSIONS OR INFORMATION 3.ALL DIMENSIONS ARE TO FACE OF FRAMING, UNLESS NOTED OTHERWISE 4.ROUGH CARPENTER TO COORDINATE FRAMING LAYOUT WITH LIGHTING, PLUMBING & MECHANICAL PLANS. INFORM ARCHITECT OF ANY DISCREPANCIES 5. SEE A800-A802 WINDOW & DOOR SCHEDULES FOR UNIT SIZES 6.SEE COVER SHEET FOR TYPICAL ABBREVIATIONS & LEGEND 7.REFER TO A001 FOR DETAILED PROJECT NOTES & BEST PRACTICES 8.BUILDING MASSING/ENVELOPE TO REMAIN, UNO. ELEVATION X1ELEVATION X2 ELEVATION X3 ELEVATION X 1/2" = 1'-0"5ELEVATION X 1/2" = 1'-0"6 ELEVATION X 1/2" = 1'-0"4 P-X T-X P-X T-X P-X P-X Exhibit 1 - Page 43 of 80 2x WALL CONSTRUCTION MASONRY WALL CONSTRCUTION SMOKE/CO2 DETECTOR EXHAUST FAN WINDOW TAG DOOR TAG 6113 13th Avenue South, Seattle, Washington 98108 206 545 8434 NOT FOR CONSTRUCTION HOEDEMAKER ISSUE DATEBLAKE LODGEPFEIFFER 10 BEACH DRIVENORDLAND, WA.98358This document contains information proprietary to Hoedemaker Pfeiffer, LLC and is furnished in confidence for the limited purpose of evaluation, bidding, or review. This document or its contents may not be used for any other purpose and may not be reproduced or disclosed to others without the pre-written consent of Hoedemaker Pfeiffer, LLC. All rights reserved. Copyright 2019. LEVEL 1 DEMO PLAN 1/4" = 1'-0"6 PROPOSED LEVEL 1 FLOOR PLAN 1/4" = 1'-0"5 1/4" = 1'-0" A5.01 CABIN 05 FLOOR PLANS LEGEND GENERAL NOTES 1.DO NOT SCALE DRAWINGS, REFER TO DIMENSIONS SHOWN. 2.CONTACT ARCHITECT FOR ANY MISSING DIMENSIONS OR INFORMATION 3.ALL DIMENSIONS ARE TO FACE OF FRAMING, UNLESS NOTED OTHERWISE 4.ROUGH CARPENTER TO COORDINATE FRAMING LAYOUT WITH LIGHTING, PLUMBING & MECHANICAL PLANS. INFORM ARCHITECT OF ANY DISCREPANCIES 5. SEE A800-A802 WINDOW & DOOR SCHEDULES FOR UNIT SIZES 6.SEE COVER SHEET FOR TYPICAL ABBREVIATIONS & LEGEND 7.REFER TO A001 FOR DETAILED PROJECT NOTES & BEST PRACTICES 8.BUILDING MASSING/ENVELOPE TO REMAIN, UNO. SDCM DR WND KEY PLAN N N N A5.02 32 1 A5.02 4 A5.02 5 MAIN 05.1 (N) BEDROOM 05.2 (R) BATH 05.3 05.3 05.4 05.1 05.2 05-H 05-G 05-F05-E05-D 05-B 05-C 05-A BUILDING ELEVATION - NORTH 1/4" = 1'-0"2 BUILDING ELEVATION - SOUTH 1/4" = 1'-0"1 BUILDING ELEVATION - WEST 1/4" = 1'-0"4 BUILDING ELEVATION - EAST 1/4" = 1'-0"3 REPLACE ALL WINDOWS, TYP. DEMO ALL (E) FIXTUERS + FINISHES P-X P-X P-X #5 (R) BATH 05.3 (N) ENTRY PORCH 12'-41 4"12'-518"3'-13 8" 3'-10"3'-4" 7'-111 4"5'-6"3'-918"Exhibit 1 - Page 44 of 80 6113 13th Avenue South, Seattle, Washington 98108 206 545 8434 NOT FOR CONSTRUCTION HOEDEMAKER ISSUE DATEBLAKE LODGEPFEIFFER 10 BEACH DRIVENORDLAND, WA.98358This document contains information proprietary to Hoedemaker Pfeiffer, LLC and is furnished in confidence for the limited purpose of evaluation, bidding, or review. This document or its contents may not be used for any other purpose and may not be reproduced or disclosed to others without the pre-written consent of Hoedemaker Pfeiffer, LLC. All rights reserved. Copyright 2019. 1/2" = 1'-0" A5.02 CABIN 05 ELEVATIONS ELEVATION X 1/2" = 1'-0"3ELEVATION X 1/2" = 1'-0"5 ELEVATION X 1/2" = 1'-0"4 ELEVATION X 1/2" = 1'-0"1ELEVATION X 1/2" = 1'-0"2 P-X T-X P-X P-X Exhibit 1 - Page 45 of 80 2x WALL CONSTRUCTION MASONRY WALL CONSTRCUTION SMOKE/CO2 DETECTOR EXHAUST FAN WINDOW TAG DOOR TAG 6113 13th Avenue South, Seattle, Washington 98108 206 545 8434 NOT FOR CONSTRUCTION HOEDEMAKER ISSUE DATEBLAKE LODGEPFEIFFER 10 BEACH DRIVENORDLAND, WA.98358This document contains information proprietary to Hoedemaker Pfeiffer, LLC and is furnished in confidence for the limited purpose of evaluation, bidding, or review. This document or its contents may not be used for any other purpose and may not be reproduced or disclosed to others without the pre-written consent of Hoedemaker Pfeiffer, LLC. All rights reserved. Copyright 2019. LEVEL 1 DEMO PLAN 1/4" = 1'-0"6 PROPOSED LEVEL 1 FLOOR PLAN 1/4" = 1'-0"5 1/4" = 1'-0" A6.01 CABIN 06 FLOOR PLANS LEGEND GENERAL NOTES 1.DO NOT SCALE DRAWINGS, REFER TO DIMENSIONS SHOWN. 2.CONTACT ARCHITECT FOR ANY MISSING DIMENSIONS OR INFORMATION 3.ALL DIMENSIONS ARE TO FACE OF FRAMING, UNLESS NOTED OTHERWISE 4.ROUGH CARPENTER TO COORDINATE FRAMING LAYOUT WITH LIGHTING, PLUMBING & MECHANICAL PLANS. INFORM ARCHITECT OF ANY DISCREPANCIES 5. SEE A800-A802 WINDOW & DOOR SCHEDULES FOR UNIT SIZES 6.SEE COVER SHEET FOR TYPICAL ABBREVIATIONS & LEGEND 7.REFER TO A001 FOR DETAILED PROJECT NOTES & BEST PRACTICES 8.BUILDING MASSING/ENVELOPE TO REMAIN, UNO. SDCM DR WND KEY PLAN NNNA6.032 3 1 A6.025 4 A6.02 7 8 A9.022 1 A6.023 A6.02 6 MAIN 06.1 (R) BEDROOM 06.2 (E) BEDROOM 06.6 (N) BEDROOM 06.5 (E) BATH 06.4 (N) BATH 06.3 06.1 06.4 06.5 06.6 06.2 06.3 06.5A 06.4A06.1A 06.3A 06.2A 06.806.7 06.9 BUILDING ELEVATION - NORTH 1/4" = 1'-0"4 BUILDING ELEVATION - EAST 1/4" = 1'-0"2 BUILDING ELEVATION - SOUTH 1/4" = 1'-0"3 BUILDING ELEVATION - WEST 1/4" = 1'-0"1 REPLACE ALL WINDOWS, TYP. DEMO ALL (E) FIXTUERS + FINISHES 6"5'-3"1'-212"2'-6"6" REMOVE (E) STOVE REMOVE (E) STOVE P-XP-X P-X P-X P-X #6 (E) DECK (E) DOOR TO BE INFILLED; (E) ENTRY PORCH TO BE REMOVED5'-9"5'-83 8"3'-23 4"2'-6"12'-11"9'-812"8'-3"912"2'-6"514"1'-93 4"7'-113 4"2'-21 2"1'-81 8"10'-67 8"8"3'-0"2'-1"2'-21 2"7'-113 4"1'-93 4" Exhibit 1 - Page 46 of 80 6113 13th Avenue South, Seattle, Washington 98108 206 545 8434 NOT FOR CONSTRUCTION HOEDEMAKER ISSUE DATEBLAKE LODGEPFEIFFER 10 BEACH DRIVENORDLAND, WA.98358This document contains information proprietary to Hoedemaker Pfeiffer, LLC and is furnished in confidence for the limited purpose of evaluation, bidding, or review. This document or its contents may not be used for any other purpose and may not be reproduced or disclosed to others without the pre-written consent of Hoedemaker Pfeiffer, LLC. All rights reserved. Copyright 2019. 1/2" = 1'-0" A6.02 CABIN 06 ELEVATIONS & DETAILS GENERAL NOTES 1.DO NOT SCALE DRAWINGS, REFER TO DIMENSIONS SHOWN. 2.CONTACT ARCHITECT FOR ANY MISSING DIMENSIONS OR INFORMATION 3.ALL DIMENSIONS ARE TO FACE OF FRAMING, UNLESS NOTED OTHERWISE 4.ROUGH CARPENTER TO COORDINATE FRAMING LAYOUT WITH LIGHTING, PLUMBING & MECHANICAL PLANS. INFORM ARCHITECT OF ANY DISCREPANCIES 5. SEE A800-A802 WINDOW & DOOR SCHEDULES FOR UNIT SIZES 6.SEE COVER SHEET FOR TYPICAL ABBREVIATIONS & LEGEND 7.REFER TO A001 FOR DETAILED PROJECT NOTES & BEST PRACTICES 8.BUILDING MASSING/ENVELOPE TO REMAIN, UNO. ELEVATION X 1/2" = 1'-0"1ELEVATION X 1/2" = 1'-0"2ELEVATION X 1/2" = 1'-0"3 ELEVATION X 1/2" = 1'-0"5ELEVATION X 1/2" = 1'-0"6 ELEVATION X 1/2" = 1'-0"7ELEVATION X 1/2" = 1'-0"8 ELEVATION X 1/2" = 1'-0"4 P-X T-X P-X P-X P-X P-X P-X T-X Exhibit 1 - Page 47 of 80 6113 13th Avenue South, Seattle, Washington 98108 206 545 8434 NOT FOR CONSTRUCTION HOEDEMAKER ISSUE DATEBLAKE LODGEPFEIFFER 10 BEACH DRIVENORDLAND, WA.98358This document contains information proprietary to Hoedemaker Pfeiffer, LLC and is furnished in confidence for the limited purpose of evaluation, bidding, or review. This document or its contents may not be used for any other purpose and may not be reproduced or disclosed to others without the pre-written consent of Hoedemaker Pfeiffer, LLC. All rights reserved. Copyright 2019. 1/2" = 1'-0" A6.03 CABIN 06 ELEVATIONS GENERAL NOTES 1.DO NOT SCALE DRAWINGS, REFER TO DIMENSIONS SHOWN. 2.CONTACT ARCHITECT FOR ANY MISSING DIMENSIONS OR INFORMATION 3.ALL DIMENSIONS ARE TO FACE OF FRAMING, UNLESS NOTED OTHERWISE 4.ROUGH CARPENTER TO COORDINATE FRAMING LAYOUT WITH LIGHTING, PLUMBING & MECHANICAL PLANS. INFORM ARCHITECT OF ANY DISCREPANCIES 5. SEE A800-A802 WINDOW & DOOR SCHEDULES FOR UNIT SIZES 6.SEE COVER SHEET FOR TYPICAL ABBREVIATIONS & LEGEND 7.REFER TO A001 FOR DETAILED PROJECT NOTES & BEST PRACTICES 8.BUILDING MASSING/ENVELOPE TO REMAIN, UNO. ELEVATION X 1/2" = 1'-0"1 ELEVATION X 1/2" = 1'-0"3 ELEVATION X 1/2" = 1'-0"2 P-X Exhibit 1 - Page 48 of 80 2x WALL CONSTRUCTION MASONRY WALL CONSTRCUTION SMOKE/CO2 DETECTOR EXHAUST FAN WINDOW TAG DOOR TAG 6113 13th Avenue South, Seattle, Washington 98108 206 545 8434 NOT FOR CONSTRUCTION HOEDEMAKER ISSUE DATEBLAKE LODGEPFEIFFER 10 BEACH DRIVENORDLAND, WA.98358This document contains information proprietary to Hoedemaker Pfeiffer, LLC and is furnished in confidence for the limited purpose of evaluation, bidding, or review. This document or its contents may not be used for any other purpose and may not be reproduced or disclosed to others without the pre-written consent of Hoedemaker Pfeiffer, LLC. All rights reserved. Copyright 2019. LEVEL 1 DEMO PLAN 1/4" = 1'-0"6 PROPOSED LEVEL 1 FLOOR PLAN 1/4" = 1'-0"5 1/4" = 1'-0" A7.01 CABIN 07 FLOOR PLANS LEGEND GENERAL NOTES 1.DO NOT SCALE DRAWINGS, REFER TO DIMENSIONS SHOWN. 2.CONTACT ARCHITECT FOR ANY MISSING DIMENSIONS OR INFORMATION 3.ALL DIMENSIONS ARE TO FACE OF FRAMING, UNLESS NOTED OTHERWISE 4.ROUGH CARPENTER TO COORDINATE FRAMING LAYOUT WITH LIGHTING, PLUMBING & MECHANICAL PLANS. INFORM ARCHITECT OF ANY DISCREPANCIES 5. SEE A800-A802 WINDOW & DOOR SCHEDULES FOR UNIT SIZES 6.SEE COVER SHEET FOR TYPICAL ABBREVIATIONS & LEGEND 7.REFER TO A001 FOR DETAILED PROJECT NOTES & BEST PRACTICES SDCM DR WND KEY PLAN N A7.02 42 3 1 A7.02 31 2 MAIN 07.1 (N) BATH 07.2 07.1 07.2 07-A 07-B 07-C BUILDING ELEVATION - NORTH 1/4" = 1'-0"4 BUILDING ELEVATION - EAST 1/4" = 1'-0"2 BUILDING ELEVATION - SOUTH 1/4" = 1'-0"3 BUILDING ELEVATION - WEST 1/4" = 1'-0"1 REPLACE ALL WINDOWS, TYP. REMOVE (E) STOVE P-X P-X P-X #7NN(E) DECK4'-8"3'-1"7"2'-812"712"2'-1"7'-8"2'-21 2" Exhibit 1 - Page 49 of 80 2x WALL CONSTRUCTION MASONRY WALL CONSTRCUTION SMOKE/CO2 DETECTOR EXHAUST FAN WINDOW TAG DOOR TAG 6113 13th Avenue South, Seattle, Washington 98108 206 545 8434 NOT FOR CONSTRUCTION HOEDEMAKER ISSUE DATEBLAKE LODGEPFEIFFER 10 BEACH DRIVENORDLAND, WA.98358This document contains information proprietary to Hoedemaker Pfeiffer, LLC and is furnished in confidence for the limited purpose of evaluation, bidding, or review. This document or its contents may not be used for any other purpose and may not be reproduced or disclosed to others without the pre-written consent of Hoedemaker Pfeiffer, LLC. All rights reserved. Copyright 2019. LEGEND GENERAL NOTES 1.DO NOT SCALE DRAWINGS, REFER TO DIMENSIONS SHOWN. 2.CONTACT ARCHITECT FOR ANY MISSING DIMENSIONS OR INFORMATION 3.ALL DIMENSIONS ARE TO FACE OF FRAMING, UNLESS NOTED OTHERWISE 4.ROUGH CARPENTER TO COORDINATE FRAMING LAYOUT WITH LIGHTING, PLUMBING & MECHANICAL PLANS. INFORM ARCHITECT OF ANY DISCREPANCIES 5. SEE A800-A802 WINDOW & DOOR SCHEDULES FOR UNIT SIZES 6.SEE COVER SHEET FOR TYPICAL ABBREVIATIONS & LEGEND 7.REFER TO A001 FOR DETAILED PROJECT NOTES & BEST PRACTICES SDCM DR WND 1/2" = 1'-0" A7.02 CABIN 07 ELEVATIONS ELEVATION X 1/2" = 1'-0"1ELEVATION X 1/2" = 1'-0"2ELEVATION X 1/2" = 1'-0"3 ELEVATION X 1/2" = 1'-0"4ELEVATION X 1/2" = 1'-0"5ELEVATION X 1/2" = 1'-0"6ELEVATION X 1/2" = 1'-0"7 P-X T-X T-XP-X P-X Exhibit 1 - Page 50 of 80 2x WALL CONSTRUCTION MASONRY WALL CONSTRCUTION SMOKE/CO2 DETECTOR EXHAUST FAN WINDOW TAG DOOR TAG 6113 13th Avenue South, Seattle, Washington 98108 206 545 8434 NOT FOR CONSTRUCTION HOEDEMAKER ISSUE DATEBLAKE LODGEPFEIFFER 10 BEACH DRIVENORDLAND, WA.98358This document contains information proprietary to Hoedemaker Pfeiffer, LLC and is furnished in confidence for the limited purpose of evaluation, bidding, or review. This document or its contents may not be used for any other purpose and may not be reproduced or disclosed to others without the pre-written consent of Hoedemaker Pfeiffer, LLC. All rights reserved. Copyright 2019. LEVEL 1 DEMO PLAN 1/4" = 1'-0"6 PROPOSED LEVEL 1 FLOOR PLAN 1/4" = 1'-0"5 1/4" = 1'-0" A8.01 CABIN 08 FLOOR PLANS LEGEND GENERAL NOTES 1.DO NOT SCALE DRAWINGS, REFER TO DIMENSIONS SHOWN. 2.CONTACT ARCHITECT FOR ANY MISSING DIMENSIONS OR INFORMATION 3.ALL DIMENSIONS ARE TO FACE OF FRAMING, UNLESS NOTED OTHERWISE 4.ROUGH CARPENTER TO COORDINATE FRAMING LAYOUT WITH LIGHTING, PLUMBING & MECHANICAL PLANS. INFORM ARCHITECT OF ANY DISCREPANCIES 5. SEE A800-A802 WINDOW & DOOR SCHEDULES FOR UNIT SIZES 6.SEE COVER SHEET FOR TYPICAL ABBREVIATIONS & LEGEND 7.REFER TO A001 FOR DETAILED PROJECT NOTES & BEST PRACTICES 8.BUILDING MASSING/ENVELOPE TO REMAIN, UNO. SDCM DR WND KEY PLAN NNNA8.02 13 4 2 A8.026 5 08.1 08.2 08-D 08-C 08-B 08-A MAIN 08.1 BATH 08.2 BUILDING ELEVATION - NORTH 1/4" = 1'-0"4 BUILDING ELEVATION - EAST 1/4" = 1'-0"2 BUILDING ELEVATION - SOUTH 1/4" = 1'-0"3 BUILDING ELEVATION - WEST 1/4" = 1'-0"1 REPLACE ALL WINDOWS, TYP. DEMO ALL (E) FIXTUERS + FINISHES P-X P-XP-X #8 (E) STORAGE (N) DECK5'-112"2'-338"Exhibit 1 - Page 51 of 80 2x WALL CONSTRUCTION MASONRY WALL CONSTRCUTION SMOKE/CO2 DETECTOR EXHAUST FAN WINDOW TAG DOOR TAG 6113 13th Avenue South, Seattle, Washington 98108 206 545 8434 NOT FOR CONSTRUCTION HOEDEMAKER ISSUE DATEBLAKE LODGEPFEIFFER 10 BEACH DRIVENORDLAND, WA.98358This document contains information proprietary to Hoedemaker Pfeiffer, LLC and is furnished in confidence for the limited purpose of evaluation, bidding, or review. This document or its contents may not be used for any other purpose and may not be reproduced or disclosed to others without the pre-written consent of Hoedemaker Pfeiffer, LLC. All rights reserved. Copyright 2019. 1/2" = 1'-0" A8.02 CABIN 08 FLOOR PLANS LEGEND GENERAL NOTES 1.DO NOT SCALE DRAWINGS, REFER TO DIMENSIONS SHOWN. 2.CONTACT ARCHITECT FOR ANY MISSING DIMENSIONS OR INFORMATION 3.ALL DIMENSIONS ARE TO FACE OF FRAMING, UNLESS NOTED OTHERWISE 4.ROUGH CARPENTER TO COORDINATE FRAMING LAYOUT WITH LIGHTING, PLUMBING & MECHANICAL PLANS. INFORM ARCHITECT OF ANY DISCREPANCIES 5. SEE A800-A802 WINDOW & DOOR SCHEDULES FOR UNIT SIZES 6.SEE COVER SHEET FOR TYPICAL ABBREVIATIONS & LEGEND 7.REFER TO A001 FOR DETAILED PROJECT NOTES & BEST PRACTICES 8.BUILDING MASSING/ENVELOPE TO REMAIN, UNO. SDCM DR WND ELEVATION X 1/2" = 1'-0"1ELEVATION X 1/2" = 1'-0"2 ELEVATION X 1/2" = 1'-0"5 ELEVATION X 1/2" = 1'-0"3ELEVATION X 1/2" = 1'-0"4ELEVATION X 1/2" = 1'-0"6 P-X T-XT-X P-X P-X P-X P-X Exhibit 1 - Page 52 of 80 2x WALL CONSTRUCTION MASONRY WALL CONSTRCUTION SMOKE/CO2 DETECTOR EXHAUST FAN WINDOW TAG DOOR TAG 6113 13th Avenue South, Seattle, Washington 98108 206 545 8434 NOT FOR CONSTRUCTION HOEDEMAKER ISSUE DATEBLAKE LODGEPFEIFFER 10 BEACH DRIVENORDLAND, WA.98358This document contains information proprietary to Hoedemaker Pfeiffer, LLC and is furnished in confidence for the limited purpose of evaluation, bidding, or review. This document or its contents may not be used for any other purpose and may not be reproduced or disclosed to others without the pre-written consent of Hoedemaker Pfeiffer, LLC. All rights reserved. Copyright 2019. LEVEL 1 DEMO PLAN 1/4" = 1'-0"6 PROPOSED LEVEL 1 FLOOR PLAN 1/4" = 1'-0"5 1/4" = 1'-0" A9.01 CABIN 09 FLOOR PLANS LEGEND GENERAL NOTES 1.DO NOT SCALE DRAWINGS, REFER TO DIMENSIONS SHOWN. 2.CONTACT ARCHITECT FOR ANY MISSING DIMENSIONS OR INFORMATION 3.ALL DIMENSIONS ARE TO FACE OF FRAMING, UNLESS NOTED OTHERWISE 4.ROUGH CARPENTER TO COORDINATE FRAMING LAYOUT WITH LIGHTING, PLUMBING & MECHANICAL PLANS. INFORM ARCHITECT OF ANY DISCREPANCIES 5. SEE A800-A802 WINDOW & DOOR SCHEDULES FOR UNIT SIZES 6.SEE COVER SHEET FOR TYPICAL ABBREVIATIONS & LEGEND 7.REFER TO A001 FOR DETAILED PROJECT NOTES & BEST PRACTICES 8.BUILDING MASSING/ENVELOPE TO REMAIN, UNO. SDCM DR WND KEY PLAN NNNA9.02 13 4 2 A9.026 5 MAIN 09.1 (R) BATH 09.2 09.1 09.2 09-E 09-D 09-C 09-B 09-A BUILDING ELEVATION - NORTH 1/4" = 1'-0"4 BUILDING ELEVATION - EAST 1/4" = 1'-0"2 BUILDING ELEVATION - SOUTH 1/4" = 1'-0"3 BUILDING ELEVATION - WEST 1/4" = 1'-0"1 REPLACE ALL WINDOWS, TYP. DEMO ALL (E) FIXTUERS + FINISHES P-X P-XP-X #9 (N) DECK5'-158"Exhibit 1 - Page 53 of 80 2x WALL CONSTRUCTION MASONRY WALL CONSTRCUTION SMOKE/CO2 DETECTOR EXHAUST FAN WINDOW TAG DOOR TAG 6113 13th Avenue South, Seattle, Washington 98108 206 545 8434 NOT FOR CONSTRUCTION HOEDEMAKER ISSUE DATEBLAKE LODGEPFEIFFER 10 BEACH DRIVENORDLAND, WA.98358This document contains information proprietary to Hoedemaker Pfeiffer, LLC and is furnished in confidence for the limited purpose of evaluation, bidding, or review. This document or its contents may not be used for any other purpose and may not be reproduced or disclosed to others without the pre-written consent of Hoedemaker Pfeiffer, LLC. All rights reserved. Copyright 2019. 1/2" = 1'-0" A9.02 CABIN 09 FLOOR PLANS LEGEND GENERAL NOTES 1.DO NOT SCALE DRAWINGS, REFER TO DIMENSIONS SHOWN. 2.CONTACT ARCHITECT FOR ANY MISSING DIMENSIONS OR INFORMATION 3.ALL DIMENSIONS ARE TO FACE OF FRAMING, UNLESS NOTED OTHERWISE 4.ROUGH CARPENTER TO COORDINATE FRAMING LAYOUT WITH LIGHTING, PLUMBING & MECHANICAL PLANS. INFORM ARCHITECT OF ANY DISCREPANCIES 5. SEE A800-A802 WINDOW & DOOR SCHEDULES FOR UNIT SIZES 6.SEE COVER SHEET FOR TYPICAL ABBREVIATIONS & LEGEND 7.REFER TO A001 FOR DETAILED PROJECT NOTES & BEST PRACTICES 8.BUILDING MASSING/ENVELOPE TO REMAIN, UNO. SDCM DR WND ELEVATION X 1/2" = 1'-0"1ELEVATION X 1/2" = 1'-0"2 ELEVATION X 1/2" = 1'-0"5 ELEVATION X 1/2" = 1'-0"3ELEVATION X 1/2" = 1'-0"4ELEVATION X 1/2" = 1'-0"6 P-X T-XT-X P-X P-X P-X P-X Exhibit 1 - Page 54 of 80 2x WALL CONSTRUCTION MASONRY WALL CONSTRCUTION SMOKE/CO2 DETECTOR EXHAUST FAN WINDOW TAG DOOR TAG 6113 13th Avenue South, Seattle, Washington 98108 206 545 8434 NOT FOR CONSTRUCTION HOEDEMAKER ISSUE DATEBLAKE LODGEPFEIFFER 10 BEACH DRIVENORDLAND, WA.98358This document contains information proprietary to Hoedemaker Pfeiffer, LLC and is furnished in confidence for the limited purpose of evaluation, bidding, or review. This document or its contents may not be used for any other purpose and may not be reproduced or disclosed to others without the pre-written consent of Hoedemaker Pfeiffer, LLC. All rights reserved. Copyright 2019. LEVEL 1 DEMO PLAN3 PROPOSED LEVEL 1 FLOOR PLAN1 LEVEL 2 DEMO PLAN4 PROPOSED LEVEL 2 FLOOR PLAN2 1/4" = 1'-0" A10.01 CABIN 10 FLOOR PLANS LEGEND GENERAL NOTES 1.DO NOT SCALE DRAWINGS, REFER TO DIMENSIONS SHOWN. 2.CONTACT ARCHITECT FOR ANY MISSING DIMENSIONS OR INFORMATION 3.ALL DIMENSIONS ARE TO FACE OF FRAMING, UNLESS NOTED OTHERWISE 4.ROUGH CARPENTER TO COORDINATE FRAMING LAYOUT WITH LIGHTING, PLUMBING & MECHANICAL PLANS. INFORM ARCHITECT OF ANY DISCREPANCIES 5. SEE A800-A802 WINDOW & DOOR SCHEDULES FOR UNIT SIZES 6.SEE COVER SHEET FOR TYPICAL ABBREVIATIONS & LEGEND 7.REFER TO A001 FOR DETAILED PROJECT NOTES & BEST PRACTICES 8.BUILDING MASSING/ENVELOPE TO REMAIN, UNO. SDCM DR WND KEY PLAN N N N N N A10.03 42 1 3 A10.03 6 5 7 MAIN 10.1 (E) BEDROOM 10.2 (R) BATH 10.3 (E) BEDROOM 10.4 (R) BATH 10.5 10-1 10-3 10-2 10-5 10-4 10-7 10-I 10-H 10-G 10-F 10-J 10-K 10-A10-B 10-E 10-D10-C 10-6 REPLACE ALL WINDOWS, TYP. REMOVE FLUE REPLACE ALL WINDOWS, TYP. DEMO ALL (E) FIXTUERS + FINISHES DEMO ALL (E) FIXTUERS + FINISHES P-X P-X P-X P-X P-X P-X #10 3'-5" 4'-3" 5'-2" 5'-11" 5'-3" 5'-0" 6'-8" (E) DECK 5'-0" 2'-11"4'-0"71 2"1012"2'-4"3'-5"2'-8"5'-41 2"2'-81 2"2'-61 2"2'-6"4'-212"8'-0"2'-1114"1'-1" 2'-8"5'-612"3'-6"2'-0"4'-0" 1'-4"2'-6"1'-8" 3'-0" 2'-101 2"2'-0"2'-4"1012"Exhibit 1 - Page 55 of 80 6113 13th Avenue South, Seattle, Washington 98108 206 545 8434 NOT FOR CONSTRUCTION HOEDEMAKER ISSUE DATEBLAKE LODGEPFEIFFER 10 BEACH DRIVENORDLAND, WA.98358This document contains information proprietary to Hoedemaker Pfeiffer, LLC and is furnished in confidence for the limited purpose of evaluation, bidding, or review. This document or its contents may not be used for any other purpose and may not be reproduced or disclosed to others without the pre-written consent of Hoedemaker Pfeiffer, LLC. All rights reserved. Copyright 2019. 1/4" = 1'-0" A10.02 CABIN 10 ELEVATIONS & DETAILS BUILDING ELEVATION - EAST2BUILDING ELEVATION - NORTH4 BUILDING ELEVATION - WEST1BUILDING ELEVATION - SOUTH3 (N) EXTERIOR SHOWER (N) EXTERIOR SHOWER Exhibit 1 - Page 56 of 80 6113 13th Avenue South, Seattle, Washington 98108 206 545 8434 NOT FOR CONSTRUCTION HOEDEMAKER ISSUE DATEBLAKE LODGEPFEIFFER 10 BEACH DRIVENORDLAND, WA.98358This document contains information proprietary to Hoedemaker Pfeiffer, LLC and is furnished in confidence for the limited purpose of evaluation, bidding, or review. This document or its contents may not be used for any other purpose and may not be reproduced or disclosed to others without the pre-written consent of Hoedemaker Pfeiffer, LLC. All rights reserved. Copyright 2019. GENERAL NOTES 1.DO NOT SCALE DRAWINGS, REFER TO DIMENSIONS SHOWN. 2.CONTACT ARCHITECT FOR ANY MISSING DIMENSIONS OR INFORMATION 3.ALL DIMENSIONS ARE TO FACE OF FRAMING, UNLESS NOTED OTHERWISE 4.ROUGH CARPENTER TO COORDINATE FRAMING LAYOUT WITH LIGHTING, PLUMBING & MECHANICAL PLANS. INFORM ARCHITECT OF ANY DISCREPANCIES 5. SEE A800-A802 WINDOW & DOOR SCHEDULES FOR UNIT SIZES 6.SEE COVER SHEET FOR TYPICAL ABBREVIATIONS & LEGEND 7.REFER TO A001 FOR DETAILED PROJECT NOTES & BEST PRACTICES ELEVATION X1 1/2" = 1'-0" A10.03 CABIN 10 ELEVATIONS & DETAILS ELEVATION X2 ELEVATION X3ELEVATION X4 ELEVATION X5ELEVATION X6ELEVATION X7 P-X T-X T-X T-X Exhibit 1 - Page 57 of 80 2x WALL CONSTRUCTION MASONRY WALL CONSTRCUTION SMOKE/CO2 DETECTOR EXHAUST FAN WINDOW TAG DOOR TAG 6113 13th Avenue South, Seattle, Washington 98108 206 545 8434 NOT FOR CONSTRUCTION HOEDEMAKER ISSUE DATEBLAKE LODGEPFEIFFER 10 BEACH DRIVENORDLAND, WA.98358This document contains information proprietary to Hoedemaker Pfeiffer, LLC and is furnished in confidence for the limited purpose of evaluation, bidding, or review. This document or its contents may not be used for any other purpose and may not be reproduced or disclosed to others without the pre-written consent of Hoedemaker Pfeiffer, LLC. All rights reserved. Copyright 2019. LEVEL 2 DEMO PLAN2 1/4" = 1'-0" A12.01 LODGE LEVEL 02 FLOOR PLANS PROPOSED LEVEL 2 PLAN1 LEGEND GENERAL NOTES 1.DO NOT SCALE DRAWINGS, REFER TO DIMENSIONS SHOWN. 2.CONTACT ARCHITECT FOR ANY MISSING DIMENSIONS OR INFORMATION 3.ALL DIMENSIONS ARE TO FACE OF FRAMING, UNLESS NOTED OTHERWISE 4.ROUGH CARPENTER TO COORDINATE FRAMING LAYOUT WITH LIGHTING, PLUMBING & MECHANICAL PLANS. INFORM ARCHITECT OF ANY DISCREPANCIES 5. SEE A800-A802 WINDOW & DOOR SCHEDULES FOR UNIT SIZES 6.SEE COVER SHEET FOR TYPICAL ABBREVIATIONS & LEGEND 7.REFER TO A001 FOR DETAILED PROJECT NOTES & BEST PRACTICES SDCM DR WND KEY PLAN N A12.02 57 4 6 A12.022 3 1 MAIN 12.01 KITCHEN 12.02 12.2 12.1 12.3 12.4 12.5 12-B 12-A 12-E12-D 12-C REPLACE ALL WINDOWS, TYP. LODGEN N13'-111 2"28'-1012"12'-0"3'-712"6"3'-0"6"5"3'-0"Exhibit 1 - Page 58 of 80 6113 13th Avenue South, Seattle, Washington 98108 206 545 8434 NOT FOR CONSTRUCTION HOEDEMAKER ISSUE DATEBLAKE LODGEPFEIFFER 10 BEACH DRIVENORDLAND, WA.98358This document contains information proprietary to Hoedemaker Pfeiffer, LLC and is furnished in confidence for the limited purpose of evaluation, bidding, or review. This document or its contents may not be used for any other purpose and may not be reproduced or disclosed to others without the pre-written consent of Hoedemaker Pfeiffer, LLC. All rights reserved. Copyright 2019. 1/4" = 1'-0" A12.03 LODGE LEVEL 02 ELEVATIONS GENERAL NOTES 1.DO NOT SCALE DRAWINGS, REFER TO DIMENSIONS SHOWN. 2.CONTACT ARCHITECT FOR ANY MISSING DIMENSIONS OR INFORMATION 3.ALL DIMENSIONS ARE TO FACE OF FRAMING, UNLESS NOTED OTHERWISE 4.ROUGH CARPENTER TO COORDINATE FRAMING LAYOUT WITH LIGHTING, PLUMBING & MECHANICAL PLANS. INFORM ARCHITECT OF ANY DISCREPANCIES 5. SEE A800-A802 WINDOW & DOOR SCHEDULES FOR UNIT SIZES 6.SEE COVER SHEET FOR TYPICAL ABBREVIATIONS & LEGEND 7.REFER TO A001 FOR DETAILED PROJECT NOTES & BEST PRACTICES BUILDING ELEVATION - SOUTH 1/4" = 1'-0"3 BUILDING ELEVATION - NORTH 1/4" = 1'-0"4 BUILDING ELEVATION - WEST 1/4" = 1'-0"1 BUILDING ELEVATION - EAST 1/4" = 1'-0"2 Exhibit 1 - Page 59 of 80 6113 13th Avenue South, Seattle, Washington 98108 206 545 8434 NOT FOR CONSTRUCTION HOEDEMAKER ISSUE DATEBLAKE LODGEPFEIFFER 10 BEACH DRIVENORDLAND, WA.98358This document contains information proprietary to Hoedemaker Pfeiffer, LLC and is furnished in confidence for the limited purpose of evaluation, bidding, or review. This document or its contents may not be used for any other purpose and may not be reproduced or disclosed to others without the pre-written consent of Hoedemaker Pfeiffer, LLC. All rights reserved. Copyright 2019. 1/2" = 1'-0" A12.02 LODGE LEVEL 02 ELEVATIONS ELEVATION X 1/2" = 1'-0"1 GENERAL NOTES 1.DO NOT SCALE DRAWINGS, REFER TO DIMENSIONS SHOWN. 2.CONTACT ARCHITECT FOR ANY MISSING DIMENSIONS OR INFORMATION 3.ALL DIMENSIONS ARE TO FACE OF FRAMING, UNLESS NOTED OTHERWISE 4.ROUGH CARPENTER TO COORDINATE FRAMING LAYOUT WITH LIGHTING, PLUMBING & MECHANICAL PLANS. INFORM ARCHITECT OF ANY DISCREPANCIES 5. SEE A800-A802 WINDOW & DOOR SCHEDULES FOR UNIT SIZES 6.SEE COVER SHEET FOR TYPICAL ABBREVIATIONS & LEGEND 7.REFER TO A001 FOR DETAILED PROJECT NOTES & BEST PRACTICES ELEVATION X 1/2" = 1'-0"2ELEVATION X 1/2" = 1'-0"3 ELEVATION X 1/2" = 1'-0"4ELEVATION X 1/2" = 1'-0"5 ELEVATION X 1/2" = 1'-0"6ELEVATION X 1/2" = 1'-0"7 Exhibit 1 - Page 60 of 80 2x WALL CONSTRUCTION MASONRY WALL CONSTRCUTION SMOKE/CO2 DETECTOR EXHAUST FAN WINDOW TAG DOOR TAG 6113 13th Avenue South, Seattle, Washington 98108 206 545 8434 NOT FOR CONSTRUCTION HOEDEMAKER ISSUE DATEBLAKE LODGEPFEIFFER 10 BEACH DRIVENORDLAND, WA.98358This document contains information proprietary to Hoedemaker Pfeiffer, LLC and is furnished in confidence for the limited purpose of evaluation, bidding, or review. This document or its contents may not be used for any other purpose and may not be reproduced or disclosed to others without the pre-written consent of Hoedemaker Pfeiffer, LLC. All rights reserved. Copyright 2019. AS INDICATED A13.01 PENTHOUSE FLOOR PLAN LEVEL 2 DEMO PLAN 1/4" = 1'-0"2 PROPOSED LEVEL 2 FLOOR PLAN 1/4" = 1'-0"1 LEGEND GENERAL NOTES 1.DO NOT SCALE DRAWINGS, REFER TO DIMENSIONS SHOWN. 2.CONTACT ARCHITECT FOR ANY MISSING DIMENSIONS OR INFORMATION 3.ALL DIMENSIONS ARE TO FACE OF FRAMING, UNLESS NOTED OTHERWISE 4.ROUGH CARPENTER TO COORDINATE FRAMING LAYOUT WITH LIGHTING, PLUMBING & MECHANICAL PLANS. INFORM ARCHITECT OF ANY DISCREPANCIES 5. SEE A800-A802 WINDOW & DOOR SCHEDULES FOR UNIT SIZES 6.SEE COVER SHEET FOR TYPICAL ABBREVIATIONS & LEGEND 7.REFER TO A001 FOR DETAILED PROJECT NOTES & BEST PRACTICES SDCM DR WND KEY PLAN N ELEVATION X 1/2" = 1'-0"1ELEVATION X 1/2" = 1'-0"2 ELEVATION X 1/2" = 1'-0"3ELEVATION X 1/2" = 1'-0"4ELEVATION X 1/2" = 1'-0"5 A13.01 42 3 1 A13.01 5 MAIN 13.1 (N) BEDROOM 13.2 (N) BATH 13.3 13.1-1 13.1-2 13.1-3 13.1-4 13.3-1 13.1A13.1B13.1C 13.1D 13.1E 13.1F 13.3A 16'-3" 5'-31 8"8'-1"10'-6"4"Exhibit 1 - Page 61 of 80 MARROWSTONE INN NORDLAND, WA PRE APP MEETING MAY 12, 2021 Exhibit 1 - Page 62 of 80 MARROWSTONE INN 2 HOEDEMAKER PFEIFFER GLAMPING GLAMPING What are the limitations with Glamping on the prop- erty and does adding the temporary structures fall under Jefferson County Code sections dealing with nonconforming uses and structures (JCC 18.20.260) a. There are both non conforming uses and structures – Section 3 of JCC 18.20.260 applies to the subject property b. If the use and/or the structures are expanded, does a UDC Type permit approval allow for the type of expansion requested? c. Can platforms be built to allow for seasonal glamp- ing tents? Total Property is ~11.5 Acres including deeded tidelands Exhibit 1 - Page 63 of 80 MARROWSTONE INN 3 HOEDEMAKER PFEIFFER ADDITIONS - WATERWARD WITHIN 150’ BUFFER CABIN 2 E.P. 2x WALL CONSTRUCTION MASONRY WALL CONSTRCUTION SMOKE/CO2 DETECTOR EXHAUST FAN WINDOW TAG DOOR TAG 6113 13th Avenue South, Seattle, Washington 98108 206 545 8434 NOT FOR CONSTRUCTION This document contains information proprietary to Hoedemaker Pfeiffer, LLC and is furnished in confidence for the limited purpose of evaluation, bidding, or review. This document or its contents may not be used for any other purpose and may not be reproduced or disclosed to others without the pre-written consent of Hoedemaker Pfeiffer, LLC. All rights reserved. Copyright 2019. LEVEL 1 DEMO PLAN 1/4" = 1'-0"6 PROPOSED LEVEL 1 FLOOR PLAN 1/4" = 1'-0"5 1/4" = 1'-0" A2.01 CABIN 02 FLOOR PLANS LEGEND GENERAL NOTES 1.DO NOT SCALE DRAWINGS, REFER TO DIMENSIONS SHOWN. 2.CONTACT ARCHITECT FOR ANY MISSING DIMENSIONS OR INFORMATION 3.ALL DIMENSIONS ARE TO FACE OF FRAMING, UNLESS NOTED OTHERWISE 4.ROUGH CARPENTER TO COORDINATE FRAMING LAYOUT WITH LIGHTING, PLUMBING & MECHANICAL PLANS. INFORM ARCHITECT OF ANY DISCREPANCIES 5. SEE A800-A802 WINDOW & DOOR SCHEDULES FOR UNIT SIZES 6.SEE COVER SHEET FOR TYPICAL ABBREVIATIONS & LEGEND 7.REFER TO A001 FOR DETAILED PROJECT NOTES & BEST PRACTICES 8.BUIDING MASSING/ENVELOPE TO REMAIN, UNO. SDCM DR WND KEY PLAN N N N A2.01 4 3 A2.011 2 MAIN 02.1 (N) BATH 02.2 (E) BEDROOM 02.3 02-1 02-4 02-5 02-3 02-2 02-A 02-C02-B BUILDING ELEVATION - SOUTH 1/4" = 1'-0"2 BUILDING ELEVATION - NORTH 1/4" = 1'-0"1 BUILDING ELEVATION - WEST 1/4" = 1'-0"4 BUILDING ELEVATION - EAST 1/4" = 1'-0"3 21 2" P-X P-X P-X ENTRY 02.4 2'-31 2"2'-8"4"6"2'-8"3'-812"3'-0"10'-21 2" E.P. 2x WALL CONSTRUCTION MASONRY WALL CONSTRCUTION SMOKE/CO2 DETECTOR EXHAUST FAN WINDOW TAG DOOR TAG 6113 13th Avenue South, Seattle, Washington 98108 206 545 8434 NOT FOR CONSTRUCTION This document contains information proprietary to Hoedemaker Pfeiffer, LLC and is furnished in confidence for the limited purpose of evaluation, bidding, or review. This document or its contents may not be used for any other purpose and may not be reproduced or disclosed to others without the pre-written consent of Hoedemaker Pfeiffer, LLC. All rights reserved. Copyright 2019. LEVEL 1 DEMO PLAN 1/4" = 1'-0"6 PROPOSED LEVEL 1 FLOOR PLAN 1/4" = 1'-0"5 1/4" = 1'-0" A2.01 CABIN 02 FLOOR PLANS LEGEND GENERAL NOTES 1.DO NOT SCALE DRAWINGS, REFER TO DIMENSIONS SHOWN. 2.CONTACT ARCHITECT FOR ANY MISSING DIMENSIONS OR INFORMATION 3.ALL DIMENSIONS ARE TO FACE OF FRAMING, UNLESS NOTED OTHERWISE 4.ROUGH CARPENTER TO COORDINATE FRAMING LAYOUT WITH LIGHTING, PLUMBING & MECHANICAL PLANS. INFORM ARCHITECT OF ANY DISCREPANCIES 5. SEE A800-A802 WINDOW & DOOR SCHEDULES FOR UNIT SIZES 6.SEE COVER SHEET FOR TYPICAL ABBREVIATIONS & LEGEND 7.REFER TO A001 FOR DETAILED PROJECT NOTES & BEST PRACTICES 8.BUIDING MASSING/ENVELOPE TO REMAIN, UNO. SDCM DR WND KEY PLAN N N N A2.01 4 3 A2.011 2 MAIN 02.1 (N) BATH 02.2 (E) BEDROOM 02.3 02-1 02-4 02-5 02-3 02-2 02-A 02-C02-B BUILDING ELEVATION - SOUTH 1/4" = 1'-0"2 BUILDING ELEVATION - NORTH 1/4" = 1'-0"1 BUILDING ELEVATION - WEST 1/4" = 1'-0"4 BUILDING ELEVATION - EAST 1/4" = 1'-0"3 21 2" P-X P-X P-X ENTRY 02.4 2'-31 2"2'-8"4"6"2'-8"3'-812"3'-0"10'-21 2" ENTRY PUSHED TOWARDS WATER RESTRICTIONS/PROCESS FOR WATERWAR EXPANSION Moving entry locations Expanding decks Exhibit 1 - Page 64 of 80 MARROWSTONE INN 4 HOEDEMAKER PFEIFFER E.P.2x WALL CONSTRUCTIONMASONRY WALL CONSTRCUTIONSMOKE/CO2 DETECTOREXHAUST FANWINDOW TAG DOOR TAG 6113 13th Avenue South,Seattle, Washington 98108206 545 8434 NOT FOR CONSTRUCTION This document contains information proprietary to Hoedemaker Pfeiffer, LLC and is furnished in confidence for the limited purpose of evaluation, bidding, or review. This document or its contents may not be used for any other purpose and may not be reproduced or disclosed to others without the pre-written consent of Hoedemaker Pfeiffer, LLC. All rights reserved. Copyright 2019. LEVEL 1 DEMO PLAN3 PROPOSED LEVEL 1 FLOOR PLAN1 LEVEL 2 DEMO PLAN4 PROPOSED LEVEL 2 FLOOR PLAN2 1/4" = 1'-0" A3.01 CABIN 03 FLOOR PLANS LEGENDGENERAL NOTES1.DO NOT SCALE DRAWINGS, REFER TO DIMENSIONSSHOWN.2.CONTACT ARCHITECT FOR ANY MISSINGDIMENSIONS OR INFORMATION3.ALL DIMENSIONS ARE TO FACE OF FRAMING,UNLESS NOTED OTHERWISE4.ROUGH CARPENTER TO COORDINATE FRAMINGLAYOUT WITH LIGHTING, PLUMBING &MECHANICAL PLANS. INFORM ARCHITECT OF ANYDISCREPANCIES5. SEE A800-A802 WINDOW & DOOR SCHEDULESFOR UNIT SIZES6.SEE COVER SHEET FOR TYPICAL ABBREVIATIONS &LEGEND7.REFER TO A001 FOR DETAILED PROJECT NOTES &BEST PRACTICES8.BUILDING MASSING/ENVELOPE TO REMAIN, UNO.SDCM DR WND KEY PLAN N NNNNA3.024 5 A3.02 1 7 A3.02 3 A3.02 2 A3.02 6 MAIN 03.2 KITCHEN 03.3 (N) BEDROOM 03.5 (N) BATH 03.6 (N) SLEEPING PORCH 03.1 (E) BEDROOM03.7 (E) BATH 03.4 03-1 03-3 03-4 03-5 03-8 03-7 03-B 03-A 03-F 03-E 03-D03-C 03-H 03-G 03-6 03-2 5'-2"2'-8"12'-0"P-X P-X P-X P-X P-X ATTIC 4'-51 2"4'-0"4'-912"412"2'-4"2'-51 2"10'-3"3'-3"3'-11 2" 2'-0"5'-2" 6'-5" 2'-6"2'-4"2'-10"3'-412"2'-612"2'-5"2'-6"3'-4"4"17'-0"E.P.2x WALL CONSTRUCTION MASONRY WALL CONSTRCUTION SMOKE/CO2 DETECTOR EXHAUST FAN WINDOW TAG DOOR TAG 6113 13th Avenue South, Seattle, Washington 98108 206 545 8434 NOT FOR CONSTRUCTION This document contains information proprietary to Hoedemaker Pfeiffer, LLC and is furnished in confidence for the limited purpose of evaluation, bidding, or review. This document or its contents may not be used for any other purpose and may not be reproduced or disclosed to others without the pre-written consent of Hoedemaker Pfeiffer, LLC. All rights reserved. Copyright 2019. LEVEL 1 DEMO PLAN3 PROPOSED LEVEL 1 FLOOR PLAN1 LEVEL 2 DEMO PLAN4 PROPOSED LEVEL 2 FLOOR PLAN2 1/4" = 1'-0" A3.01 CABIN 03 FLOOR PLANS LEGEND GENERAL NOTES 1.DO NOT SCALE DRAWINGS, REFER TO DIMENSIONS SHOWN. 2.CONTACT ARCHITECT FOR ANY MISSING DIMENSIONS OR INFORMATION 3.ALL DIMENSIONS ARE TO FACE OF FRAMING, UNLESS NOTED OTHERWISE 4.ROUGH CARPENTER TO COORDINATE FRAMING LAYOUT WITH LIGHTING, PLUMBING & MECHANICAL PLANS. INFORM ARCHITECT OF ANY DISCREPANCIES 5. SEE A800-A802 WINDOW & DOOR SCHEDULES FOR UNIT SIZES 6.SEE COVER SHEET FOR TYPICAL ABBREVIATIONS & LEGEND 7.REFER TO A001 FOR DETAILED PROJECT NOTES & BEST PRACTICES 8.BUILDING MASSING/ENVELOPE TO REMAIN, UNO. SDCM DR WND KEY PLAN N NNNNA3.024 5 A3.02 1 7 A3.02 3 A3.02 2 A3.02 6 MAIN 03.2 KITCHEN 03.3 (N) BEDROOM 03.5 (N) BATH 03.6 (N) SLEEPING PORCH 03.1 (E) BEDROOM 03.7 (E) BATH 03.4 03-1 03-3 03-4 03-5 03-8 03-7 03-B 03-A 03-F 03-E 03-D03-C 03-H 03-G 03-6 03-2 5'-2"2'-8"12'-0"P-X P-X P-X P-X P-X ATTIC 4'-51 2"4'-0"4'-91 2"412"2'-4"2'-51 2"10'-3"3'-3"3'-11 2" 2'-0"5'-2" 6'-5" 2'-6"2'-4"2'-10"3'-412"2'-612"2'-5"2'-6"3'-4"4"17'-0"ADDITIONS - WATERWARD WITHIN 150’ BUFFER CABIN 3 ENTRY MOVED LATERALLY TO NEW LOCATION RESTRICTIONS/PROCESS FOR WATERWAR EXPANSION Moving entry locations Expanding decks Exhibit 1 - Page 65 of 80 MARROWSTONE INN 5 HOEDEMAKER PFEIFFER 2x WALL CONSTRUCTION MASONRY WALL CONSTRCUTION SMOKE/CO2 DETECTOR EXHAUST FAN WINDOW TAG DOOR TAG 6113 13th Avenue South, Seattle, Washington 98108 206 545 8434 NOT FOR CONSTRUCTION This document contains information proprietary to Hoedemaker Pfeiffer, LLC and is furnished in confidence for the limited purpose of evaluation, bidding, or review. This document or its contents may not be used for any other purpose and may not be reproduced or disclosed to others without the pre-written consent of Hoedemaker Pfeiffer, LLC. All rights reserved. Copyright 2019. LEVEL 1 DEMO PLAN 1/4" = 1'-0"6 PROPOSED LEVEL 1 FLOOR PLAN 1/4" = 1'-0"5 1/4" = 1'-0" A5.01 CABIN 05 FLOOR PLANS LEGEND GENERAL NOTES 1.DO NOT SCALE DRAWINGS, REFER TO DIMENSIONS SHOWN. 2.CONTACT ARCHITECT FOR ANY MISSING DIMENSIONS OR INFORMATION 3.ALL DIMENSIONS ARE TO FACE OF FRAMING, UNLESS NOTED OTHERWISE 4.ROUGH CARPENTER TO COORDINATE FRAMING LAYOUT WITH LIGHTING, PLUMBING & MECHANICAL PLANS. INFORM ARCHITECT OF ANY DISCREPANCIES 5. SEE A800-A802 WINDOW & DOOR SCHEDULES FOR UNIT SIZES 6.SEE COVER SHEET FOR TYPICAL ABBREVIATIONS & LEGEND 7.REFER TO A001 FOR DETAILED PROJECT NOTES & BEST PRACTICES 8.BUILDING MASSING/ENVELOPE TO REMAIN, UNO. SDCM DR WND KEY PLAN N N N A5.02 32 1 A5.02 4 A5.02 5 MAIN 05.1 (N) BEDROOM 05.2 (R) BATH 05.3 05.3 05.4 05.1 05.2 05-H 05-G 05-F05-E05-D 05-B 05-C 05-A BUILDING ELEVATION - NORTH 1/4" = 1'-0"2 BUILDING ELEVATION - SOUTH 1/4" = 1'-0"1 BUILDING ELEVATION - WEST 1/4" = 1'-0"4 BUILDING ELEVATION - EAST 1/4" = 1'-0"3 P-X P-X P-X (R) BATH 05.3 12'-41 4"12'-518"3'-13 8" 3'-10"3'-4" 7'-111 4"5'-6"3'-918"2x WALL CONSTRUCTION MASONRY WALL CONSTRCUTION SMOKE/CO2 DETECTOR EXHAUST FAN WINDOW TAG DOOR TAG 6113 13th Avenue South, Seattle, Washington 98108 206 545 8434 NOT FOR CONSTRUCTION This document contains information proprietary to Hoedemaker Pfeiffer, LLC and is furnished in confidence for the limited purpose of evaluation, bidding, or review. This document or its contents may not be used for any other purpose and may not be reproduced or disclosed to others without the pre-written consent of Hoedemaker Pfeiffer, LLC. All rights reserved. Copyright 2019. LEVEL 1 DEMO PLAN 1/4" = 1'-0"6 PROPOSED LEVEL 1 FLOOR PLAN 1/4" = 1'-0"5 1/4" = 1'-0" A5.01 CABIN 05 FLOOR PLANS LEGEND GENERAL NOTES 1.DO NOT SCALE DRAWINGS, REFER TO DIMENSIONS SHOWN. 2.CONTACT ARCHITECT FOR ANY MISSING DIMENSIONS OR INFORMATION 3.ALL DIMENSIONS ARE TO FACE OF FRAMING, UNLESS NOTED OTHERWISE 4.ROUGH CARPENTER TO COORDINATE FRAMING LAYOUT WITH LIGHTING, PLUMBING & MECHANICAL PLANS. INFORM ARCHITECT OF ANY DISCREPANCIES 5. SEE A800-A802 WINDOW & DOOR SCHEDULES FOR UNIT SIZES 6.SEE COVER SHEET FOR TYPICAL ABBREVIATIONS & LEGEND 7.REFER TO A001 FOR DETAILED PROJECT NOTES & BEST PRACTICES 8.BUILDING MASSING/ENVELOPE TO REMAIN, UNO. SDCM DR WND KEY PLAN N N N A5.02 32 1 A5.02 4 A5.02 5 MAIN 05.1 (N) BEDROOM 05.2 (R) BATH 05.3 05.3 05.4 05.1 05.2 05-H 05-G 05-F05-E05-D 05-B 05-C 05-A BUILDING ELEVATION - NORTH 1/4" = 1'-0"2 BUILDING ELEVATION - SOUTH 1/4" = 1'-0"1 BUILDING ELEVATION - WEST 1/4" = 1'-0"4 BUILDING ELEVATION - EAST 1/4" = 1'-0"3 P-X P-X P-X (R) BATH 05.3 12'-41 4"12'-518"3'-13 8" 3'-10"3'-4" 7'-111 4"5'-6"3'-918"ADDITIONS - WATERWARD WITHIN 150’ BUFFER CABIN 5 ENTRY PUSHED TOWARDS WATER RESTRICTIONS/PROCESS FOR WATERWAR EXPANSION Moving entry locations Expanding decks Exhibit 1 - Page 66 of 80 MARROWSTONE INN 6 HOEDEMAKER PFEIFFER 2x WALL CONSTRUCTIONMASONRY WALL CONSTRCUTIONSMOKE/CO2 DETECTOREXHAUST FANWINDOW TAGDOOR TAG6113 13th Avenue South,Seattle, Washington 98108206 545 8434NOT FOR CONSTRUCTIONThis document contains informationproprietary to Hoedemaker Pfeiffer, LLC andis furnished in confidence for the limitedpurpose of evaluation, bidding, or review. Thisdocument or its contents may not be used forany other purpose and may not bereproduced or disclosed to others without thepre-written consent of Hoedemaker Pfeiffer,LLC. All rights reserved. Copyright 2019.LEVEL 2 DEMO PLAN21/4" = 1'-0" A12.01LODGE LEVEL02 FLOORPLANSPROPOSED LEVEL 2 PLAN1LEGENDGENERAL NOTES1.DO NOT SCALE DRAWINGS, REFER TO DIMENSIONSSHOWN.2.CONTACT ARCHITECT FOR ANY MISSINGDIMENSIONS OR INFORMATION3.ALL DIMENSIONS ARE TO FACE OF FRAMING,UNLESS NOTED OTHERWISE4.ROUGH CARPENTER TO COORDINATE FRAMINGLAYOUT WITH LIGHTING, PLUMBING &MECHANICAL PLANS. INFORM ARCHITECT OF ANYDISCREPANCIES5. SEE A800-A802 WINDOW & DOOR SCHEDULESFOR UNIT SIZES6.SEE COVER SHEET FOR TYPICAL ABBREVIATIONS &LEGEND7.REFER TO A001 FOR DETAILED PROJECT NOTES &BEST PRACTICESSDCMDRWNDKEY PLANNA12.025746A12.02231MAIN12.01KITCHEN12.0212.212.112.312.412.512-B12-A12-E12-D12-CN N 13'-1112"28'-1012"12'-0"3'-712"6"3'-0"6"5"3'-0"2x WALL CONSTRUCTIONMASONRY WALL CONSTRCUTIONSMOKE/CO2 DETECTOREXHAUST FANWINDOW TAGDOOR TAG6113 13th Avenue South,Seattle, Washington 98108206 545 8434NOT FOR CONSTRUCTIONThis document contains informationproprietary to Hoedemaker Pfeiffer, LLC andis furnished in confidence for the limitedpurpose of evaluation, bidding, or review. Thisdocument or its contents may not be used forany other purpose and may not bereproduced or disclosed to others without thepre-written consent of Hoedemaker Pfeiffer,LLC. All rights reserved. Copyright 2019.LEVEL 2 DEMO PLAN21/4" = 1'-0" A12.01LODGE LEVEL02 FLOORPLANSPROPOSED LEVEL 2 PLAN1LEGENDGENERAL NOTES1.DO NOT SCALE DRAWINGS, REFER TO DIMENSIONSSHOWN.2.CONTACT ARCHITECT FOR ANY MISSINGDIMENSIONS OR INFORMATION3.ALL DIMENSIONS ARE TO FACE OF FRAMING,UNLESS NOTED OTHERWISE4.ROUGH CARPENTER TO COORDINATE FRAMINGLAYOUT WITH LIGHTING, PLUMBING &MECHANICAL PLANS. INFORM ARCHITECT OF ANYDISCREPANCIES5. SEE A800-A802 WINDOW & DOOR SCHEDULESFOR UNIT SIZES6.SEE COVER SHEET FOR TYPICAL ABBREVIATIONS &LEGEND7.REFER TO A001 FOR DETAILED PROJECT NOTES &BEST PRACTICESSDCMDRWNDKEY PLANNA12.025746A12.02231MAIN12.01KITCHEN12.0212.212.112.312.412.512-B12-A12-E12-D12-CN N 13'-1112"28'-1012"12'-0"3'-712"6"3'-0"6"5"3'-0"ADDITIONS - WATERWARD OUTISDE 150’ BUFFER LODGE NEW STAIRCASE WATERWARD RESTRICTIONS/PROCESS FOR WATERWAR EXPANSION Moving entry locations Expanding decks Exhibit 1 - Page 67 of 80 MARROWSTONE INN 7 HOEDEMAKER PFEIFFER TRIGGERS FOR CODE UPGRADES What triggers updates to conform to current code? - Door clearances - Height clearances E.P.2x WALL CONSTRUCTIONMASONRY WALL CONSTRCUTIONSMOKE/CO2 DETECTOR EXHAUST FAN WINDOW TAG DOOR TAG 6113 13th Avenue South,Seattle, Washington 98108206 545 8434 NOT FOR CONSTRUCTION This document contains information proprietary to Hoedemaker Pfeiffer, LLC and is furnished in confidence for the limited purpose of evaluation, bidding, or review. This document or its contents may not be used for any other purpose and may not be reproduced or disclosed to others without the pre-written consent of Hoedemaker Pfeiffer, LLC. All rights reserved. Copyright 2019. LEVEL 1 DEMO PLAN3 PROPOSED LEVEL 1 FLOOR PLAN1 LEVEL 2 DEMO PLAN4 PROPOSED LEVEL 2 FLOOR PLAN2 1/4" = 1'-0" A3.01 CABIN 03 FLOOR PLANS LEGENDGENERAL NOTES1.DO NOT SCALE DRAWINGS, REFER TO DIMENSIONSSHOWN.2.CONTACT ARCHITECT FOR ANY MISSINGDIMENSIONS OR INFORMATION3.ALL DIMENSIONS ARE TO FACE OF FRAMING,UNLESS NOTED OTHERWISE4.ROUGH CARPENTER TO COORDINATE FRAMINGLAYOUT WITH LIGHTING, PLUMBING &MECHANICAL PLANS. INFORM ARCHITECT OF ANYDISCREPANCIES5. SEE A800-A802 WINDOW & DOOR SCHEDULESFOR UNIT SIZES6.SEE COVER SHEET FOR TYPICAL ABBREVIATIONS &LEGEND7.REFER TO A001 FOR DETAILED PROJECT NOTES &BEST PRACTICES8.BUILDING MASSING/ENVELOPE TO REMAIN, UNO.SDCM DR WND KEY PLAN N NNNNA3.024 5 A3.02 1 7 A3.02 3 A3.02 2 A3.02 6 MAIN 03.2 KITCHEN 03.3 (N) BEDROOM 03.5 (N) BATH 03.6 (N) SLEEPING PORCH 03.1 (E) BEDROOM03.7 (E) BATH 03.4 03-1 03-3 03-4 03-5 03-8 03-7 03-B 03-A 03-F 03-E 03-D03-C 03-H 03-G 03-6 03-2 5'-2"2'-8"12'-0"P-X P-X P-X P-X P-X ATTIC 4'-51 2"4'-0"4'-91 2"412"2'-4"2'-51 2"10'-3"3'-3"3'-11 2" 2'-0"5'-2" 6'-5" 2'-6"2'-4"2'-10"3'-412"2'-612"2'-5"2'-6"3'-4"4"17'-0"E.P.2x WALL CONSTRUCTIONMASONRY WALL CONSTRCUTIONSMOKE/CO2 DETECTOR EXHAUST FAN WINDOW TAG DOOR TAG 6113 13th Avenue South,Seattle, Washington 98108206 545 8434 NOT FOR CONSTRUCTION This document contains information proprietary to Hoedemaker Pfeiffer, LLC and is furnished in confidence for the limited purpose of evaluation, bidding, or review. This document or its contents may not be used for any other purpose and may not be reproduced or disclosed to others without the pre-written consent of Hoedemaker Pfeiffer, LLC. All rights reserved. Copyright 2019. LEVEL 1 DEMO PLAN3 PROPOSED LEVEL 1 FLOOR PLAN1 LEVEL 2 DEMO PLAN4 PROPOSED LEVEL 2 FLOOR PLAN2 1/4" = 1'-0" A3.01 CABIN 03 FLOOR PLANS LEGENDGENERAL NOTES1.DO NOT SCALE DRAWINGS, REFER TO DIMENSIONSSHOWN.2.CONTACT ARCHITECT FOR ANY MISSINGDIMENSIONS OR INFORMATION3.ALL DIMENSIONS ARE TO FACE OF FRAMING,UNLESS NOTED OTHERWISE4.ROUGH CARPENTER TO COORDINATE FRAMINGLAYOUT WITH LIGHTING, PLUMBING &MECHANICAL PLANS. INFORM ARCHITECT OF ANYDISCREPANCIES5. SEE A800-A802 WINDOW & DOOR SCHEDULESFOR UNIT SIZES6.SEE COVER SHEET FOR TYPICAL ABBREVIATIONS &LEGEND7.REFER TO A001 FOR DETAILED PROJECT NOTES &BEST PRACTICES8.BUILDING MASSING/ENVELOPE TO REMAIN, UNO.SDCM DR WND KEY PLAN N NNNNA3.024 5 A3.02 1 7 A3.02 3 A3.02 2 A3.02 6 MAIN 03.2 KITCHEN 03.3 (N) BEDROOM 03.5 (N) BATH 03.6 (N) SLEEPING PORCH 03.1 (E) BEDROOM03.7 (E) BATH 03.4 03-1 03-3 03-4 03-5 03-8 03-7 03-B 03-A 03-F 03-E 03-D03-C 03-H 03-G 03-6 03-2 5'-2"2'-8"12'-0"P-X P-X P-X P-X P-X ATTIC 4'-51 2"4'-0"4'-91 2"412"2'-4"2'-51 2"10'-3"3'-3"3'-11 2" 2'-0"5'-2" 6'-5" 2'-6"2'-4"2'-10"3'-412"2'-612"2'-5"2'-6"3'-4"4"17'-0"Example: New bedroom is being added to the existing carport. The existing door is 2’-4” wide - would this be required to be widened to have a 32” clear opening? Assuming this cabin is not acting as our (1) required ADA accessible unit, do push/pull clearances at doors need to be considered? CODE UPDATES Exhibit 1 - Page 68 of 80 MARROWSTONE INN 8 HOEDEMAKER PFEIFFER 2x WALL CONSTRUCTION MASONRY WALL CONSTRCUTION SMOKE/CO2 DETECTOR EXHAUST FAN WINDOW TAG DOOR TAG 6113 13th Avenue South, Seattle, Washington 98108 206 545 8434 NOT FOR CONSTRUCTION This document contains information proprietary to Hoedemaker Pfeiffer, LLC and is furnished in confidence for the limited purpose of evaluation, bidding, or review. This document or its contents may not be used for any other purpose and may not be reproduced or disclosed to others without the pre-written consent of Hoedemaker Pfeiffer, LLC. All rights reserved. Copyright 2019. LEVEL 1 DEMO PLAN3 PROPOSED LEVEL 1 FLOOR PLAN1 LEVEL 2 DEMO PLAN4 PROPOSED LEVEL 2 FLOOR PLAN2 1/4" = 1'-0" A10.01 CABIN 10 FLOOR PLANS LEGEND GENERAL NOTES 1.DO NOT SCALE DRAWINGS, REFER TO DIMENSIONS SHOWN. 2.CONTACT ARCHITECT FOR ANY MISSING DIMENSIONS OR INFORMATION 3.ALL DIMENSIONS ARE TO FACE OF FRAMING, UNLESS NOTED OTHERWISE 4.ROUGH CARPENTER TO COORDINATE FRAMING LAYOUT WITH LIGHTING, PLUMBING & MECHANICAL PLANS. INFORM ARCHITECT OF ANY DISCREPANCIES 5. SEE A800-A802 WINDOW & DOOR SCHEDULES FOR UNIT SIZES 6.SEE COVER SHEET FOR TYPICAL ABBREVIATIONS & LEGEND 7.REFER TO A001 FOR DETAILED PROJECT NOTES & BEST PRACTICES 8.BUILDING MASSING/ENVELOPE TO REMAIN, UNO. SDCM DR WND KEY PLAN N N N N N A10.03 42 1 3 A10.03 6 5 7 MAIN 10.1 (E) BEDROOM 10.2 (R) BATH 10.3 (E) BEDROOM 10.4 (R) BATH 10.5 10-1 10-3 10-2 10-5 10-4 10-7 10-I 10-H 10-G 10-F 10-J 10-K 10-A10-B 10-E 10-D10-C 10-6 P-X P-X P-X P-X P-X P-X 3'-5" 4'-3" 5'-2" 5'-11" 5'-3" 5'-0" 6'-8" 5'-0" 2'-11"4'-0"71 2"1012"2'-4"3'-5"2'-8"5'-41 2"2'-81 2"2'-61 2"2'-6"4'-212"8'-0"2'-1114"1'-1" 2'-8"5'-612"3'-6"2'-0"4'-0" 1'-4"2'-6"1'-8" 3'-0" 2'-101 2"2'-0"2'-4"1012"Example: Existing powder room has a sloped ceiling w/ head height of 3’-5” at the toilet. Would a renovation of this restroom to include a new sink and shower with be acceptable with the current low head height? TRIGGERS FOR CODE UPGRADES What triggers updates to conform to current code? - Door clearances - Height clearances CODE UPDATES Exhibit 1 - Page 69 of 80 MARROWSTONE INN 9 HOEDEMAKER PFEIFFER Existing restrooms @ Lodge do not provide an accessible stall. If we choose to add a single user accessible restroom, is a renovation of the existing restroom - keeping the same layout - acceptable EXISTING PROPOSED RESTROOM RENOVATION LODGE - ASSEMBLY SPACE (E) LAUNDRY Exhibit 1 - Page 70 of 80 MARROWSTONE INN 10 HOEDEMAKER PFEIFFER (N) STUDIO(N) ADU(N) STUDIO(N) STUDIO(E) 3 BEDROOMMOBILE HOME(E) SHOP Currently a (3) bedroom mobile home. Proposal would be to build a new (3) unit building within the same footprint. Is the proposed (3) unit buidilng acceptable? What are fire separation requirements between new build- ing and the existing garage? PROPOSED (N) UNITS EXISTING PROPOSED Exhibit 1 - Page 71 of 80 MARROWSTONE INN 11 HOEDEMAKER PFEIFFER Additional Development Sauna - Outside of shoreline 300-350 SF Plumbed Restroom + Indoor +/- Outdoor shower ADDITIONAL DEVELOPMENT SAUNA Exhibit 1 - Page 72 of 80 MARROWSTONE INN 12 HOEDEMAKER PFEIFFER FIRE ACCESS What are the minimum fire/emergency access requirements for the buildings? - Distance to cabins - Road widths - Turning radius FIRE ACCESS 33’42’56’50’50’25’139’75’27’Exhibit 1 - Page 73 of 80 MARROWSTONE INN 13 HOEDEMAKER PFEIFFER 2x WALL CONSTRUCTIONMASONRY WALL CONSTRCUTIONSMOKE/CO2 DETECTOREXHAUST FANWINDOW TAGDOOR TAG6113 13th Avenue South,Seattle, Washington 98108206 545 8434NOT FOR CONSTRUCTIONThis document contains informationproprietary to Hoedemaker Pfeiffer, LLC andis furnished in confidence for the limitedpurpose of evaluation, bidding, or review. Thisdocument or its contents may not be used forany other purpose and may not bereproduced or disclosed to others without thepre-written consent of Hoedemaker Pfeiffer,LLC. All rights reserved. Copyright 2019.LEVEL 2 DEMO PLAN21/4" = 1'-0" A12.01LODGE LEVEL02 FLOORPLANSPROPOSED LEVEL 2 PLAN1LEGENDGENERAL NOTES1.DO NOT SCALE DRAWINGS, REFER TO DIMENSIONSSHOWN.2.CONTACT ARCHITECT FOR ANY MISSINGDIMENSIONS OR INFORMATION3.ALL DIMENSIONS ARE TO FACE OF FRAMING,UNLESS NOTED OTHERWISE4.ROUGH CARPENTER TO COORDINATE FRAMINGLAYOUT WITH LIGHTING, PLUMBING &MECHANICAL PLANS. INFORM ARCHITECT OF ANYDISCREPANCIES5. SEE A800-A802 WINDOW & DOOR SCHEDULESFOR UNIT SIZES6.SEE COVER SHEET FOR TYPICAL ABBREVIATIONS &LEGEND7.REFER TO A001 FOR DETAILED PROJECT NOTES &BEST PRACTICESSDCMDRWNDKEY PLANNA12.025746A12.02231MAIN12.01KITCHEN12.0212.212.112.312.412.512-B12-A12-E12-D12-CN N 13'-1112"28'-1012"12'-0"3'-712"6"3'-0"6"5"3'-0"COMMERCIAL KITCHEN Information received from Mina Kwansa 05.04.2021 Exhibit 1 - Page 74 of 80 MARROWSTONE INN 14 HOEDEMAKER PFEIFFER 2x WALL CONSTRUCTION MASONRY WALL CONSTRCUTION SMOKE/CO2 DETECTOR EXHAUST FAN WINDOW TAG DOOR TAG 6113 13th Avenue South, Seattle, Washington 98108 206 545 8434 NOT FOR CONSTRUCTION This document contains information proprietary to Hoedemaker Pfeiffer, LLC and is furnished in confidence for the limited purpose of evaluation, bidding, or review. This document or its contents may not be used for any other purpose and may not be reproduced or disclosed to others without the pre-written consent of Hoedemaker Pfeiffer, LLC. All rights reserved. Copyright 2019. LEVEL 1 DEMO PLAN3 PROPOSED LEVEL 1 FLOOR PLAN1 LEVEL 2 DEMO PLAN4 PROPOSED LEVEL 2 FLOOR PLAN2 1/4" = 1'-0" A1.01 CABIN 01 FLOOR PLANS GENERAL NOTES 1.DO NOT SCALE DRAWINGS, REFER TO DIMENSIONS SHOWN. 2.CONTACT ARCHITECT FOR ANY MISSING DIMENSIONS OR INFORMATION 3.ALL DIMENSIONS ARE TO FACE OF FRAMING, UNLESS NOTED OTHERWISE 4.ROUGH CARPENTER TO COORDINATE FRAMING LAYOUT WITH LIGHTING, PLUMBING & MECHANICAL PLANS. INFORM ARCHITECT OF ANY DISCREPANCIES 5. SEE A800-A802 WINDOW & DOOR SCHEDULES FOR UNIT SIZES 6.SEE COVER SHEET FOR TYPICAL ABBREVIATIONS & LEGEND 7.REFER TO A001 FOR DETAILED PROJECT NOTES & BEST PRACTICES 8.BUILDING MASSING/ENVELOPE TO REMAIN, UNO. SDCM DR WND LEGEND KEY PLAN N N N N N A1.03 1 A1.032 A1.033 A1.03 64 5 A1.03 7 01-601-5 01-4 01-3 01-1 01-2 MAIN 01.1 (E) BEDROOM 01.4 (N) BATH 01.3 (E) BATH 01.2 01-8 (E) BEDROOM 01.6(E) BEDROOM 01.7 01-7 (E) HALL 01.5 01-A 01-C 01-B 01-D 43 4" P-X P-X P-X P-X P-X3'-7"4'-5"3'-3"5'-5"2'-8"2'-1"3'-1012"5'-0"1'-2"41 2"2'-6"2'-712"OVER THE COUNTER PERMIT Do any of the proposed cabin renovations meet the require- ments for an over the counter permit? What can be done without a permit? - Roofing - Siding CABIN 1 - new entry door location - new sink on floor 2 - relocated shower room PERMITTING OVER THE COUNTER PERMIT Exhibit 1 - Page 75 of 80 MARROWSTONE INN 15 HOEDEMAKER PFEIFFER 2x WALL CONSTRUCTION MASONRY WALL CONSTRCUTION SMOKE/CO2 DETECTOR EXHAUST FAN WINDOW TAG DOOR TAG 6113 13th Avenue South, Seattle, Washington 98108 206 545 8434 NOT FOR CONSTRUCTION This document contains information proprietary to Hoedemaker Pfeiffer, LLC and is furnished in confidence for the limited purpose of evaluation, bidding, or review. This document or its contents may not be used for any other purpose and may not bereproduced or disclosed to others without the pre-written consent of Hoedemaker Pfeiffer, LLC. All rights reserved. Copyright 2019. LEVEL 1 DEMO PLAN 1/4" = 1'-0"6 PROPOSED LEVEL 1 FLOOR PLAN 1/4" = 1'-0"5 1/4" = 1'-0" A8.01 CABIN 08 FLOOR PLANS LEGEND GENERAL NOTES 1.DO NOT SCALE DRAWINGS, REFER TO DIMENSIONS SHOWN. 2.CONTACT ARCHITECT FOR ANY MISSING DIMENSIONS OR INFORMATION 3.ALL DIMENSIONS ARE TO FACE OF FRAMING, UNLESS NOTED OTHERWISE 4.ROUGH CARPENTER TO COORDINATE FRAMING LAYOUT WITH LIGHTING, PLUMBING & MECHANICAL PLANS. INFORM ARCHITECT OF ANY DISCREPANCIES 5. SEE A800-A802 WINDOW & DOOR SCHEDULES FOR UNIT SIZES 6.SEE COVER SHEET FOR TYPICAL ABBREVIATIONS & LEGEND 7.REFER TO A001 FOR DETAILED PROJECT NOTES & BEST PRACTICES 8.BUILDING MASSING/ENVELOPE TO REMAIN, UNO. SDCM DR WND KEY PLAN NNNA8.02 13 4 2 A8.026 5 08.1 08.2 08-D 08-C 08-B 08-A MAIN 08.1 BATH 08.2 BUILDING ELEVATION - NORTH 1/4" = 1'-0"4 BUILDING ELEVATION - EAST 1/4" = 1'-0"2 BUILDING ELEVATION - SOUTH 1/4" = 1'-0"3 BUILDING ELEVATION - WEST 1/4" = 1'-0"1 P-X P-XP-X (E) STORAGE 5'-112"2'-338"2x WALL CONSTRUCTION MASONRY WALL CONSTRCUTION SMOKE/CO2 DETECTOR EXHAUST FAN WINDOW TAG DOOR TAG 6113 13th Avenue South, Seattle, Washington 98108 206 545 8434 NOT FOR CONSTRUCTION This document contains information proprietary to Hoedemaker Pfeiffer, LLC and is furnished in confidence for the limited purpose of evaluation, bidding, or review. This document or its contents may not be used for any other purpose and may not bereproduced or disclosed to others without the pre-written consent of Hoedemaker Pfeiffer, LLC. All rights reserved. Copyright 2019. LEVEL 1 DEMO PLAN 1/4" = 1'-0"6 PROPOSED LEVEL 1 FLOOR PLAN 1/4" = 1'-0"5 1/4" = 1'-0" A9.01 CABIN 09 FLOOR PLANS LEGEND GENERAL NOTES 1.DO NOT SCALE DRAWINGS, REFER TO DIMENSIONS SHOWN. 2.CONTACT ARCHITECT FOR ANY MISSING DIMENSIONS OR INFORMATION 3.ALL DIMENSIONS ARE TO FACE OF FRAMING, UNLESS NOTED OTHERWISE 4.ROUGH CARPENTER TO COORDINATE FRAMING LAYOUT WITH LIGHTING, PLUMBING & MECHANICAL PLANS. INFORM ARCHITECT OF ANY DISCREPANCIES 5. SEE A800-A802 WINDOW & DOOR SCHEDULES FOR UNIT SIZES 6.SEE COVER SHEET FOR TYPICAL ABBREVIATIONS & LEGEND 7.REFER TO A001 FOR DETAILED PROJECT NOTES & BEST PRACTICES 8.BUILDING MASSING/ENVELOPE TO REMAIN, UNO. SDCM DR WND KEY PLAN NNNA9.02 13 4 2 A9.026 5 MAIN 09.1 (R) BATH 09.2 09.1 09.2 09-E 09-D 09-C 09-B 09-A BUILDING ELEVATION - NORTH 1/4" = 1'-0"4 BUILDING ELEVATION - EAST 1/4" = 1'-0"2 BUILDING ELEVATION - SOUTH 1/4" = 1'-0"3 BUILDING ELEVATION - WEST 1/4" = 1'-0"1 P-X P-XP-X 5'-158"OVER THE COUNTER PERMIT Do any of the proposed cabin renovations meet the require- ments for an over the counter permit? What can be done without a permit? - Roofing - Siding CABIN 8 - relocated restroom - relocated kitchenette CABIN 9 - relocated restroom - relocated kitchenette PERMITTING OVER THE COUNTER PERMIT Exhibit 1 - Page 76 of 80 MARROWSTONE INN 16 HOEDEMAKER PFEIFFER 2x WALL CONSTRUCTION MASONRY WALL CONSTRCUTION SMOKE/CO2 DETECTOR EXHAUST FAN WINDOW TAG DOOR TAG 6113 13th Avenue South, Seattle, Washington 98108 206 545 8434 NOT FOR CONSTRUCTION This document contains information proprietary to Hoedemaker Pfeiffer, LLC and is furnished in confidence for the limited purpose of evaluation, bidding, or review. This document or its contents may not be used for any other purpose and may not bereproduced or disclosed to others without the pre-written consent of Hoedemaker Pfeiffer, LLC. All rights reserved. Copyright 2019. LEVEL 1 DEMO PLAN 1/4" = 1'-0"6 PROPOSED LEVEL 1 FLOOR PLAN 1/4" = 1'-0"5 1/4" = 1'-0" A7.01 CABIN 07 FLOOR PLANS LEGEND GENERAL NOTES 1.DO NOT SCALE DRAWINGS, REFER TO DIMENSIONS SHOWN. 2.CONTACT ARCHITECT FOR ANY MISSING DIMENSIONS OR INFORMATION 3.ALL DIMENSIONS ARE TO FACE OF FRAMING, UNLESS NOTED OTHERWISE 4.ROUGH CARPENTER TO COORDINATE FRAMING LAYOUT WITH LIGHTING, PLUMBING & MECHANICAL PLANS. INFORM ARCHITECT OF ANY DISCREPANCIES 5. SEE A800-A802 WINDOW & DOOR SCHEDULES FOR UNIT SIZES 6.SEE COVER SHEET FOR TYPICAL ABBREVIATIONS & LEGEND 7.REFER TO A001 FOR DETAILED PROJECT NOTES & BEST PRACTICES SDCM DR WND KEY PLAN N A7.02 42 3 1 A7.02 31 2 MAIN 07.1 (N) BATH 07.2 07.1 07.2 07-A 07-B 07-C BUILDING ELEVATION - NORTH 1/4" = 1'-0"4 BUILDING ELEVATION - EAST 1/4" = 1'-0"2 BUILDING ELEVATION - SOUTH 1/4" = 1'-0"3 BUILDING ELEVATION - WEST 1/4" = 1'-0"1 P-X P-X P-X NN4'-8"3'-1"7"2'-812"712"2'-1"7'-8"2'-212" OVER THE COUNTER PERMIT Do any of the proposed cabin renovations meet the require- ments for an over the counter permit? What can be done without a permit? - Roofing - Siding CABIN 7 -new restroom - relocated entry PERMITTING OVER THE COUNTER PERMIT Exhibit 1 - Page 77 of 80 HOEDEMAKER PFEIFFER 6113 13th Avenue South Seattle, WA 98108 206 545 8434 Pre-App Questions Blake Lodge Parcels: 921084011 | 921084010 | 921084029 1. What is timeline/process for the Conditional Use Permit? What category do we fall into [C, C(a), C(d)] 2. Which cabins can be over the counter permits (minor remodels – no additional bedrooms or structural changes) a. Cabin 1 b. Cabin 7 c. Cabin 8 d. Cabin 9 3. What is the permitting timeline for remodels? 4. Code Upgrades a. What triggers updates to code? i. Doors – IBC requires 32” clear opening. Do all doors need to be upgraded to meet code? What changes trigger this requirement to be met in existing buildings/spaces? 1. Door clearances ii. Head height 1. IBC requires 7’-6” min head height; IEBC requires 7’-0” min head height for new habitable space a. new bedrooms under existing roofs b. proposed shower (cabin 10) 5. What exterior modifications are allowed (decks, etc) a. Within 150’ buffer b. Within 200’ buffer 6. Lodge – Commercial Kitchen requirements a. Required equipment - three compartment sink, handwashing sink, mop sink, grease trap; commercial dishwasher b. Other required equipment? c. Floor drains/sinks? d. Materials – i. Wood flooring acceptable? ii. New ceiling required? 7. Lodge Restrooms – Is a gender neutral, multi stall restroom allowed? a. Assuming plumbing counts are met within the gender neutral, multi-stall restroom b. Separate multi-stall shower room – gender neutral 8. Septic 9. The existing stormwater is controlled by splash blocks. Can this solution be maintained? 10. Water connection a. Process, timeline, etc Exhibit 1 - Page 78 of 80 HOEDEMAKER PFEIFFER 6113 13th Avenue South Seattle, WA 98108 206 545 8434 11. What are the limitations with Glamping on the property and does adding the temporary structures fall under Jefferson County Code sections dealing with nonconforming uses and structures (JCC 18.20.260) a. There are both non conforming uses and structures – Section 3 of JCC 18.20.260 applies to the subject property b. If the use and/or the structures are expanded, does a UDC Type permit approval allow for the type of expansion requested? c. Can seasonal platforms be built to allow for glamping tents? 12. What changes can be made that do not trigger the need for code upgrades? 13. Do cabins not acting as accessible units need to comply with any accessibility standards? Can new and/or existing doors be under 32” clear? 14. Where are fire sprinkles necessary? a. New studio building/new structures? b. Assembly/lodge? c. Newly created habitable space (i.e. additions to cabins within current footprint) 15. Parking: • What are the parking requirements for a site like this? • Is there are minimum number of parking stalls required? • Can the guest parking be separated from the cabins and centrally located outside the shoreline area? 16. Trees: • There are trees on the site that we would like to consider for removal. Some of the most common issues are: o Trees that are dead or dying or in a state of decay near structures, public spaces or public roads. o Previously topped trees 17. Invasive Plant Mitigation: • Would removal of non-native invasive plants be considered ‘clearing and grading’ if replanting with site appropriate native plants is to take place in these areas? 18. Shoreline Setback: • How is removal of crushed rock areas in the shoreline setback viewed if these areas are returned to native planting? Would this be considered ‘clearing and grading’? • Can native planting take place in the shoreline setback without permit review? 19. Fire Code: • What are the minimum fire/emergency access requirements for the building? 20. What are the permitting requirements for trenching utilities to each of the existing structures within the shoreline buffer? Exhibit 1 - Page 79 of 80 From:Linda Atkins To:Shannen Cartmel Subject:FW: 10 Beach Dr, PRE2021-10 Date:Wednesday, May 12, 2021 3:03:01 PM Linda Atkins, RS Environmental Health Specialist 3 Jefferson County Environmental Public Health 360-385-9444 latkins@co.jefferson.wa.us www.jeffersoncountypublichealth.org Per order of the Jefferson County Commissioners, the Environmental Health front desk is not available for walk-in customer service. We will continue to provide service over the phone and email; and if absolutely necessary, schedule walk-in appointments. We thank you for your cooperation, and kindly ask that if you are sick, please refrain from scheduling an appointment or cancel your existing one. CONFIDENTIALITY NOTICE: This e-mail message, including any attachments, is for the sole use of the intended recipient(s) and may contain confidential and privileged information. Any unauthorized review, use, disclosure, or distribution is prohibited. If you are not the intended recipient, please contact the sender by reply e-mail and destroy all copies of the original message. PUBLIC RECORDS ACT NOTICE: All e-mail sent to this address has been received by the Jefferson County e-mail system and is therefore subject to the Public Records Act, a state law found at RCW 42.56. Under the Public Records law the County must release this e-mail and its contents to any person who asks to obtain a copy (or for inspection) of this e-mail unless it is exempt from disclosure under state law, including RCW 42.56. From: Linda Atkins Sent: Friday, April 30, 2021 4:11 PM To: Joel Peterson <JPeterson@co.jefferson.wa.us> Subject: 10 Beach Dr, PRE2021-10 Joel, Regarding the septic systems on the property. SEP97-12 is permitted for a 3 bedroom single family residence, any change in use would require compliance with current code and sizing would need to be evaluated by a licensed designer. SEP85-57 is permitted for 4 one bedroom cabins SEP72-24 is permitted for a ‘service building’ with 5 toilets, 1 urinal, 2 showers, 2 sinks, 1 dishwasher, 2 onebedroom cabins, one residence and 3 travel trailer connections. No plumbing was permitted or approved for connection in the buildings labeled 5, 6, 7 on the site plan submitted with the pre-ap. No approval for modification/alteration or connection to the septic system will be approved until the septic system is installed and finaled. These are currently in violation. A letter was sent to the property owner and is available to view online. No modification to any other buildings/cabins on the site will be approved unless they are in Exhibit 1 - Page 80 of 80