Loading...
HomeMy WebLinkAboutstamped_047 Rescheduled Hearing Notice Materials for 5-11-2022 Please publish one time. PUBLISH DATE: May 11, 2022 BILL: Jefferson County Department of Community Development 621 Sheridan Street, Port Townsend, WA 98368 JEFFERSON COUNTY NOTICE OF RESCHEDULED PUBLIC HEARING TYPE III LAND USE APPLICATION MLA21-00080 NOTICE IS HEREBY GIVEN that the virtual public hearing has been rescheduled to May 26, 2022 starting at 1:00 PM. The hearing will be held by the Jefferson County Hearings Examiner to review and receive comments on a Type III Land Use Application. APPLICANT: EXTEND YOURSELF, LLC ANDREW NORDSTROM C/O LANE POWELL PC 1420 5TH AVE STE 4200 SEATTLE, WA 98101-2375 Application Received Date: August 12, 2021 Application Complete Date: August 23, 2021 Application Notice Date: September 8, 2021 Notice of RESCHEDULED hearing: April 13, 2022 Notice of RESCHEDULED hearing x2: May 11, 2022 Date of Hearing: May 26, 2022 SITE ADDRESS AND PROJECT LOCATION: Parcel #'s: 921084010 and 921084011; S8 T29 R1E TAX NO. 10 (N300') and (LESS N300'); 10 Beach Drive, Nordland, WA 98358. PROJECT DESCRIPTION AND REQUIRED PERMITS/STUDIES: ZON2021-00049: Extend Yourself Limited Liability Company (LLC) proposes renovations and improvements to an existing SMALL-SCALE TOURIST AND RECREATION USE on Oak Bay and Kilisut Harbor. A CONDITIONAL USE PERMIT (CUP) with a MAJOR VARIANCE is required to renovate this use formerly known as Marrowstone Inn. Situated on 8.3 acres, the site includes a main lodge, eleven cabins, a mobile home, sheds, barn, detached garage and a boat launch on shorelines and adjacent upland areas. Extend Yourself LLC proposes to renovate and improve the existing structures. The proposal includes: (1) the addition of a commercial kitchen to the main lodge and (2) the addition of a sauna to the property, (3) an upgrade to the septic system to meet current Environmental Public Health (EPH) standards for commercial kitchen operations, (4) reducing the impervious areas of informal paths, (5) upgrades to eleven cabins, (6) new gravel parking, (7) the replacement of a mobile home with a stick built structure, (8) reestablishment of a dense native landscape along the shoreline buffer, (9) protection and offsetting of wetland and shoreline impacts to improve their functions and values and (10) the addition of two yurts for "glamping" - a form of camping involving accommodation and facilities more luxurious than those associated with traditional camping. Operated as fishing cabins as of 1937 and later a beach resort, this small-scale use is considered legal nonconforming (“grandfathered”) pursuant to JCC 18.20.260 because it predates regulations requiring a minimum of 10 acres, as set forth in JCC 18.20.350 (9)(a), and the requirement for buildings not to exceed 6,000 SF, as outlined in JCC 18.20.350 (1)(q). SDP2021-00012: SHORELINE VARIANCE WITH SHORELINE SUBSTANTIAL DEVELOPMENT PERMIT to remodel and renovate existing non-conforming cabins. The renovations include lateral, landward development within the shoreline jurisdiction. A small portion of waterward development includes supplying existing non-conforming cabins 1-4 with the required septic transport lines. Once installed, the applicant will plant a native grass seed mix to bring the area back to pre-disturbance conditions. There are two wetlands on-site, a category I marine wetland and a category IV wetland, with a 300-foot and 40-foot buffer, respectively. The applicants are requesting an administrative buffer reduction of 25% per JCC 18.22.730 (9), making the wetland buffer 225 feet, rather than 300 feet. The entryway to cabin 3 will be relocated to the eastern side of the cabin, a lateral expansion that is parallel to the shoreline of Oak Bay. The previous unpermitted expansion of a restroom in cabin 5, installed by previous owners without any permits, is proposed to remain and be permitted through this shoreline permit and with a built-without-permits (BWOP) building as a lateral expansion to the shoreline of Kilisut Harbor and is envisioned as restroom facilities for the guests utilizing this cabin. Associated road access improvements and portions of the septic lines are proposed waterward of cabins 1-4. The septic system has been designed to minimize land disturbance in association with the onsite contours and conditions. The proposal will bring the property into compliance with all local and state regulations. The proposal is supported by a Shoreline, Wetland, Fish and Wildlife Habitat, and FEMA Floodplain assessment prepared by Soundview Consultants (Assessment). PUBLIC HEARING AND WHERE TO VIEW DOCUMENTS: The public hearing will be conducted on May 26, 2022 via a virtual Public Hearing with Jefferson County Hearing Examiner. The hearing will begin at or about 1:00PM. Please see the following link to the Jefferson County Office of the Hearing Examiner webpage (https://www.co.jefferson.wa.us/789/Office-of-the-Hearing-Examiner). The link to the virtual conference can be found on the Office of the Hearing Examiner webpage calendar 1-7 days prior to the public hearing. The application and any studies may be reviewed at the Jefferson County Department of Community Development 14 days prior to the date of the hearing and will be available here: https://test.co.jefferson.wa.us/WeblinkExternal/Browse.aspx?id=3249828&dbid=0&repo=Jefferson. All interested persons are invited to (a) comment on the application; (b) receive notice of and participate in any hearings; and (c) receive a copy of the decision by submitting such written comment(s)/request(s) to the Jefferson County Department of Community Development, Development Review Division, 621 Sheridan Street, Port Townsend, WA 98368, (360) 379-4454 or emailed to scartmel@co.jefferson.wa.us. SEPA INFORMATION AND DETERMINATION: A Determination of Non-Significance (DNS) was issued on March 29, 2022. Parties of record had the opportunity to appeal the decision to the Exhibit 47 - Page 1 of 11 Hearing Examiner by submitting a written statement to the Jefferson County Department of Community Development. No SEPA appeals were received. (JCC 18.40.330). Project Planner: Shannen Cartmel, 360-379-4454, scartmel@co.jefferson.wa.us Jefferson County Department of Community Development 621 Sheridan Street, Port Townsend, WA 98368 (360) 379-4450 Exhibit 47 - Page 2 of 11 Exhibit 47 - Page 3 of 11 USA NAVY DEPT OF NAVY 1101 TAUTOG CIRCLE SILVERDALE,WA 98315-1101 SHARON C BODKIN 4762 FLAGLER RD NORDLAND,WA 98358-9688 KATHLEEN H WALDRON 50 BEACH DR NORDLAND,WA 98358 BRIAN & LIANA BARGER 61 ROBBINS RD NORDLAND,WA 98358-9607 JOHN E DUFF 17917 RIVIERA PL SW NORMANDY PARK,WA 98166-3641 John and Carol Gonnella 120 Beach Drive Nordland, WA 98358 Tom and Linda Weiner 123 Beach Drive Nordland, WA 98358 Laurie Stusser-McNeil 302 Beach Drive Nordland, WA 98358 UNITED STATES NAVAL RESERVE INDIAN ISLAND 100 INDIAN ISLAND ANNEX RD PORT HADLOCK,WA 98339 KAREN R VAUGHN 7533 BRIDGE PL NE BREMERTON,WA 98311 STEVEN J GRACE TERESE M GRACE PO BOX 370 PORT HADLOCK,WA 98339-0370 RICHARD LLOYD TRUSTEE LLOYD FAMILY TRUST 41 ROBBINS RD NORDLAND,WA 98358-9607 LAURA L NASTRI & VON 51 BEACH DR NORDLAND,WA 98358-9602 Jo Jackson 140 Beach Drive Nordland, WA 98358 Erick Cody 260 Beach Drive Nordland, WA 98358 Hope Borsato 872 East Marrowstone Road Nordland, WA 98358 Mary Anne and Chuck Martin 302 Beach Drive Nordland, WA 98358 STATE OF WASHINGTON-DNR PO BOX 47014 OLYMPIA,WA 98504-7014 ERNST R BAIRD RANDY L PENDERGRASS 231 ROBBINS RD NORDLAND,WA 98358 MELISSA J & MATTHEW D BLAIR 53 ROBBINS RD NORDLAND,WA 98358-9607 MARK F MC CRARY 171 ROBBINS RD NORDLAND,WA 98358-9646 DUANE ARNOLD BAKER 100 TIMBER RIDGE WAY NW APT 43 ISSAQUAH,WA 98027-2960 Sandy and Duncan Haynes 6495 Flagler Road Nordland, WA 98358 Helen Stusser 300 Beach Drive Nordland, WA 98358 Terese Grace 121 Robbins Road Nordland, WA 98358 Dr. Jackie Canterbury 1640 E. Marrowstone Road Nordland, WA 98358 Exhibit 47 - Page 4 of 11 1 Helena Smith From:Brent Butler Sent:Thursday, April 14, 2022 3:07 PM To:Helena Smith Cc:Shannen Cartmel Subject:UPDATE to Hearing Examiner Website Dear Helena,     Please amend the hearing date on the Hearing Examiner’s website to reflect the new time, May 26, 2022, at 1pm. The  applicant’s attorney just called, and asked about the schedule and process.     ‐Brent    Brent Butler  Director  Jefferson County Department of Community Development   621 Sheridan Street   Port Townsend, WA 98368   Phone  360‐379‐4493  bbutler@co.jefferson.wa.us     Exhibit 47 - Page 5 of 11 1 Helena Smith From:Brent Butler Sent:Thursday, April 28, 2022 11:14 AM To:andrew nordstrom Cc:Degginger, Grant; John Sampson; Tori Masterson; Shannen Cartmel Subject:Marrowstone Inn Hearing Reschedule Hi Andy,   Yes – it’s wonderful out there. Yes, with Shannen out, we are a little behind in getting our notes to you. Nonetheless,  she’ll be back in the office next week, and I’ve scheduled a meeting with her Wednesday, May 4, 2022 to discuss my  edits to the staff report, finalize the publication, and discuss the conditions. Would it be possible to schedule a  placeholder meeting with your team for Friday, May 6, 2022.      Please note that since I will be out of the office Friday, tomorrow, and returning next Wednesday I’ll send you an invite  as a placeholder for meeting next Friday.   Please share any concerns you have with me in the interim period.     Warm regards,      ‐Brent    Brent Butler  DCD Director  360‐379‐4493    From: andrew nordstrom <andrewlnordstrom@gmail.com>   Sent: Thursday, April 28, 2022 9:09 AM  To: Brent Butler <BButler@co.jefferson.wa.us>  Cc: Degginger, Grant <deggingerg@lanepowell.com>; John Sampson <john@hoedemakerpfeiffer.com>; Tori Masterson  <tori@hoedemakerpfeiffer.com>  Subject: Fwd: Marrowstone Inn Hearing Reschedule      ALERT: BE CAUTIOUS This email originated outside the organization. Do not open attachments or click on links if you  are not expecting them.     Dear Brent,    Hope you are doing well and enjoying this beautiful weather.    I wanted to follow up with you as a I just received an automatic reply from Shannen Cartmel who is out of the office  sick.     What is the current status of both scheduling a meeting and receiving staff notes. Based off of our conversation and  email with Shannen it would have been last week to schedule a meeting and this week to receive staff notes. I haven’t  received any communication so I thought i would follow up.     Looking forward to hearing from you.  Exhibit 47 - Page 6 of 11 2   Best regards,    Andy Nordstrom     ‐‐‐‐‐‐‐‐‐‐ Forwarded message ‐‐‐‐‐‐‐‐‐  From: andrew nordstrom <andrewlnordstrom@gmail.com>  Date: Thu, Apr 28, 2022 at 9:03 AM  Subject: Re: Marrowstone Inn Hearing Reschedule  To: Shannen Cartmel <SCartmel@co.jefferson.wa.us>  CC: Brent Butler <BButler@co.jefferson.wa.us>, Degginger, Grant <deggingerg@lanepowell.com>, John Sampson  <john@hoedemakerpfeiffer.com>, Tori Masterson <tori@hoedemakerpfeiffer.com>    Shannen,    Hope your week is going well.     I wanted to follow up with you on the meeting time you mentioned we could schedule. Additionally as we discussed the  end of this week will be two weeks from your last email and i wanted to see what the status of the staff notes are?    Thank you for your time and help with all of this.    Looking forward to hearing from you.    Sincerely,    Andy Nordstrom     On Thu, Apr 14, 2022 at 1:25 PM Shannen Cartmel <SCartmel@co.jefferson.wa.us> wrote:  Good afternoon all,     This email is to follow up on the conversation with Andy regarding the hearing date. The hearing is rescheduled for May  26 from 1‐3 pm.     Myself, Brent, and DCD apologize for the delay but we believe it will allow a seamless process to approval. The staff  report, while substantially complete, has been determined by our director, Brent, to need legal/director review due to  the complexity of the project.     Additionally, we would like to take the opportunity with this extra timeline to introduce and discuss the proposed  conditions with both our team and yours. This will benefit the project in many ways and allow responses to any  community concerns to be thoroughly addressed. I will reach out by the end of next week to schedule a meeting. I  anticipate the staff report will be available to you within the next two weeks for review.     Exhibit 47 - Page 7 of 11 1 Helena Smith From:Josh Hamilton <jhamilton@ptleader.com> Sent:Monday, May 9, 2022 8:48 AM To:Shannen Cartmel Subject:Re: Please publish notice of rescheduled hearing once in May 11, 2022 paper Attachments:JeffCo D Quote-200136.pdf; 200136.pdf   ALERT: BE CAUTIOUS This email originated outside the organization. Do not open attachments or click on links if you  are not expecting them.      Hi Shannen, This notice has been received & is scheduled to publish in this week's 5/11 issue, as requested. Attached is a notice proof & quote for your records. All the best, Josh Hamilton   Marketing Specialist  (360)385-2900 ext. 121  jhamilton@ptleader.com      On Mon, May 9, 2022 at 8:17 AM Shannen Cartmel <SCartmel@co.jefferson.wa.us> wrote:  Good morning,     Please publish the attached one time in the May 11, 2022 paper. Thank you and have a great day.     Respectfully,      Shannen Cartmel  Lead Associate Planner  Jefferson County Community Development  scartmel@co.jefferson.wa.us  360‐379‐4454  Exhibit 47 - Page 8 of 11 2    Exhibit 47 - Page 9 of 11 From:Shannen Cartmel To:Rothwell, Rebecca (ECY) Subject:RE: public hearing for MLA21-00080 Date:Wednesday, May 11, 2022 2:45:00 PM Attachments:hearing notice final for 5-26 hearing.pdf Thanks Rebecca. I forwarded the link for the meeting and attached is the notice of hearing. Please forward on if needed. Respectfully, Shannen Cartmel Lead Associate Planner Jefferson County Community Development scartmel@co.jefferson.wa.us 360-379-4454 From: Rothwell, Rebecca (ECY) <rebs461@ECY.WA.GOV> Sent: Wednesday, May 11, 2022 1:21 PM To: Shannen Cartmel <SCartmel@co.jefferson.wa.us> Subject: RE: public hearing for MLA21-00080 ALERT: BE CAUTIOUS This email originated outside the organization. Do not open attachments or click on links if you are not expecting them. Sure, that could be helpful—thanks. Rebecca Rothwell, Shoreline Planner WA Department of Ecology | cell: 360-810-0025 This communication is a public record and may be subject to disclosure per RCW 42.56. From: Shannen Cartmel <SCartmel@co.jefferson.wa.us> Sent: Wednesday, May 11, 2022 1:20 PM To: Rothwell, Rebecca (ECY) <rebs461@ECY.WA.GOV> Subject: public hearing for MLA21-00080 THIS EMAIL ORIGINATED FROM OUTSIDE THE WASHINGTON STATE EMAIL SYSTEM - Take caution not to open attachments or links unless you know the sender AND were expecting the attachment or the link Rebecca, Do you want the information for this public hearing? This is for Marrowstone Inn proposal that we worked on recently. Exhibit 47 - Page 10 of 11 Respectfully, Shannen Cartmel Lead Associate Planner Jefferson County Community Development scartmel@co.jefferson.wa.us 360-379-4454 Exhibit 47 - Page 11 of 11