Loading...
HomeMy WebLinkAbout097A 96In the matter of.' x Revising a County project x designated as XO1243 x COUNTY OF JEFFERSON STATE OF WASHINGTON RESOLUTION NO. 97-96 IT IS HEREBY RESOLVED that Quinault - South Shore Rd. , County Road No. _ 911607., from M.P. 0.90 to M.P. 1.38., and from M.P. 3.83 to M.P. 3.97., be repaired due to flooding under emergency per Resolution No. 104-95 as follows: Emergency restoration of two sections of road including riprap and bio-engineered bank protection; roadway excavation and embankment; gravel surfacing; and fish habitat mitigation work. IT IS FURTHER RESOLVED that an appropriation from the officially adopted road fund budget and based on the County Engineer's estimate is hereby made in the amounts and for the purpose shown: PURPOSE PREVIOUS APPROPRIATION PRESENT APPROPRIATION Engineering Right of Way Acquisition $ 5,100.00 (5,100 ISTEA-ERFO) $ 2,000.00 (2,000 ISTEA-ERFO) $ 76,360.00 (76,360 ISTEA-ERFO) $ 13,500.00 (13,500 ISTEA-ERFO) Sub-Total $ 7,100.00 (7,100ISTEA-ERFO $ 89,860.00 (89,860 ISTEA-ERFO) Construction: XX Contract XX County Forces $ 854,000.00 (854,000 ISTEA-ERFO) $ 1,490,500.00 (!,490,500 ISTEA- ERFO) TOTAL $ 861,100.00 (861,100 ISTEA-ERFO) $ 1,580,360.00 (1,580,360 ISTEA- ERFO) This project is included in the officially adopted annual road program as Item No.~ The project was made a part of the officially adopted annual road program in accordance with R.C.W. 36.81.130 by resolution No. 112-95. IT IS FURTHER RESOLVED that: XX The construction is to be accomplished by contract in accordance with R.C.W. 36.77.020 et. seq. XX The construction is to be accomplished by County forces in accordance with R.C.W. 36.77.060 and W.A.C. 136.18. PASSED AND ADOPTED THIS /~:" DAY OF/~~,~. ,. Washington State Department of Transportation IAgency: JEFFERSON COUNTY IDate: November 12, 1996 LOCAL AGENCY AGREEMENT SUPPLEMENT NO. 01 FederalAid Project Number: ER-9601 (079I Agreement Number: LA- 3314 The Local Agency of Jefferson County desires to supplement the agreement entered into and executed on JULY 29, 1996 as identified above. All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: PROJECT DESCRIPTION Name: Quinault- South Shore Road Emer,qency Restoration, XO1243 Lenqth: 0.62 Termini: From M.P. 0.90 to M.P. 1.38 and from M.P. 3.83 to 3.97 Description of Work: Emergency restoration of two sections of the road as indicated above with two 10 foot lanes and 2 foot shoulders at the first location and two 9 foot lanes with 2 foot shoulders at the second location. Surface will be gravel to match existing roadway. Includes bank protection utilizing both riprap and "bio-engineered" woody debris and vegetation. Reason for Supplement: Supplement reflects P.S.&E. estimate: estimate for unanticipated mitigation required by H.P.A.; & estimate for field changes. " I~STIMATE OF F(.INDING TYPE OF WORK (1) (2) (3) (4) (5) PREVIOUS AGREE./ SUPPLEMENT ESTrMATED TOTAL ESTIMATED ESTIMATED SUPPLEMENT PROIECT FUNDS AGENCY FUNDS FEDERAL FUNDS P.E. a. AgencyWork $ 49,400 $ 10,960 $ 60,360 $ - $ 60,360 b. Other - $ 15,000 $ $ 15,000 $ $ 15,000 c. State Services $ 1,000 $ $ 1,000 $ - $ 1,000 d. Total PE Cost Estimate (a+b+c) $ 65,400 $ 10,960 $ 76,360 $ - $ 76,360 Right of Way e. Agency Work $ $ 8,000 $ 8,000 $ - $ 8,000 f. Other- $ $ 5,000 $ 5,000 $ - $ 5,000 g. State Services $ $ 500 $ 500 $ - $ 500 h. Total PJW Cost Estimate (e+f+g) $ $ 13,500 $ 13,500 $ - $ 13,500 Construction i. Contract $ 993,400 $ 351,600 $ 1,345,000 $ - $ 1,345,000 j. Other-Agency Force $ 12,000 $ 6,000 $ 18,000 $ - $ 18,000 k. Other $ $ $ $ - $ I. Other $ $ - $ $ - $ m. Total Contract Costs (i+j+k+l) $ 1,005,400 $ 357,600 $ 1,363,000 $ - $ 1,363,000 Construction Engineering n. Agency $ 79,600 $ 10,400 $ 90,000 $ - $ 90,000 o. Other- Consultant $ 30,000 $ - $ 30,000 $ - $ 30,000 ). State Forces $ 2,500 $ 5,000 $ 7,500 $ - $ 7,500 q. Total Const. Engineering (n+o+p) $ 112,100 $ 15,400 $ 127,500 $ - $ 127,500 r. Total Const. Cost Estimate (m+q) $ 1,117,500 $ 373,000 $ 1,490,500 $ - $ 1,490,500 s. TOTAL COST ESTIMATE OF THE PROJECT (d+h+r) $ 1,182,900 $ 397,460 $ 1,580,360 $ - $ 1,580,360 O Federal participation in Construction Engineering (q) is limited to 15 ~ of the Total Contract Costs. (line m, column 5) The local aj;~5;~stipulates that pursuant to said Title 23, regulations and policies and procedures, and as a condi~Jefl~payl~ent of~l~'~ eder~~bligated,~accepts and will comply with the applicable provisions. AC~~IAL ~/~// '/~-----~/ // WASHINGTON STATE {, ~...~.,~..~x ~//j/?/~ /v~ J ~ DEPARTMENT OF TRANSPORTATION ~_ Local Agency Official ~/~ ~- By: DOT '140414'1 Revised 8195 Date Executed