COUNTY OF JEFFERSON
STATE OF WASHINGTON
In the Matter of x
Adoption of the x
Six Year Transportation x
Improvement Program x
1994-1999 x
WE, the Board of County
RESOLUTION NO. 56-93
Commissioners, Jefferson County, State of Washington,
having consulted the PRIORITY ARRAY PROGRAM and the BRIDGE CONDITION
REPORT,
do
hereby
approve and adopt the
YEAR
following attached
SIX
TRANSPORTATION IMPROVEMENT PROGRAM for the years 1994 through 1999,
ADOPTED and signed this
SEAL:
s-..o;;
""'/~"',' Y" 'ø¡'~,
'\,~ r::~'" '.,/~
...~ .:..;". 11 \.'. "", ~t~
'"} f~ ~., ""'" ~ ð \t,
.:' ;' or .. . ...,¡'. #~ Ù
: ; "\' /.;\1.", ~ ~~
. ' - " , ~ ,
,: ' " '...
\-' "'1
~ -", . . \ ",;, I: J. ~ ~ .'
..... ",V .'(- \.::...:..-.J " .
'..;:"::' Jt",. , .' j"" ./
'., f. S 0 It t ~/ ...;../
, ,,:;;:..,.,,~
A TrEST:
()P G-Ul a if, M«-,'
Lorna L. Delaney
Clerk of the Board
!rj ~ day of June, 1993.
veL,
tJ I Ai: fJUt~
JEFFERSON COONTY
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1994 TO 1999
COUNTY NO: 16
HEARING DATE: 06/28/93
ADOPTION DATE: 07/06/93
RESOLUTION NO: 56-93
====================================================================================================================================
P F
R U
I N PROJECT IDENTIFICATION 1
0 CC DESCRIPTION OF WORK
R TL
1 A
T S
Y S
----PROJECT COSTS IN THOUSANDS OF DOLLARS----- FEDERAL
C F OBLIGATION
AU ---EXPENDITURE PLAN--- -----SOURCE----- PLAN
R N T L F
R D 1ST 2ND 3RD 4TH 0 0 RAP E 1ST 4TH
Y I YEAR YEAR YEAR 5TH T C CAPP D THRU THRU
N 6TH A A UATA R 3RD 6TH
G YEAR L L TIA L YEAR YEAR
===================================z================================================================================================
1 07 CHIMACUM ROAD RD. NO. 932507
M.P. 0.08 TO M.P. 0.44
CHIMACUM ROAD IMPROVEMENT TO INCLUDE WIDENING, CURBS
AND SIDEWALKS, STORM SEWERS, AND SURFACING.
XIF 4801 401 01 5201
MJR CLASS of WK: 25
WORK CODES: ABDFGHJ
TOTAL LENGTH: .36
UTILITY CODES:
161 1841 320 PE
R/W
CON
9
95
216
F.A. PROJ NO.
RS -Q161- TOT 320-0
------------------------------------------------------------------------------------------------------------------------------------
207 IRONDALE ROAD RD. NO. 933507
M.P. 0.00 TO M.P. 0.65
IRONDALE ROAD OVERLAY AND SHOULDER WIDENING
XIF 421 701 3101
MJR CLASS of WK: 35
WORK CODES: ABO
TOTAL LENGTH: .65
UTILITY CODES:
4221
7
58
63
91 2851 128 PE
R/W
CON
F.A. PROJ NO.
RS -W161- TOT 128-0
------------------------------------------------------------------------------------------------------------------------------------
309 7TH AVE. RD. NO. 665709
M.P. 0.00 TO M.P. 0.41
7TH AVE. ROAD IMPROVEMENT INCLUDING WIDENING, GRADING,
DRAINAGE, AND SURFACING
IF 151 251 1501
MJR CLASS of WK: 35
WORK CODES: ABCFG
TOTAL LENGTH: .41
UTILITY CODES: CPTW
1901 19°1
PE
R/W
CON
TOT -0 -0
F.A. PROJ NO.
-------------------------------------------------------------------------------------------------------------------_._----~---------
407 WEST END BRIDGE RAIL RETRO FIT
BRIDGE NOS. 04W, 05W, 06Y, 07W, 13W, & 27W
Retro fit Bridge rails and install approach
guardrai l.
XIF 3351 I 1
MJR CLASS of WK: 4
WORK CODES: L
TOTAL LENGTH:
UTILITY CODES: T
3351
341
1 301 PE
R/W
CON
54
247
F.A. PROJ NO.
STPH-2016- TOT 301 -0
------------------------------------------------------------------------.-----------------------------------------------------------
508 EAST END BRIDGE RAIL RETROFIT
BRIDGE NOS. 19E, & 24E.
RETRO FIT BRIDGE RAILS AND INSTALL APPROACH GUARD
RAIL.
XIF 1141 O1 O1
MJR CLASS of WK: 4
WORK CODES: L
TOTAL LENGTH:
UTILITY CODES:
O1
1141
111
I 103 PE
R/W
CON
13
90
F.A. PROJ NO.
STPH-2016- TOT 103-0
607 JEFFERSON COONTY TRANSPORTATION PLAN
------------------------------------------------------------------------------------------------------------------------------------
59
TRANSPORTATION PLAN FOR ENTIRE COONTY - IN CONJUNCTION
WITH THE REGIONAL TRANSPORTATION PLAN, GMA AND
I.S.T.E.A. REQUIREMENTS
XIF 401 301 101
MJR CLASS of WK: 8
WORK CODES: U
TOTAL LENGTH:
UTILITY CODES:
O1
8°1
211
59 PE
R/W
CON
F.A. PROJ NO.
STPF-2016- TOT --ลก9 -0
------------------------------------------------------------------------------------------------------------------------------------
709 WEST EGG AND I RD. RD. NO. 516209
0.00 TO 0.40
Preliminary Engineering, reconstruct and surface with
BST.
IF 101 5°1 1
MJR CLASS of WK: 45
WORK CODES: ABC
TOTAL LENGTH: .40
UTILITY CODES: PT
601
601
PE
R/W
CON
TOT -0 -0
F.A. PROJ NO.
------------------------------------------------------------------------------------------------------------------------------------
807 CHIMACUM RD. SOUTH RD. NO. 932507
M.P. 0.50 TO M.P. 0.95
INTERSECTION REALIGNMENTS AND IMPROVEMENTS INCLUDING
LEFT TURN CHANNELIZATION AT ELKINS RD.
Xlp 201 201 1601
MJR CLASS of WK: 2
WORK CODES: ABCDHJ
TOTAL LENGTH: .45
UTILITY CODES: CPT
2001
271
I 173 PE
R/W
CON
26
147
F.A. PROJ NO.
TOT 173-0
------------------------------------------------------------------------------------------------------------------------------------
909 SO. BOGACHIEL RD. SLIDE RD. NO. 146809
1.33 TO 1.51
Realign this portion of the road around slide area.
XIF 501 I I
MJR CLASS of WK: 1
WORK CODES: AS
TOTAL LENGTH: .18
UTILITY CODES: T
5°1
5°1
PE
R/W
CON
TOT -0 -0
------------------------------------------------------------------------------------------------------------------------------------
F.A. PROJ NO.
;"!,,
1 ¡j rAGE
00
688-A
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1994 TO 1999
JEFFERSON COUNTY
Page
2
====================================================================================================================================
P F
R U
I N PROJECT IDENTIFICATION /
0 CC DESCRIPTION OF WORK
R TL
I A
T S
Y S
----PROJECT COSTS IN THOUSANDS OF DOLLARS----- FEDERAL
C F OBLIGATION
AU ---EXPENDITURE PLAN--- -----SOURCE""- PLAN
R N T L F
R D 1ST 2ND 3RD 4TH 0 0 RAP E 1ST 4TH
Y I YEAR YEAR YEAR 5TH T C CAPP D THRU THRU
N 6TH A A UATA R 3RD 6TH
G YEAR L L TlA L YEAR YEAR
====================================================================================================================================
10 17 SO. DISCOVERY RD. RD. NO. 601517 & 601508
0.06 TO 0.68
Widen by fill ing ditches a(Id paving shoulders.
XIF 501 I 1
MJR CLASS of WK: 3
WORK CODES: ABC
TOTAL LENGTH: .62
UTILITY CODES: T
501
501
PE
R/W
CON
TOT 0 -0
F.A. PROJ NO.
------------------------------------------------------------------------------------------------------------------------------------
11 06 I.S.T.E.A. ENHANCEMENT GRANT PROJECT
PORT TOWNSEND CITY TO ADELMA BEACH
Preliminary engineering and right of way acquisition
for Phase I & II of a portion of the Olympic Discovery
Trail
XF 3751 1651 I
MJR CLASS of WK: 9
WORK CODES: NO
TOTAL LENGTH: 6.00
UTILITY CODES:
5401 2401
I 300 PE
R/W
CON
36
264
F.A. PROJ NO.
STPE-2016- TOT 300 0
1207 ANNUAL OVERLAY AND CHIP SEAL
------------------------------------------------------------------------------------------------------------------------------------
01 8041
PAVEMENT MANAGEMENT SYSTEM OVERLAYS AND CHIP SEALS
IF 1341 1341 1341 4021
MJR CLASS of WK: 5
WORK CODES: CD
TOTAL LENGTH:
UTILITY CODES:
8041
PE
R/W
CON
TOT 0 0
F .A. PROJ NO.
13
------------------------------------------------------------------------------------------------------------------------------------
36°1 36°1
PE
R/W
CON
TOT 0 -0
SAFETY PROJECTS
COUNTY WIDE
SAFETY PROJECTS
XF 6°1 6°1 601 18°1
MJR CLASS of WK:
WORK CODES:
TOTAL LENGTH:
UTILITY CODES:
F.A. PROJ NO.
1400 MISCELLANEOUS PROJECTS
------------------------------------------------------------------------------------------------------------------------------------
18°1 18°1
XF 301 301 301
MJR CLASS of WK:
WORK CODES:
TOTAL LENGTH:
UTILITY CODES:
9°1
PE
R/W
CON
TOT 0 -0
F.A. PROJ NO.
------------------------------------------------------------------------------------------------------------------------------------
15 08 PARADISE BAY ROAD RD. NO. 503608
M.P. 0.00 TO M.P. 1.53
PARADISE BAY RD OVERLAYING WITH A.C. PAVEMENT INCLUD-
ING SHOULDERS, DRAINAGE AND TRAFFIC FACILITIES.
Public Works Trust Fund
Ip I 4421 01 O1
MJR CLASS of WK: 5
WORK CODES: BDK
TOTAL LENGTH: 1.53
UTILITY CODES: PTSW
4421 4421
PE
R/W
CON
TOT 0 -0
F.A. PROJ NO.
------------------------------------------------------------------------------------------------------------------------------------
1609 BELLE STREET RD. NO. 630609
0.00 TO 0.02
Intersection improvement at SR-19, including right
of way acquisition for right turn taper and construc-
tion of taper.
XIF I 251 I
MJR CLASS of WK: 3
WORK CODES: ABD
TOTAL LENGTH: .02
UTILITY CODES: W
251
251
PE
R/W
CON
TOT 0 -0
F.A. PROJ NO.
------------------------------------------------------------------------------------------------------------------------------------
1708 DOSEWALLIPS ROAD RD. NO. 250008
M.P. 0.0 TO M.P. 0.51
REPLACE AND INSTALL GUARDRAIL, PRELEVEL AND CHIP SEAL
Xlp I 751 01
MJR CLASS of WK: 5
WORK CODES: C
TOTAL LENGTH: .51
UTILITY CODES:
751
751
PE
R/W
CON
TOT 0 -0
F.A. PROJ NO.
------------------------------------------------------------------------------------------------------------------------------------
1807 UPPER HOH RD. ENGINEERING STUDY RD. NO. 914207
2.10 TO 12.04
ENGINEERING STUDY TO BEST DETERMINE THE LOCATION
THIS ROAD
Ip I I 501
MJR CLASS of WK: 1
WORK CODES: U
TOTAL LENGTH: 9.94
UTILITY CODES:
501
501
PE
R/W
CON
TOT 0 0
F .A. PROJ NO.
---------------------------------------------------------------------------------------------------------------------.--------------
19 17 COOK AVE EXTENSION RD. NO. 629317
M.P. 0.00 TO M.P. 0.62
COOK AVENUE EXTENSION IMPROVEMENT P.W.T.F.
XP I 1 661 5541
MJR CLASS of WK: 1
WORK CODES: ABC
TOTAL LENGTH: .62
UTILITY CODES:
6201 6201
PE
R/W
CON
TOT 0 0
------------------------------------------------------------------------------------------------------------------------------------
F.A. PROJ NO.
VGl
t ~1 rAG:
00
688 - 8
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1994 TO 1999
JEFFERSON COUNTY
Page
3
====================================================================================================================================
P F
R U
I N PROJECT IDENTIFICATION /
0 CC DESCRIPTION OF WORK
R TL
I A
T S
Y S
----PROJECT COSTS IN THOUSANDS OF DOLLARS----- FEDERAL
C F OBLIGATION
AU ---EXPENDITURE PLAN--- -- -- - SOURCE -- - -- PLAN
R N T L F
R D 1ST 2ND 3RD 4TH 0 0 RAP E 1ST 4TH
Y I YEAR YEAR YEAR 5TH T C CAPP D THRU THRU
N 6TH A A UATA R 3RD 6TH
G YEAR L L TIA L YEAR YEAR
====================================================================================================================================
2009 6TH AVE. RD. NO. 667109
0.00 TO 0.18
Regrade, minor reaLignment, widen, drainage, and
surface with BST.
Ip I 1 501
MJR CLASS of WK: 34
WORK COOES: ABC
TOTAL LENGTH: .18
UTILITY COOES:
501
501
PE
R/W
CON
TOT 0 0
-----.--.----------------...-------.------------..-----------.-------------------------------------.--------------------------.-.---
21 09 E. MOORE ST. RD. NO. 677709
0.000 TO 0.25
RehabiLitation and Resurface, Minor widening
Ip 1 1 1001
MJR CLASS of WK: 34
WORK COOES: ABC
TOTAL LENGTH: .25
UTILITY COOES: CPT
F.A. PROJ NO.
1001 1001
F.A. PROJ NO.
PE
R/W
CON
TOT 0 0
----------.--..-.--------.--------------------------.-----------------------.----.------------------------------------------------.-
2209 5TH AVE. RD. NO. 669109
M.P. 0.00 TO M.P. 0.15
5TH AVENUE IMPROVEMENTS INCLUDING WIDENING, GRADING,
DRAINAGE, AND SURFACING
Ip I 1 1221
MJR CLASS of WK: 35
WORK COOES: ABCFGK
TOTAL LENGTH: .15
UTILITY COOES: CPTW
1221 1221
F.A. PROJ NO.
PE
R/W
CON
TOT 0 0
-------------------------------------------------------------------------------------------------------------------------------.----
2308 S. DISCOVERY RD RD. NO. 601508
M.P. 3.62 TO M.P. 4.56
S. DISCOVERY ROAD IMPROVEMENT INCLUDING WIDENING,
DRAINAGE, GUARDRAIL, AND BIKE FACILITIES
p 1 I 1 6761
MJR CLASS of WK:
WORK COOES: ABDFO
TOTAL LENGTH: .94
UTILITY COOES: PTWC
6761 1951 4811
F.A. PROJ NO.
PE
R/W
CON
TOT 0 0
----------------------------.----------------..-------------------------------------------------------------------------------------
2408 DUCKABUSH ROAD RD. NO. 227408
M.P. 0.00 TO M.P. 1.02
DUCKABUSH ROAD IMPROVEMENT RECONSTRUCTION WITH
CLEAR ZONES
Ip 1 1 I 6261
MJR CLASS of WK: 35
WORK COOES: ABD
TOTAL LENGTH: 1.02
UTILITY COOES:
6261 1331 4931
F.A. PROJ NO.
PE
R/W
CON
TOT 0 0
--------------------------------------------------------------.---------------------------------------------------------------------
2508 E. QUILCENE RD. RD. NO. 327508
2.57 TO 4.43
WIDEN, MINOR REALIGNMENT, SURFACE WITH BST.
p 1 I 1 11201 11201 3841 7361 PE
MJR CLASS of WK: 34 R/W
WORK COOES: ABC CON
TOTAL LENGTH: 1.86 F.A. PROJ NO.
UTILITY COOES: P TOT 0 0
------------------------------------------------------------------------------------------------.-----------------------------------
2617 MILL TRUCK ROUTE, VARIOUS RD. NOS.
LOUISA STREET TO PAPER MILL
CONSTRUCT NEW ALIGNMENT AND IMPROVE EXISTING ROUTES TO
PROVIDE ACCESS FOR TRUCKS TO MILL (GLEN COVE TRANSPORT
ATiON PLAN)
Ip 1 1 134311 34311 687127441 PE
MJR CLASS of WK: 13 R/W
WORK COOES: ABD CON
TOTAL LENGTH: 1.33 F.A. PROJ NO.
UTILITY COOES: TOT 0 0
-------------------------.------------------------------------------------------------------------------------------------------.---
2707 BEAVER VALLEY ROAD RD. NO. 941507
M.P. 6.90 TO M.P. 7.67
BEAVER VALLEY ROAD IMPROVEMENT TO INCLUDE WIDENING,
DRAINING, AND SURFACING WITH A.C. PVMNT.
XIF 1741 1 I
MJR CLASS of WK: 35
WORK COOES: ABDJ
TOTAL LENGTH: .77
UTILITY COOES:
1741
351 1391
PE
R/W
CON
rOT 0 0
------------------------------------------------------------------------------------------------------------------------------------
2807 BEAVER VALLEY ROAD RD. NO. 941507
M.P. 6.40 TO M.P. 6.90
BEAVER VALLEY ROAD IMPROVEMENT TO INCLUDE WIDENING,
DRAINING, CLEAR ZONES AND SURFACING WITH A.C. PVMNT.
XIF 3371 1 1
MJR CLASS of WK: 35
WORK COOES: ABDJ
TOTAL LENGTH: .50
UTILITY COOES:
F.A. PROJ NO.
3371
651 2721
PE
R/W
CON
rOT 0 0
0
-------------------------------------------------------------------------------------------------------------------.---------.------
2907 AIRPORT cur-OFF RD / SR-20 INTERSECTION
M.P.0.00-0.19 & 7.57-8.02
REALIGN SR-20, WIDEN AND CHANNELIZE AIRPORT CUT-OFF,
ILLUMINATION OF INTERSECTION
XIF 26°1 3381 I
MJR CLASS of WK: 16
WORK COOES: ABDHJ
TOTAL LENGTH: .64
UTILITY COOES:
F.A. PROJ NO.
5981 5981
F.A. PROJ NO.
PE
R/W
CON
TOT 0 0
----------------.--------.-----------.-----------.----------------.--------------------.-------.-----------------------------.--.---
\'01-
ì. 9 Ì'AG~
00
688 - ~
1
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1994 TO 1999
JEFFERSON COUNTY
Page
4
====================================================================================================================================
P F
R U
I N PROJECT IDENTIFICATION /
0 CC DESCRIPTION OF WORK
R TL
I A
T S
Y S
----PROJECT COSTS IN THOUSANDS OF DOLLARS----- FEDERAL
C F OBLIGATION
AU ---EXPENDITURE PLAN--- - -- -- SOURCE -- - -- PLAN
R N T L F
R D 1ST 2ND 3RD 4TH 0 0 RAP E 1ST 4TH
Y I YEAR YEAR YEAR 5TH T C CAPP D THRU THRU
N 6TH A A UATA R 3RD 6TH
G YEAR L L TIA L YEAR YEAR
====================================================================================================================================
3007 FOUR CORNERS RD./ SR-19 INTERSECTION RD. NO. 601208
1.14 TO 1.33
Intersection improvement, including re-alignment of
Four Corners Rd., left turn channelization and
illumination on SR-19
XIF 2101 1 1
MJR CLASS of WK: 12
WORK CODES: ABDHJ
TOTAL LENGTH: .39
UTILITY CODES: CPT
2101 1071 1031
PE
R/W
CON
TOT -0 -0
F.A. PROJ NO.
------------------------------------------------------------------------------------------------------------------------------------
\'GI.
t 9 rM,~
00
:~ 88 - D
"c
l
SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1994 TO 1999
JEFFERSON COUNTY
Page
5
------------------------------------------------------------------------------------------------------------------------------------
------------------------------------------------------------------------------------------------------------------------------------
SUMMARY OF COSTS BY FUNDING CATEGORY
EXPENDITURE PLAN
FUNDING PLAN
FEDERAL OBLIGATION PLAN
====================================================================================================================================
FUNDED PROJECTS 1st Year 2716 Local 2051 Years 1-3 Years 4-6 Totals
2nd Year 967 RAP 983 P E 178 0 178
3rd Year 694 CAPP 804 R/W 417 0 417
4-6 Year 672 TlA 0 CONST 616 0 616
UATA 0
Fed. 1211
T.otals ... 5049 5049 1211 0 1211
------------------------~-------------------------------------------------------------------------------------------.---------------
UNFUNDED PROJECTS 1st Year 20 Local 2885 Years 1-3 Years 4-6 Totals
(Proposed and Unknown) 2nd Year 537 RAP 1710 P E 26 0 26
3rd Year 548 CAPP 0 R/W 0 0 0
4-6 Year 6407 TIA 2744 CONST 147 0 147
UATA 0
Fed. 173
Totals ... 7512 7512 173 0 173
------------------------------------------------------------------------------------------------------------------------------------
TOTAL ALL PROJECTS 1st Year 2736 Local 4936 Years 1-3 Years 4-6 Totals
2nd Year 1504 RAP 2693 P E 204 0 204
3rd Year 1242 CAPP 804 R/W 417 0 417
4-6 Year 7079 TlA 2744 CONST 763 0 763
UATA 0
Fed. 1384
Totals ... 12561 12561 1384 0 1384
====================================================================================================================================