Loading...
HomeMy WebLinkAbout010 76COUNTY ROAD PROJECT NO. 404 BEFORE THE BOARD OF JEFFERS'O2{ CObI'::T'Y ......... ~ '~'~" ~- STATE OF WASHINGTON In the matter of the Hazel Point Road~ County Road No. 16-18.44 ) ) Resolution to improve by surfacing IT IS HEREBY RESOLVED BY THE BOARD OF COUNTY COmmISSIONERS that it is their intention to improve 0.9 mile of the Hazel Point Road with light bituminum surface treatment and screened gravel surfacing. RE IT FURTHER RESOLVED THAT for the foregoing proper county' road purpose there is hereby aD~ropriated sums in the following detail: ALLOCATIOi~S: Road Funds Previous Total Location Engineering $~ $. $. Right of Way Items of Work: Day Labor Contract Constructmon Engineering Total 12,000. O0 12~000.00 $ 12,000.00 12~000.00 The county road purpose herein descrmbed is HEREBY DECLARED to be a public necessitb., and the Countb' ~oad Engineer ms HEREBY ORDERED AND AUTHORIZED TO report and. proceed thereon as by law' provided. BE IT FURTHER RESOLVED that this purpose be performed by day labor accordance with State of' Washington Standard, Specifications fo~ Road and Brmdge Construction as adopted by' th~s Board. ADOPTED THIS 9th day of Feb. 19 76 ATTEST: BOARD OF JEFFERSON COUNTY CO~4ISSIO~RS Chairman Member ~Tjr-""~n Ex--bTT ff6i 5 Clerk ~f t~e Board