HomeMy WebLinkAboutInterwest Construction, Inc., Change Order No. 7 - 062722 .(j,-i-WiTh 1 774 • JEFFERSON COUNTY Sheet 1 of 4 DEPARTMENT OF PUBLIC WORKS Change 7 Date: 6/10/2022 CHANGE ORDER 7(PARTS 1,2,and 3) Ordered by County Engineer under terms of ❑X Section 1-04.4 of'the Standard Specifications Contract No. ❑Change proposed by Contractor To: Interwest Construction,Inc. Endorsed by: Interwest Construction,Inc. j 609 North Hill Blvd. P di j___ ` Contractor Firm Name ! Burlington,WA.98233 �� 'Stfnature )� Dale V e62 n Cte5 lef2cAM.'� Title Consent given by Surety.•(when required) Project Title ^ SR 116 and Cedar Ave.Ped.-Bike Improvements \ By: Project No.1802057 ' Attorney-in-fact Dare • y-- You are ordered to perform the following described work upon receipt of an approved copy of this change order: PART 1:VEGETATED FILTER STRIP REBUILD New Item 55 Vegetated Filter Strip Rebuild,Est,(Force Account) This change order adds one new item "Item 55 Vegetated Filter Strip Rebuild,Est.(Force Account)"per Standard Specification 1-04.4. This change order provides for removing the previously placed coarse compost from the Vegetated Filter Strip Sta.21+61.63 to sta.25+84.02,mixing it with Crushed Surfacing Top Course(CSTC),and placing '---1 and compacting the coarse compost and CSTC mixture back in the Vegetated Filter Strip to provide a firmer surface. Estimated cost is: $1,790.76(Labor+Equipment) Existing Item 14 Crushed Surfacing Ton Course,Ton This change order provides for the addition of Crushed Surfacing Top Course(CSTC)to the Vegetated Filter Strip material. This will require 13.98 Tons of CSTC. Estimated cost is:$743.95(Material) • Total Change Order 7,Part 1 Summary: Total Estimated Net Cost Change:$2,534.71 Change in Contract Time:0 additional Working Days PART 2:ADJUST WATER VALVE CASING IN PATH TO GRADE New item 56 Adjust Water Valve Casing,Est.(Force Account' This change order adds one new Item"Item 56 Adjust Water Valve Casing,Est.(Force Account)"per Standard Specification 1-04.4. This change order provides for adjusting the exisitng water valve casing in the Path at sta.34+45 to final grade. Estimated cost is:$474.99(Labor+Equipment) Existing item 16 Commercial HMA,Ton This change order provides for the addition of Commercial HMA for repairing the surface around the adjusted water valve casing in the Path. This will require 1.12 Tons of Commercial HMA. Estimated cost is:$179.20(Material) Total Change Order 7,Part 2 Summary: Total Estimated Net Cost Change:$654.19+$59.53(9.1%Sales Tax)=$713.72 Change in Contract Time:0 additional Working Days 1 . Sheet 2 of 4 PART 3:ADJUST VEHICLE GATE AT PATH END New Item ST Adiust Vehicle Gate at Path End,Est.(Force Account) This change order adds one new item"Item 57 Adjust Vehicle Gate at path End,Est,(Force Account)per Standard Specificcation 1-04.4. This change order provides for the vertical adjustment of the easterly half of the vehicle swing gate,at the west end of the Path,to provide clearance above the asphalt pavement. Estimated cost is:$290.22(Labor+Equipment+Material) Change in Contract Time:0 additional Working Days Total Change Order 7,Part 3 Summary: Total Estimated Net Cost Change:$290.22+$26,41(9.1%Sales Tax)=$316.63 Change in Contract Time:0 additional Working Days Total Change Order 7 Summary $2,534.71 Part 1:Vegetated Filter Strip Rebuild $713.72 Part 2:Adjust Water Vavlve Casing in Path to Grade $316.63 Part 3:Adjust Vehicle Gate at Path End $3,565.06 Total Estimated Net Cost Change All work materials and measurement to be in accordance with the provisions of the standard specifications and special provisions for the ype of construction involved. ORIGINAL CURRENT ESTIMATED ESTIMATED CONTRACT CONTRACT NET CHANGE CONTRACT TOTAL AMOUNT AMOUNT THIS ORDER AFTER CHANGE $573,723.61 $591,556.98 $3,565.06 $595,122.04 ORIGINAL CURRENT CONTRACT TIME NEW CONTRACT CONTRACT TIME CONTRACT TIME CHANGE(Add/Del) TIME 75 Working Days 80 Working Days 0 Working Days 80 Working days APPROVAL RECOMMENDED APPR V I COMMENDED El '-ro-24- 4 Prof et Man. f Date County Engineer Date AP r OVA 1 MMENDED A0VED r (a�t � V v��� 6/Z7/i Engineering ry Manager Date Chair,Jefferson County Commissioners Date ' e £ 1 T i N # i z 1 O OO to • �� 00 O o. O 0 0 - �n r €€€ i O O, O, M M C. O m 1 i w ( Nk O N , 0 4 un O� N N O S N .M-i !d,U ( _ 6R l� 6A s 69 et V' ##( b9 �p 69� fR. 6R S, 69 19 d 6A 6A GR G9 69 64 F s p O O N N �t w7 0 f 01' �. O p., L L'Ip,O o, o� O oO 00 z 0 shN M p [� N. C N a. i Gs 6A -- EA fe 6M9 3 FJ9 EA X I i Q Z -- O O i O O O 1 ^. e y I w ! s ( (:) rilld } I i "0 11 € f W j H I U CSO - € N N ( p f O I O • es ti I �, c I �I/1111 ill. 0 m -oI 1 I Wi j Y ^ w - I L F 1 - 1 !61 ' O1 O IId vl! co �% �1 vN O( I -Of f o - 01 O,EA i FGIQ WF€ j 4 iO O of c 69 I 6A Ki 1:,' ' rI � f- o€ S 01 O Oa� � z OI O — ool o O; O O 4V1 X , W '4 #a 1/40 i1 t I Os ,0 k �( O Oi 244 C �yf es Z F W O O - - iii AE O] O - OO C O — N1O{ O O; O p p O b9 b9.0 F.1U` E-1›.i I CA I ! 1 1 Ell H! i O'C• A,_ a #Z � a f H f U o. �' h ' A# P ¢ ¢ o 0 0 O.t -';1 Z H Eo Z w r- ! 1 >C u 7 7 EMI E r F� �( 2' OO I __ W w3i 1 �� ! - z , y I. x x A `.Gi' " F0 y ' I , I I: -a V Vi V >` 3 3 N 0 E o F" v'' b� o� � � U F ¢ ¢ u ¢ U c.� 1 � , E~ 3E N o 3 'I j � Hw � ^ � � N ' — NF'W t Gf � E O (�; F H 1 75I i o a3 vl �' ` a 3 vD1 Ili' z � � w � ¢I i",n181 - jaz1 o. z w . ,. . , f ' 1 I N N N en CR C) (1 ri Z p i 0 0 0 • 4 0 .‹ Ci Ch ON = 44 N N eN 4 EA CA — EA re) ...Z.-in -a N Z C4 H‹ g 6- ,;(**4 z 0 '4i ch 1 N VI • 1 i 1 rz 0 a 6 i 1 E-• , 1 , IZ 0 6 i 3 t 1 •71-%1 1-; 1.74 a) V 1 I ELJ Efi =0 'f-, I e•1 011 a ,—Ts 1101° 6 6 6 1)EA EA EA [ 1 g I i - _ 1 0.1 c:, c, ir- tX b 1 CI ' 1 1 0 c.), W4 a 1 a a a C.., 6 1 6 cA, i W ' U IC ! 1 = 1M LI W, Z Z E"! <I a. i 4 I E`l ItE144) 0• W 0 0 • • .-c-A .c) i -g cu WI I > "Ci I LLI C I eil 1VW 1=1 • E-, Q.1 F.• rn 1:4 < 810 rx 4 —. N A... ,4.. .W E-. o if; 0 f-, = H Z CA , , Department of Public Works O Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Mark McCauley, County Administrator From: Monte Reinders, P.E., Public Works Director/County Engineer Agenda Date: June 27, 2022 Subject: Change Order No. 5, 6, and 7, for SR 116 and Cedar Avenue Pedestrian - Bike Improvements Project, Project No. 1802057, County Road No. 637109, WSDOT Project No. HLP-SR19(006) Statement of Issue: Change Orders No. 5, 6, and 7 with Interwest Construction, Inc. of Burlington, Washington. Analysis/Strategic Goals/Pro's £t Con's: These change orders consists of: Change Order No. 5: Removal of a segment of cement conc. driveway entrance and traffic curb and gutter at the 1ST Street and Cedar Ave. intersection. This work is necessary to correct the Plan dimension of a too-high gutter-lip, correct omission of the detectable warning surfaces by the contractor, and allow for construction of an ADA compliant cement conc. driveway entrance and traffic curb and gutter, for the two proposed pedestrian crossings at that intersection. Change Order No. 6: Removal of unsuitable native material from the Multi-use Path location, and replacement with crushed surfacing top course material to provide for a sound base for the path. Change Order No. 7: Part 1: Addition of crushed surfacing top course to the Vegetated Filter Strip to provide a firmer surface. Part 2: Adjustment of the existing water valve casing to finished grade in the Multi- use Path. Part 3: Adjustment of the vehicle swing gate at the west end of the Multi-use Path to provide clearance above the asphalt pavement. Fiscal Impact/Cost Benefit Analysis: Change Order No. 5 adds $2,742.60 and 1/2 Working Day. Change Order No. 6 adds $5,141.14 and no Working Days. Change Order #7 adds $3,565.06 and no Working Days. This project is funded at 100% by a WSDOT Safe Route to School Program (State) grant. Department of Public Works O Consent Agenda Page 2 of 2 Recommendation: Public Works recommends that the Board authorize Change Order No. 5, 6, and 7 with Interwest Construction, Inc., and return two originals of each to Public Works for further processing. Department Contact: John Wayand, Project Manager, 385-9377. Revie By: /(z 7 /.2- Z— Mark McCaul , County Administrator Date