Loading...
HomeMy WebLinkAbout018 76REs0 oN n0. COUNTY ROAD PROJECT NO. 409 BEFORE THE BOARD OF JEFFERSO: COlE,iTS oOv, ..... ,~Tm=~,~ ~,~ ........ ~ ......... , STATE OF WASHINGTON In the matter of ~ a Hadlock Street,") County Road No. 31o, State Road Log ) No. 65290, Lower Hadlock Road. ) Resolution to improve by realigning, grading, draining and surfacing. IT IS HEREBY RESOLVED BY THE BOARD OF COUNTY COF~ISSIONERS that it is their intention to realign, grade, drain and surface a Hadlock Street, County Road No. 310, State Road Log No. 65290, Lower Hadlock Road, M.P. 0.14 to M.P. 0.33, length 0.19 mile. The project is identified as No. 18 on the officially adopted County annual road program pursuant to RCW 36.81.130. BE IT FURTHER RESOLVED THAT for the foregoing proper county road purpose there is hereby appropriated sums in the following d~tail: ALLOCATIONS: Road Funds Previous Total Location Engineering Right of Way Items of Work: Day Labor Contract Construction Engineering Total 16~afi an 16 500.00 · ~.500.D~ _ 1 500.00 $,, ~8,ooo.oo , 18,ooo.oo The county road purpose herein described is HEREBY DECLARED to be a public necessitb, and the County Road Engineer zs HEREBY ORDERED AND AUTHORIZED TO report and, proceed thereon as by law provided. BE IT FURTHER RESOLVED that -this purpose be performed by day labor accordance with State of Washington Standard. Specifications for Road and Bridge Construction as adopted by' thzs Board. in ADOPTED THIS ,., 2Znd day of March 19 76 BOARD OF JEFFERSON COUNTY COMMISSIONERS ATTEST: .... · , '~-6-~-~,,~~-or and ~x-o£fiei6 ~ C let ~/of~/t he Board. Chairman Member Member