COUNTY OF JEFFERSON
STATE OF WASHINGTON
RESOLUTION NO. 97-96
IT IS HEREBY RESOLVED that Quinault - South Shore Rd. , County Road No. _
911607., from M.P. 0.90 to M.P. 1.38., and from M.P. 3.83 to M.P. 3.97., be repaired due to
flooding under emergency per Resolution No. 104-95 as follows:
Emergency restoration of two sections of road including riprap and bio-engineered bank
protection; roadway excavation and embankment; gravel surfacing; and fish habitat mitigation
work.
IT IS FURTHER RESOLVED that an appropriation from the officially adopted road
fund budget and based on the County Engineer's estimate is hereby made in the amounts and for
the purpose shown:
PURPOSE
PREVIOUS APPROPRIATION
PRESENT APPROPRIATION
Engineering
Right of Way
Acquisition
$ 5,100.00 (5,100 ISTEA-ERFO)
$ 2,000.00 (2,000 ISTEA-ERFO)
$ 76,360.00 (76,360 ISTEA-ERFO)
$ 13,500.00 (13,500 ISTEA-ERFO)
Sub-Total
$ 7,100.00 (7,100ISTEA-ERFO
$ 89,860.00 (89,860 ISTEA-ERFO)
Construction:
XX Contract
XX County Forces
$ 854,000.00 (854,000 ISTEA-ERFO)
$ 1,490,500.00 (!,490,500 ISTEA-
ERFO)
TOTAL $ 861,100.00 (861,100 ISTEA-ERFO) $ 1,580,360.00 (1,580,360 ISTEA-
ERFO)
This project is included in the officially adopted annual road program as Item No.~
The project was made a part of the officially adopted annual road program in accordance with
R.C.W. 36.81.130 by resolution No. 112-95.
IT IS FURTHER RESOLVED that:
XX The construction is to be accomplished by contract in accordance with R.C.W. 36.77.020 et. seq.
XX The construction is to be accomplished by County forces in accordance with R.C.W. 36.77.060
and W.A.C. 136.18.
PASSED AND ADOPTED THIS /~:" DAY OF/~~,~.
,. Washington State
Department of Transportation
IAgency: JEFFERSON COUNTY
IDate: November 12, 1996
LOCAL AGENCY AGREEMENT
SUPPLEMENT NO. 01
FederalAid Project Number: ER-9601 (079I
Agreement Number: LA- 3314
The Local Agency of Jefferson County desires to supplement the agreement entered into and executed on JULY 29, 1996 as
identified above. All provisions in the basic agreement remain in effect except as expressly modified by this supplement.
The changes to the agreement are described as follows:
PROJECT DESCRIPTION
Name: Quinault- South Shore Road Emer,qency Restoration, XO1243
Lenqth: 0.62
Termini: From M.P. 0.90 to M.P. 1.38 and from M.P. 3.83 to 3.97
Description of Work:
Emergency restoration of two sections of the road as indicated above with two 10 foot lanes and 2 foot shoulders at
the first location and two 9 foot lanes with 2 foot shoulders at the second location. Surface will be gravel to match
existing roadway. Includes bank protection utilizing both riprap and "bio-engineered" woody debris and vegetation.
Reason for Supplement:
Supplement reflects P.S.&E. estimate: estimate for unanticipated mitigation required by H.P.A.; & estimate for field changes.
" I~STIMATE OF F(.INDING
TYPE OF WORK (1) (2) (3) (4) (5)
PREVIOUS AGREE./ SUPPLEMENT ESTrMATED TOTAL ESTIMATED ESTIMATED
SUPPLEMENT PROIECT FUNDS AGENCY FUNDS FEDERAL FUNDS
P.E.
a. AgencyWork $ 49,400 $ 10,960 $ 60,360 $ - $ 60,360
b. Other - $ 15,000 $ $ 15,000 $ $ 15,000
c. State Services $ 1,000 $ $ 1,000 $ - $ 1,000
d. Total PE Cost Estimate (a+b+c) $ 65,400 $ 10,960 $ 76,360 $ - $ 76,360
Right of Way
e. Agency Work $ $ 8,000 $ 8,000 $ - $ 8,000
f. Other- $ $ 5,000 $ 5,000 $ - $ 5,000
g. State Services $ $ 500 $ 500 $ - $ 500
h. Total PJW Cost Estimate (e+f+g) $ $ 13,500 $ 13,500 $ - $ 13,500
Construction
i. Contract $ 993,400 $ 351,600 $ 1,345,000 $ - $ 1,345,000
j. Other-Agency Force $ 12,000 $ 6,000 $ 18,000 $ - $ 18,000
k. Other $ $ $ $ - $
I. Other $ $ - $ $ - $
m. Total Contract Costs (i+j+k+l) $ 1,005,400 $ 357,600 $ 1,363,000 $ - $ 1,363,000
Construction Engineering
n. Agency $ 79,600 $ 10,400 $ 90,000 $ - $ 90,000
o. Other- Consultant $ 30,000 $ - $ 30,000 $ - $ 30,000
). State Forces $ 2,500 $ 5,000 $ 7,500 $ - $ 7,500
q. Total Const. Engineering (n+o+p) $ 112,100 $ 15,400 $ 127,500 $ - $ 127,500
r. Total Const. Cost Estimate (m+q) $ 1,117,500 $ 373,000 $ 1,490,500 $ - $ 1,490,500
s. TOTAL COST ESTIMATE
OF THE PROJECT (d+h+r) $ 1,182,900 $ 397,460 $ 1,580,360 $ - $ 1,580,360
O
Federal participation in Construction Engineering (q) is limited to 15 ~ of the Total Contract Costs. (line m, column 5)
The local aj;~5;~stipulates that pursuant to said Title 23, regulations and policies and procedures, and as a
condi~Jefl~payl~ent of~l~'~ eder~~bligated,~accepts and will comply with the applicable provisions.
AC~~IAL ~/~// '/~-----~/ // WASHINGTON STATE
{, ~...~.,~..~x ~//j/?/~ /v~ J ~ DEPARTMENT OF TRANSPORTATION
~_ Local Agency Official ~/~ ~- By:
DOT '140414'1
Revised 8195 Date Executed