HomeMy WebLinkAboutBLD2022-00354_01RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 9/6/22
RECEIVED BY DCD 9/6/22
RECEIVED BY DCD 6/21/2022
REVISED 9/6/2022
REVISED 9/6/2022
REVISED 9/6/2022
REVISED 9/6/2022
REVISED 9/6/2022
REVISED 9/6/2022
REVISED 9/6/2022
REVISED 9/6/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
3,516 sq.ft (AH, 08/15/2022)
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
X *The applicant has selected BMP T5.10A for roof stormwater
management, AH 08/15/2022*
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
Oct 06 2022
Oct 06 2022
RECEIVED BY DCD 9/6/22
RECEIVED BY DCD 9/6/22
RECEIVED BY DCD 9/6/22
RECEIVED BY DCD 9/6/22
RECEIVED BY DCD 9/6/22
RECEIVED BY DCD 9/6/22
RECEIVED BY DCD 9/6/22
RECEIVED BY DCD 9/6/22
RECEIVED BY DCD 9/6/22
RECEIVED BY DCD 9/6/22
RECEIVED BY DCD 9/6/22
RECEIVED BY DCD 9/6/22
RECEIVED BY DCD 9/6/22
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
BLD2022-00354
Oct 06 2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
RECEIVED BY DCD 6/21/2022
August 5, 2022
JOANNE VERMILION
SCOTT OHMAN
232 MARIETTA LOOP
PORT TOWNSEND WA 98368-2811
RE:SITE ADDRESS: 56 HUCKLEBERRY PL
CASE #: BLD2022-00354
JEFFERSON COUNTY
DEPARTMENT OF COMMUNITY DEVELOPMENT
621 Sheridan Street | Port Townsend, WA 98368
360-379-4450 | email: dcd@co.jefferson.wa.us
www.co.jefferson.wa.us/commdevelopment
Dear JOANNE VERMILION:
The Department of Community Development is in the process of reviewing your application. The following
information is needed to continue review of your project.
STORMWATER: A Medium Stormwater Packet, received 6/21/2022, has been submitted with the
Vermiliion Building Permit Application (BLD2022-00354). After review of the Medium Stormwater
Packet and revised site plan (received July 29th, 2022), Jefferson County Department of Community
Development identified multiple inconsistencies between the documents. Please answer the
following questions:
(1)The revised site plan and stormwater site plan show a proposed L 16 FT X W 5 FT X D 3 FT
drywell. According to the 2019 Stormwater Management Manual for Western Washington
(“2019 SWMMWW”), drywells must be at least 4 feet in depth. After review of the soil logs
attached to SEP2021-00050, the required minimum dimensions for the proposed drywell are L 7 FT x
W 7 FT x D 4 FT. Please revise the site plan and stormwater site plan with the required minimum dimensions.
(2)On the stormwater site plan, included in the Medium Stormwater Packet, the floor plan shows an
"office" adjacent to the proposed driveway. Is a garage proposed on the ground level floor, and an
"office" above on the second floor?
(3)The submitted site plans do not match the best management practices ("BMP's) selected in
the Medium Stormwater Packet. Please revise List #3 by checking off box BMP T5.12 Sheet
Flow Dispersion under “Category C: Other Hard Surfaces” (if the applicant chooses to use this BMP,
see #4 below). List #1 can remain blank because this project will not be draining to a fresh water sub
basin.
(4)The applicant is proposing 400 square feet of new driveway and parking areas. The applicant has
selected BMP T5.30 Full Dispersion in List #1 and “My project does not have Other Hard Surface
areas” in List #3 for "Category C: Other Hard Surfaces". There is not enough room for a 100-foot
vegetated flow path on the subject property, and therefore Full Dispersion is not feasible.
The applicant may want to consider using BMP T5.12 Sheet Flow Dispersion for the proposed
driveway. This BMP requires a 2-foot gravel transition zone and a 10-foot vegetated flow path. If the
applicant would like to use Sheet Flow Dispersion for driveway and parking area stormwater
runoff, please revise the stormwater site plan to show and label the 2-foot gravel transition zone and
10-foot vegetated flow path on the side of the driveway that would flow down-gradient.
(5)The applicant has selected C233 Silt Fence on page 2 and 6 of 6 of the Medium Stormwater
Placket to manage on-site soil erosion. Please revise the stormwater site plan showing and labeling
the locations of C233 Silt Fence.
Please submit the above information to the Department of Community Development within 90 days of the date
of this letter which would be 11/3/2022. Please call 360-379-4450 to speak with the assigned planner if you
have any questions.
Sincerely,
_____________________________________
Department of Community Development Staff
Amanda Hunt
Up Front Parcel
Review Parcel
Date Completed:
Owner Name:
Add. Name:
Mailing Address:
Site Address(es):
Parcel Number: S-T-R: --Total Acreage
Legal Description Land Use:
Flood District:Fire District:Planning Area:
Flood Map (FIRM) Panel No: School District Zoning:
[ ] Zoning ________________________________________________________________________________
[ ]Setbacks:Front:_______Left Side:__________Right Side: __________ Rear:_______________
Informed by JCC 18.30 or Title 17 for Master Planned Resorts:
Shoreline Setback:____________Critical Area Buffer__________________________________________
Building Setback: ______________________________________________________________________
Adjoining Forest Lands: Commercial/ ____________ Rural/______________Inholding_______________
[ ] Lots/Require Declaration of Restrictive Covenant YES NO, submitted: YES NO __________________
[ ] Legal Access to Property YES NO _____________________________________________________
[ ] Parcel Tags or Scanned Documents YES List:_Geotechnical report dated 04/13/2021
________________________________________[ ] Sepcial Reports Nearby YES NO List:____________________________________________________
[ ] Shoreline Designation: YES NO _______________________________________________________
[ ] Critical Areas
Geologically Hazardous Areas YES NO
Shoreline Slope Stability:____________Landslide____________Erosion_____Seismic___________
CMZ: none High Risk Moderate Risk Disconnected CMZ__________________________
Report Submitted________________________________________________________________________
FWHCA: YES NO Stream type: __________________________ Pond or Lake < 20 acres________
Marbled murrelet/Spotted owl_____________ marine nearshore______________
Wetlands:YES NO ___________________________________________________________________
Flood:YES NO List FIRM map:_______________________________________________________
Flood Certificate: ______________________________________________________
Aquifer Recharge Area:YES NO___________________________________________________________
SIPZ: none At Risk High Risk Coastal ________________________________________[
] Site Visit conducted YES NO _____________________________________________________
[ ]Notice Provisions/Disclosure Forest Lands:YES NO Airport YES NO MRL YES NO
Agricultural Lands: YES NO No Shooting Zone:YES NO
[ ] Archaeology:YES NO _____________________________________________________________
941400020,BLD2022-00354
05/28/2021
JOANNE VERMILION
SCOTT OHMAN
232 MARIETTA LOOP
56 HUCKLEBERRY PL
PORT TOWNSEND, WA 98368
941400020, SEP21-00050 13-30N-2W 0.26 Acres
CAPE GEORGE VILLAGE DIV 6 LOT 1 9100
N/A 1 2
N/A 50 RR-5
4 RR-5
4
4
N/A N/A N/A N/A
N/A N/A
N/A
N/A N/A N/A
No No
4 Yes Huckleberry Pl
4 Yes
4 Yes Geotechnical Report (941400018), Geotechnical Report (002131027)
4 No None
4
4
Yes
Unstable Slope None No No
None
No
No
none
Yes SUSC
Coastal
No
4 No No No
No Yes
4 No No archaeological hits observed - A.H, 08/03/2022
: Septic 08/03/2022: Building
Land Use Requirements
[ ] SEPA Required:YES EXEMPT _________________________________________________
[ ] Landscaping Required: Yes No_______________________________________________________
[ ] Parking Spaces Required NO 2 Other_______________________________________________
[ ] Building Height: 35' UBC Standard __________________________________________________
[ ]Stormwater: New Impervious Surface_____________Land Disturbing Activity ________________
Min Req #1 thru #5Stormwater Req's: Min Req #2 Min Req #1 thru #9
Engineering ________________ Drainage District Review Required___________
[ ] Stormwater Pollution Prevention Plan Submitted: Yes o ____Medium Stormwater Packet Submitted
______________________________[ ] Impervious Surface coverage percentage: __________________________________________
Resource Lands & Public: 10%Rural Residential: 25%Rural Industrial: Per UDC Sec 6.7
Rural Commercial: 60%Area of Building Coverage: 60% in Rural Industrial Lands only
[ ] ADMIN: Setbacks entered in Permit Plan case N/A YES ________________________________
New Parcel Tags entered in Permit Plan N/A YES ____________________________________
Special Reports Scanned N/A YES _________________________________________________
[ ] ADU Proposed YES NO Square Footage: ______________________
[ ] Total Building (s) Size:____________________________________________________________
RVC: 20,000 SF CC: 5,000 SF NC: 7,500 SF GC: 10,000 SF All others: subject to septic & water constraints/None specified
[ ] Road Classification:_______________________________________________________________
Road Approach:EXISTING NOT REQ'D RAP__________________________________________
[ ] Require Final Zoning Approval/inspection YES NO __________________________________________
[ ] UGA No Protest Agreement YES NO, submitted: YES NO _____________
[ ] Recorded Date of Subdivision:_______________AFN____________________________Over 5yrs=UDC
Plat Conditions:_____________________________________<5yrs=Plat Conditions on plat or Old Ordinance
Reviewed By:
Additional Notes:
2,220 sq.ft4
No
Yes
No
4
20%, RR-5 25%
3,516 square feet
4
4 N/A
N/A
N/A
4 Exempt
4 No
4 2
4
4 No
4
4
4
Private
Not REQ'D
No
4 No No N/A
N/A4
Yes (see below)
N/A
Amanda Hunt
HISTORY: Vacant property. Proposing NSFR with attached garage. Septic system approved under
SEP2021-00050. No trailers or mobile homes for residential purposes will be permitted in this Plat of Cape George
Village Division 6. NO SHOOTING AREA A Survey dated December 22nd, 2020 and recorded under AFN 639400
shows a a neighbor's parking area, path, stairs, rock wall, and garden entering the applicant's property.
Environmental Health has proposed adding barriers in the "parking area" to prevent other parties from parking on
the applicant's property. The neighbor's development will not encroach the proposed construction area of the
proposed new septic system.
GEOHAZARD AREA: According to the Jefferson County GIS maps, there is a Geological Hazardous Area
(Shoreline Slope Stability Area- Unstable Slope) located on the property. The property is located on an approximate
18% slope (JCC 18.22.510(1)(b)(ii)(A)). A Geotechnical Report, prepared by Stratum Group on April 13th, 2021,
made the following conclusion: "Based on our geologic hazard assessment, the subject property is not a landslide
or erosion hazard area and will not be at risk of landslides or erosion. Furthermore, the proposed development will
not increase the risk of landslides or erosion on or off the site".
SUSC/CARA: There is a SUSC and Coastal SIPZ located on the property. The water source will be public. No
further action required.
ASKED EH FOR SOIL LOGS (8/3/2022)- COMPLETED
AIR SENT (8/5/2022): STORMWATER : A Medium Stormwater Packet, received 6/21/2022, has been submitted
with the Vermiliion Building Permit Application (BLD2022-00354). After review of the Medium Stormwater Packet
and revised site plan (received July 29th, 2022), Jefferson County Department of Community Development
identified multiple inconsistencies between the documents. Please answer the following questions: (1) The revised
site plan and stormwater site plan show a proposed L 16 X W 5 X D 3 foot Drywell (infiltration system). According
to the 2019 Stormwater Management Manual for Western Washington, drywells must be at least 4 feet in depth.
After review of the soils logs attached to SEP2021-00050, the required minimum dimensions for the proposed
drywell is ________. Please revise the site plan and stormwater site plan with the required minimum dimensions.
(2) On the stormwater site plan included in the Medium Stormwater Packet, the floor plan shows an "office"
adjacent to the proposed driveway. Is a garage proposed on the ground level floor, and an "office" above on the
second floor? (3) The submitted site plans donot match the BMP's selected in the Medium Stormwater Packet.
Please revise List #1 (select infiltration BMP and sheet flow dispersion). Full Dispersion is not feasible. 4) Please
show location of C233 Silt Fence and the 10 foot vegetated flow path/2 foot gravel transition zone (Sheet Flow
Dispersion) on the site plans(s). Is the driveway existing?