Loading...
HomeMy WebLinkAboutBLD2022-00340_07 Building PlansRE C E I V E D BY DC D 6/ 1 4 / 2 0 2 2 UP 7 ' - 7 1 / 2 " 1 1 ' - 1 " SSTB 24 BE A R I N G F T ' G 12 ' - 5 1 / 2 " 2 S2 . 1 4 ' - 5 1 / 2 " 9' - 5 " 18 " x 8 " B E A R I N G F T ' G W/ ( 3 ) # 4 C O N T . 18 " x 8 " B E A R I N G T W / (3 ) # 4 C O N T . ( T Y P . ) 5 S2 . 1 2 A4 . 2 13 A5.3 1 A5 . 3 7 S2 . 1 3' - 0"24' - 1" 3 ' - 0 " 3 0 ' - 1 " 23 ' - 8 " 22' - 0" 2 ' - 0 " 1' - 8 " 2 ' - 6 " 2 ' - 6 " 4 A5 . 3 3 S2 . 1 9' - 1 1 / 8 " A. 1 B. 1 C.1 1. 1 2. 1 SS T B 2 4 HD U 5 SSTB24 HDU5 ST 24 SSTB24 SS T B 2 4 54 ' - 1 " 22' - 0" 8' - 9 " 13 ' - 3 1 / 8 " 1 3 ' - 1 1 1 / 4 " SS T B 2 4 6x 6 D F # 1 P O S T HD U 2 3 S3 . 1 3' - 2 1 / 8 " 3' - 7 5 / 8 " 12"x8"x8" 'DOBIE BLOCK W/ 4x4 SHOE 1 1 ' - 8 5 / 8 " 3 ' - 8 5 / 8 " 1 1 ' - 8 5 / 8 " 3' - 8 1 / 2 " 3' - 5 " 8' - 8 1/2"3' - 6 1/2" 18 " x 1 8 " x 8 " EN L A R G E D F T G 1 ' - 8 " 24 " x 8 " S H E A R W A L L FT ' G W/ ( 4 ) # 4 B A R C O N T 15 ' - 2 3 / 4 " 1 1 ' - 6 1 / 2 " 1/ 2 " x 8 " A . B . @ 2 4 " O . C . SS T B 2 4 A5 . 3 10 2' - 0 " R -10 I N S U L A T I O N A R O U N D PE R I M E T E R W H E R E F L O O R I S L E S S TH A N 2 ' B E L O W G R A D E 11 A5 . 3 S E E N O T E 1 0 ' - 6 " NO T E : W A L L L I N E 2 . 1 I S > T H A N 5 0 . TA B L E 3 B O N E R O O F 1 8 % WA L L L I N E 2 , 5 4 ' ( . 1 8 ) = 9 . 7 2 ' B R A C E D W A L L 12 ' - 0 " 8' - 7 7 / 8 " 8' - 7 3 / 4 " 8' - 8 " SS T B 2 4 SSTB 24SSTB 24 SS T B 2 4 #3 BAR @ 36" O.C. EA. WAYTIE INTO # 3 BENT INTO SLAB (TYTP.)2' - 0" 14 A5 . 3 6' - 5 3/4" 3' - 9 " EDGE OF CONC. PB S 4 4 A S2 . 2 3 D r a g T r u s s S h e a r W a l l SS T B 2 4 SH E A R W A L L F T ' G 24 " x " W / ( 4 ) # 4 B A R C O N T . A. B . S P A C I N G 3 0 : O . C . SO U T H W A L L A. B . S P A C I N G 3 6 " O . C . EA S T W A L L A. B . S P A C I N G 3 6 " O . C . EA S T W A L L A. B . S P A C I N G 3 0 " O . C . A.B. SPACING 30" O.C.NORTH WALL 2 ' - 0 " 2' - 0 " 2' - 0 1 / 8 " SL A B F L O O R H A S 2' O F C O V E R 4' - 1 5 / 8 " SS T B 2 4 HD U 5 S3 . 1 1 SS T B 2 4 HD U 5 S3 . 1 2 S3 . 1 4 (3 ) 5 / 8 " x 1 0 " A . B HD U 5 10 ' - 0 7 / 8 " 11 ' - 1 1 " 32 ' - 1 " 7 ' - 4 " 5 1 / 2 " 5 1 / 2 " (4 ) 5 / 8 " x 1 0 " A . B . (5 ) 5 / 8 " x 1 0 " A . B . 10S-3.0 9S-3.0 9 S-3.08S-3.0 9 S -3. 0 8 S -3. 0 4 S - 3 . 0 7 S - 3 . 0 5 S - 3 . 0 5 S -3. 0 4 S - 3 . 0 5 S - 3 . 0 10 S -3. 0 9 S -3. 0 11 S-3`.0 1' - 6 " 1 ' - 6 " FO U N D A T I O N V E N T FN D V E N T FN D V E N T FN D V E N T FN D V E N T Main Level Plan 9' -1 3/4"2' - 0"8"10"SIMPSON PBS66 MTL COLBASE (TYP.)(3) #3 BAR EA. WAY(4) #4 BAR BENT INTO FT'G BASE #3 STIRRUPS @ 6" O.C.6x6 COL ENTRY PAVERS 4" Lo w e r L e v e l P l a n 0' - 0" Cr a w l S p a c e 2x 4 S T U D S @ 1 6 " O . C . EX I S T ' G G R A D E 2x 4 S T U D S @ 16 " O . C . 5/ 8 " A . B . @ 3 6 " O . C . ON 3 " x 3 " x 3 / 1 6 " S T L W A S H E R 5 1 / 2 " 4" C O N C S L A B Lo w e r L e v e l P l a n 0' - 0" 1' - 6 " 8 " (3 ) # 4 B A R C O N T . RA M S E T A N C H O R Me c h . 2x 4 S T U D S @ 1 6 " O . C . Lo w e r L e v e l P l a n 0' - 0" 8" TH E R M A L B R E A K GR A D E 4" A D S DR A I N R O C K R -10 I N S U L A T I O N 2' I N F R O M E D G E & A R O U N D P E R I M E T E R WI T H L E S S 2 ' O F C O V E R 2" SNAD 4" ROCK STRUCTURAL FILL Date Drawn byPort Townsend , WA 983 360.643.3690 henry@designsbysouz a 8/ 2 6 / 2 0 2 2 7 : 5 2 : 1 4 A M S2.1New Home for Lyn & Bruce Zoellick Lyn & Bruce Zoellick 6/1 Project Status: Permit 6/13/2022 1/ 4 " = 1 ' - 0 " 1 Fo u n d a t i o n P l a n 1" = 1'-0"2 Pedestal Detail 2 1" = 1 ' - 0 " 5 Fn d D e t a i l S t o r a g e 1 1 / 2 " = 1 ' - 0 " 7 Be a r i n g F t " g FA C E O F C O N C R E T E 3/ 4 " = 1 ' - 0 " 3 Fo u n d a t i o n D e t a i l L o w e r L e v e l NOTE:SEE CRH ENGINEERING SHEET S -3.0 AS P H A L T E M U L S I O N Addendum 1 Removed Utility sink and all rough -in notes Added "HEATED" to all rooms heated ADDENDUM 2: 8/25/2022 FOUNDATION VENTS (5) EAST WALL (2) SOUTH WALL MECHANICAL VENTILATION 423 SF/50SF/CFN = 8.46 CFM RE C E I V E D BY DC D 8/ 2 9 / 2 0 2 2 RECEIVED BY DCD 6/14/2022 RECEIVED BY DCD 6/14/2022 RECEIVED BY DCD 6/14/2022 RECEIVED BY DCD 6/14/2022 RECEIVED BY DCD 6/14/2022 RECEIVED BY DCD 6/14/2022 RECEIVED BY DCD 6/14/2022 RECEIVED BY DCD 6/14/2022 RECEIVED BY DCD 6/14/2022 RECEIVED BY DCD 6/14/2022 RECEIVED BY DCD 6/14/2022 RECEIVED BY DCD 6/14/2022 RECEIVED BY DCD 6/14/2022 RECEIVED BY DCD 6/14/2022 RECEIVED BY DCD 6/14/2022 RECEIVED BY DCD 6/14/2022 RECEIVED BY DCD 6/14/2022 RECEIVED BY DCD 6/14/2022 RECEIVED BY DCD 6/14/2022 RECEIVED BY DCD 6/14/2022