HomeMy WebLinkAboutstamped_038 Emails with Public Works - TrafficFrom:John Fleming
To:Shannen Cartmel
Subject:FW: GoToMeeting Invitation - Traffic Impact Studies/ CRAB Mobility Discussion
Date:Thursday, November 4, 2021 10:58:22 AM
Attachments:Stubbed Attachments.htm
This message's contents have been archived by the Barracuda Message Archiver.
JC Ordinance 04 0702 07.pdf (2.4M)
JC Ordinance 08 0710 06 Attachment - Chapter 18 30 Development Stds.pdf (179.8K)
JC Ordinance 08 0710 06.pdf (224.1K)
Traffic Impact Analysis Checklist.pdf (125.6K)
Hi Shannen:
Regarding the “Traffic Impact Studies/ CRAB Mobility Discussion”
Topics of Discussion:
1. When are Traffic Impact Analysis Reports required?
The attached checklist is PW’s guide for when to request a TIA.
Please see the first section “Traffic Impact Analysis (TIA) Required?” with thresholds for 5
characteristics checked.
2. When is CRAB Mobility analysis appropriate to be the only traffic analysis completed for a
project?
When the above TIA checklist’s 5 characteristics are below the thresholds given.
3. Safety vs Road Service Issues
4. Non-motorized transportation LOS
5. Transportation Section of Comprehensive Plan
Relevant JCC chapter 18.30.020 (5) General Development Standards:
(5) All land use activities shall be served by appropriate transportation facilities. Transportation
facilities shall be adequate to meet the level of service standards adopted in the Jefferson County
Comprehensive Plan and the appropriate design standards referenced in JCC 18.30.080(1)(a). If
transportation facilities would become inadequate, the applicant shall be required to provide
necessary improvements and/or implement alternative measures such as transportation demand
management (TDM), project phasing, or other measures acceptable to Jefferson County that will
maintain the adopted level of service standards and meet design standards. If transportation
facilities are not adequate, Jefferson County shall not approve the proposed development.
Transportation facilities shall be deemed adequate if necessary improvements are planned and
designated funding is secured in the Jefferson County Six-Year Transportation Improvement
Program. [Ord. 4-07 § 2; Ord. 8-06 § 1]
I have attached the BOCC ordinances that helped shape the current Jefferson County Code, so you
can see when “Level of Service “ made it into the code, as a threshold for acceptability for traffic on
roads.
Exhibit 38 - Page 1 of 6
Thank you,
John
-----Original Appointment-----
From: John Fleming
Sent: Wednesday, November 3, 2021 3:33 PM
To: Amanda Hunt
Subject: Accepted: GoToMeeting Invitation - Traffic Impact Studies/ CRAB Mobility Discussion
When: Monday, November 8, 2021 1:30 PM-2:00 PM (UTC-08:00) Pacific Time (US & Canada).
Where: GTM
Hi Amanda:
I am assuming this is in response to the email I have sent you on
1. October 1, 2021 at 10:01 am regarding SEPA comments
2. October 21, 2021 at 3:30 pm regarding CRAB etc.
3. October 26, 2021 at 12:07 pm regarding pre-app comments for traffic
If so, then I believe I am informed enough to participate in the meeting.
If not, do you want to send more information to clarify what I will be contributing to the meeting?
Thank you,
John
Exhibit 38 - Page 2 of 6
From:John Fleming
To:Shannen Cartmel
Subject:FW: Traffic Impact Study: Marrowstone Inn
Date:Thursday, November 4, 2021 12:56:45 PM
Attachments:Stubbed Attachments.htm
This message's contents have been archived by the Barracuda Message Archiver.
Jefferson Comp Plan 12-2018 Appendix C Transportation Tech Doc.pdf (4.0M)
Traffic Impact Analysis 2021.pdf (125.6K)
Hi Shannen:
Applicant Andrew Nordstrom sent me this message, without copy to you.
I have attached information that DCD can share with applicants regarding TIAs.
Public Works does not make recommendations to applicants regarding who to hire for consulting
engineering.
Thank you,
John
All e-mail sent to this address has been received by the Jefferson County e-mail system and is therefore subject to
the Public Records Act, a state law found at RCW 42.56.
From: andrew nordstrom <andrewlnordstrom@gmail.com>
Sent: Thursday, November 4, 2021 11:49 AM
To: John Fleming <JFleming@co.jefferson.wa.us>
Subject: Traffic Impact Study: Marrowstone Inn
ALERT: BE CAUTIOUS This email originated outside the organization. Do not open attachments or
click on links if you are not expecting them.
Dear John Fleming,
Hope your having a good day.
My name is Andy and I am the owner/operator of Marrowstone Inn located at 10 Beach Drive,
Nordland WA.
Our public comment period resulted in a couple requests for a traffic impact analysis (TIA). The next
steps for the project is to have a TIA prepared.
Exhibit 38 - Page 3 of 6
I am sure you are quite busy at the moment but wanted to reach out to you for further insight. Are
there any third party engineers that the county recommends and preferred format of TIA?
Thank you for your time and consideration.
Regards,
Andy Nordstrom
Exhibit 38 - Page 4 of 6
From:John Fleming
To:Brent Butler
Cc:Amanda Hunt; Shannen Cartmel
Subject:Traffic Impact Studies/ CRAB Mobility Discussion
Date:Monday, November 8, 2021 2:47:25 PM
Attachments:Stubbed Attachments.htm
This message's contents have been archived by the Barracuda Message Archiver.
JC Ordinance 04 0702 07.pdf (2.4M)
JC Ordinance 08 0710 06 Attachment - Chapter 18 30 Development Stds.pdf (179.8K)
JC Ordinance 08 0710 06.pdf (224.1K)
Jefferson Comp Plan 12-2018 Appendix C Transportation Tech Doc.pdf (4.0M)
Traffic Impact Analysis Checklist.pdf (125.6K)
Hi Brent:
Good to meet with you, Shannen and Amanda today.
Please see below and attached for items I have shared with them recently.
Sincerely,
John Fleming PE
Public Works
Development Review Engineer
ODT Project Manager
360-301-6563 cell
360-385-9217 desk
360-385-9160 main
From: John Fleming
Sent: Thursday, November 4, 2021 10:58 AM
To: Shannen Cartmel <SCartmel@co.jefferson.wa.us>
Subject: FW: GoToMeeting Invitation - Traffic Impact Studies/ CRAB Mobility Discussion
Hi Shannen:
Regarding the “Traffic Impact Studies/ CRAB Mobility Discussion”
Topics of Discussion:
1. When are Traffic Impact Analysis Reports required?
The attached checklist is PW’s guide for when to request a TIA.
Please see the first section “Traffic Impact Analysis (TIA) Required?” with thresholds for 5
characteristics checked.
2. When is CRAB Mobility analysis appropriate to be the only traffic analysis completed for a
project?
When the above TIA checklist’s 5 characteristics are below the thresholds given.
Exhibit 38 - Page 5 of 6
3. Safety vs Road Service Issues
4. Non-motorized transportation LOS
5. Transportation Section of Comprehensive Plan
Relevant JCC chapter 18.30.020 (5) General Development Standards:
(5) All land use activities shall be served by appropriate transportation facilities. Transportation
facilities shall be adequate to meet the level of service standards adopted in the Jefferson County
Comprehensive Plan and the appropriate design standards referenced in JCC 18.30.080(1)(a). If
transportation facilities would become inadequate, the applicant shall be required to provide
necessary improvements and/or implement alternative measures such as transportation demand
management (TDM), project phasing, or other measures acceptable to Jefferson County that will
maintain the adopted level of service standards and meet design standards. If transportation
facilities are not adequate, Jefferson County shall not approve the proposed development.
Transportation facilities shall be deemed adequate if necessary improvements are planned and
designated funding is secured in the Jefferson County Six-Year Transportation Improvement
Program. [Ord. 4-07 § 2; Ord. 8-06 § 1]
I have attached the BOCC ordinances that helped shape the current Jefferson County Code, so you
can see when “Level of Service “ made it into the code, as a threshold for acceptability for traffic on
roads.
Thank you,
John
-----Original Appointment-----
From: John Fleming
Sent: Wednesday, November 3, 2021 3:33 PM
To: Amanda Hunt
Subject: Accepted: GoToMeeting Invitation - Traffic Impact Studies/ CRAB Mobility Discussion
When: Monday, November 8, 2021 1:30 PM-2:00 PM (UTC-08:00) Pacific Time (US & Canada).
Where: GTM
Hi Amanda:
I am assuming this is in response to the email I have sent you on
1. October 1, 2021 at 10:01 am regarding SEPA comments
2. October 21, 2021 at 3:30 pm regarding CRAB etc.
3. October 26, 2021 at 12:07 pm regarding pre-app comments for traffic
If so, then I believe I am informed enough to participate in the meeting.
If not, do you want to send more information to clarify what I will be contributing to the meeting?
Thank you,
John
Exhibit 38 - Page 6 of 6