Loading...
HomeMy WebLinkAbout056 93 c:c' r,{.<.}. '/-'/-'1.3 COUNTY OF JEFFERSON STATE OF WASHINGTON In the Matter of x Adoption of the x Six Year Transportation x Improvement Program x 1994-1999 x WE, the Board of County RESOLUTION NO. 56-93 Commissioners, Jefferson County, State of Washington, having consulted the PRIORITY ARRAY PROGRAM and the BRIDGE CONDITION REPORT, do hereby approve and adopt the YEAR following attached SIX TRANSPORTATION IMPROVEMENT PROGRAM for the years 1994 through 1999, ADOPTED and signed this SEAL: s-..o;; ""'/~"',' Y" 'ø¡'~, '\,~ r::~'" '.,/~ ...~ .:..;". 11 \.'. "", ~t~ '"} f~ ~., ""'" ~ ð \t, .:' ;' or .. . ...,¡'. #~ Ù : ; "\' /.;\1.", ~ ~~ . ' - " , ~ , ,: ' " '... \-' "'1 ~ -", . . \ ",;, I: J. ~ ~ .' ..... ",V .'(- \.::...:..-.J " . '..;:"::' Jt",. , .' j"" ./ '., f. S 0 It t ~/ ...;../ , ,,:;;:..,.,,~ A TrEST: ()P G-Ul a if, M«-,' Lorna L. Delaney Clerk of the Board !rj ~ day of June, 1993. veL, tJ I Ai: fJUt~ JEFFERSON COONTY SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1994 TO 1999 COUNTY NO: 16 HEARING DATE: 06/28/93 ADOPTION DATE: 07/06/93 RESOLUTION NO: 56-93 ==================================================================================================================================== P F R U I N PROJECT IDENTIFICATION 1 0 CC DESCRIPTION OF WORK R TL 1 A T S Y S ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- FEDERAL C F OBLIGATION AU ---EXPENDITURE PLAN--- -----SOURCE----- PLAN R N T L F R D 1ST 2ND 3RD 4TH 0 0 RAP E 1ST 4TH Y I YEAR YEAR YEAR 5TH T C CAPP D THRU THRU N 6TH A A UATA R 3RD 6TH G YEAR L L TIA L YEAR YEAR ===================================z================================================================================================ 1 07 CHIMACUM ROAD RD. NO. 932507 M.P. 0.08 TO M.P. 0.44 CHIMACUM ROAD IMPROVEMENT TO INCLUDE WIDENING, CURBS AND SIDEWALKS, STORM SEWERS, AND SURFACING. XIF 4801 401 01 5201 MJR CLASS of WK: 25 WORK CODES: ABDFGHJ TOTAL LENGTH: .36 UTILITY CODES: 161 1841 320 PE R/W CON 9 95 216 F.A. PROJ NO. RS -Q161- TOT 320-0 ------------------------------------------------------------------------------------------------------------------------------------ 207 IRONDALE ROAD RD. NO. 933507 M.P. 0.00 TO M.P. 0.65 IRONDALE ROAD OVERLAY AND SHOULDER WIDENING XIF 421 701 3101 MJR CLASS of WK: 35 WORK CODES: ABO TOTAL LENGTH: .65 UTILITY CODES: 4221 7 58 63 91 2851 128 PE R/W CON F.A. PROJ NO. RS -W161- TOT 128-0 ------------------------------------------------------------------------------------------------------------------------------------ 309 7TH AVE. RD. NO. 665709 M.P. 0.00 TO M.P. 0.41 7TH AVE. ROAD IMPROVEMENT INCLUDING WIDENING, GRADING, DRAINAGE, AND SURFACING IF 151 251 1501 MJR CLASS of WK: 35 WORK CODES: ABCFG TOTAL LENGTH: .41 UTILITY CODES: CPTW 1901 19°1 PE R/W CON TOT -0 -0 F.A. PROJ NO. -------------------------------------------------------------------------------------------------------------------_._----~--------- 407 WEST END BRIDGE RAIL RETRO FIT BRIDGE NOS. 04W, 05W, 06Y, 07W, 13W, & 27W Retro fit Bridge rails and install approach guardrai l. XIF 3351 I 1 MJR CLASS of WK: 4 WORK CODES: L TOTAL LENGTH: UTILITY CODES: T 3351 341 1 301 PE R/W CON 54 247 F.A. PROJ NO. STPH-2016- TOT 301 -0 ------------------------------------------------------------------------.----------------------------------------------------------- 508 EAST END BRIDGE RAIL RETROFIT BRIDGE NOS. 19E, & 24E. RETRO FIT BRIDGE RAILS AND INSTALL APPROACH GUARD RAIL. XIF 1141 O1 O1 MJR CLASS of WK: 4 WORK CODES: L TOTAL LENGTH: UTILITY CODES: O1 1141 111 I 103 PE R/W CON 13 90 F.A. PROJ NO. STPH-2016- TOT 103-0 607 JEFFERSON COONTY TRANSPORTATION PLAN ------------------------------------------------------------------------------------------------------------------------------------ 59 TRANSPORTATION PLAN FOR ENTIRE COONTY - IN CONJUNCTION WITH THE REGIONAL TRANSPORTATION PLAN, GMA AND I.S.T.E.A. REQUIREMENTS XIF 401 301 101 MJR CLASS of WK: 8 WORK CODES: U TOTAL LENGTH: UTILITY CODES: O1 8°1 211 59 PE R/W CON F.A. PROJ NO. STPF-2016- TOT --ลก9 -0 ------------------------------------------------------------------------------------------------------------------------------------ 709 WEST EGG AND I RD. RD. NO. 516209 0.00 TO 0.40 Preliminary Engineering, reconstruct and surface with BST. IF 101 5°1 1 MJR CLASS of WK: 45 WORK CODES: ABC TOTAL LENGTH: .40 UTILITY CODES: PT 601 601 PE R/W CON TOT -0 -0 F.A. PROJ NO. ------------------------------------------------------------------------------------------------------------------------------------ 807 CHIMACUM RD. SOUTH RD. NO. 932507 M.P. 0.50 TO M.P. 0.95 INTERSECTION REALIGNMENTS AND IMPROVEMENTS INCLUDING LEFT TURN CHANNELIZATION AT ELKINS RD. Xlp 201 201 1601 MJR CLASS of WK: 2 WORK CODES: ABCDHJ TOTAL LENGTH: .45 UTILITY CODES: CPT 2001 271 I 173 PE R/W CON 26 147 F.A. PROJ NO. TOT 173-0 ------------------------------------------------------------------------------------------------------------------------------------ 909 SO. BOGACHIEL RD. SLIDE RD. NO. 146809 1.33 TO 1.51 Realign this portion of the road around slide area. XIF 501 I I MJR CLASS of WK: 1 WORK CODES: AS TOTAL LENGTH: .18 UTILITY CODES: T 5°1 5°1 PE R/W CON TOT -0 -0 ------------------------------------------------------------------------------------------------------------------------------------ F.A. PROJ NO. ;"!,, 1 ¡j rAGE 00 688-A SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1994 TO 1999 JEFFERSON COUNTY Page 2 ==================================================================================================================================== P F R U I N PROJECT IDENTIFICATION / 0 CC DESCRIPTION OF WORK R TL I A T S Y S ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- FEDERAL C F OBLIGATION AU ---EXPENDITURE PLAN--- -----SOURCE""- PLAN R N T L F R D 1ST 2ND 3RD 4TH 0 0 RAP E 1ST 4TH Y I YEAR YEAR YEAR 5TH T C CAPP D THRU THRU N 6TH A A UATA R 3RD 6TH G YEAR L L TlA L YEAR YEAR ==================================================================================================================================== 10 17 SO. DISCOVERY RD. RD. NO. 601517 & 601508 0.06 TO 0.68 Widen by fill ing ditches a(Id paving shoulders. XIF 501 I 1 MJR CLASS of WK: 3 WORK CODES: ABC TOTAL LENGTH: .62 UTILITY CODES: T 501 501 PE R/W CON TOT 0 -0 F.A. PROJ NO. ------------------------------------------------------------------------------------------------------------------------------------ 11 06 I.S.T.E.A. ENHANCEMENT GRANT PROJECT PORT TOWNSEND CITY TO ADELMA BEACH Preliminary engineering and right of way acquisition for Phase I & II of a portion of the Olympic Discovery Trail X F 3751 1651 I MJR CLASS of WK: 9 WORK CODES: NO TOTAL LENGTH: 6.00 UTILITY CODES: 5401 2401 I 300 PE R/W CON 36 264 F.A. PROJ NO. STPE-2016- TOT 300 0 1207 ANNUAL OVERLAY AND CHIP SEAL ------------------------------------------------------------------------------------------------------------------------------------ 01 8041 PAVEMENT MANAGEMENT SYSTEM OVERLAYS AND CHIP SEALS IF 1341 1341 1341 4021 MJR CLASS of WK: 5 WORK CODES: CD TOTAL LENGTH: UTILITY CODES: 8041 PE R/W CON TOT 0 0 F .A. PROJ NO. 13 ------------------------------------------------------------------------------------------------------------------------------------ 36°1 36°1 PE R/W CON TOT 0 -0 SAFETY PROJECTS COUNTY WIDE SAFETY PROJECTS X F 6°1 6°1 601 18°1 MJR CLASS of WK: WORK CODES: TOTAL LENGTH: UTILITY CODES: F.A. PROJ NO. 1400 MISCELLANEOUS PROJECTS ------------------------------------------------------------------------------------------------------------------------------------ 18°1 18°1 X F 301 301 301 MJR CLASS of WK: WORK CODES: TOTAL LENGTH: UTILITY CODES: 9°1 PE R/W CON TOT 0 -0 F.A. PROJ NO. ------------------------------------------------------------------------------------------------------------------------------------ 15 08 PARADISE BAY ROAD RD. NO. 503608 M.P. 0.00 TO M.P. 1.53 PARADISE BAY RD OVERLAYING WITH A.C. PAVEMENT INCLUD- ING SHOULDERS, DRAINAGE AND TRAFFIC FACILITIES. Public Works Trust Fund Ip I 4421 01 O1 MJR CLASS of WK: 5 WORK CODES: BDK TOTAL LENGTH: 1.53 UTILITY CODES: PTSW 4421 4421 PE R/W CON TOT 0 -0 F.A. PROJ NO. ------------------------------------------------------------------------------------------------------------------------------------ 1609 BELLE STREET RD. NO. 630609 0.00 TO 0.02 Intersection improvement at SR-19, including right of way acquisition for right turn taper and construc- tion of taper. XIF I 251 I MJR CLASS of WK: 3 WORK CODES: ABD TOTAL LENGTH: .02 UTILITY CODES: W 251 251 PE R/W CON TOT 0 -0 F.A. PROJ NO. ------------------------------------------------------------------------------------------------------------------------------------ 1708 DOSEWALLIPS ROAD RD. NO. 250008 M.P. 0.0 TO M.P. 0.51 REPLACE AND INSTALL GUARDRAIL, PRELEVEL AND CHIP SEAL Xlp I 751 01 MJR CLASS of WK: 5 WORK CODES: C TOTAL LENGTH: .51 UTILITY CODES: 751 751 PE R/W CON TOT 0 -0 F.A. PROJ NO. ------------------------------------------------------------------------------------------------------------------------------------ 1807 UPPER HOH RD. ENGINEERING STUDY RD. NO. 914207 2.10 TO 12.04 ENGINEERING STUDY TO BEST DETERMINE THE LOCATION THIS ROAD Ip I I 501 MJR CLASS of WK: 1 WORK CODES: U TOTAL LENGTH: 9.94 UTILITY CODES: 501 501 PE R/W CON TOT 0 0 F .A. PROJ NO. ---------------------------------------------------------------------------------------------------------------------.-------------- 19 17 COOK AVE EXTENSION RD. NO. 629317 M.P. 0.00 TO M.P. 0.62 COOK AVENUE EXTENSION IMPROVEMENT P.W.T.F. X P I 1 661 5541 MJR CLASS of WK: 1 WORK CODES: ABC TOTAL LENGTH: .62 UTILITY CODES: 6201 6201 PE R/W CON TOT 0 0 ------------------------------------------------------------------------------------------------------------------------------------ F.A. PROJ NO. VGl t ~1 rAG: 00 688 - 8 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1994 TO 1999 JEFFERSON COUNTY Page 3 ==================================================================================================================================== P F R U I N PROJECT IDENTIFICATION / 0 CC DESCRIPTION OF WORK R TL I A T S Y S ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- FEDERAL C F OBLIGATION AU ---EXPENDITURE PLAN--- -- -- - SOURCE -- - -- PLAN R N T L F R D 1ST 2ND 3RD 4TH 0 0 RAP E 1ST 4TH Y I YEAR YEAR YEAR 5TH T C CAPP D THRU THRU N 6TH A A UATA R 3RD 6TH G YEAR L L TIA L YEAR YEAR ==================================================================================================================================== 2009 6TH AVE. RD. NO. 667109 0.00 TO 0.18 Regrade, minor reaLignment, widen, drainage, and surface with BST. Ip I 1 501 MJR CLASS of WK: 34 WORK COOES: ABC TOTAL LENGTH: .18 UTILITY COOES: 501 501 PE R/W CON TOT 0 0 -----.--.----------------...-------.------------..-----------.-------------------------------------.--------------------------.-.--- 21 09 E. MOORE ST. RD. NO. 677709 0.000 TO 0.25 RehabiLitation and Resurface, Minor widening Ip 1 1 1001 MJR CLASS of WK: 34 WORK COOES: ABC TOTAL LENGTH: .25 UTILITY COOES: CPT F.A. PROJ NO. 1001 1001 F.A. PROJ NO. PE R/W CON TOT 0 0 ----------.--..-.--------.--------------------------.-----------------------.----.------------------------------------------------.- 2209 5TH AVE. RD. NO. 669109 M.P. 0.00 TO M.P. 0.15 5TH AVENUE IMPROVEMENTS INCLUDING WIDENING, GRADING, DRAINAGE, AND SURFACING Ip I 1 1221 MJR CLASS of WK: 35 WORK COOES: ABCFGK TOTAL LENGTH: .15 UTILITY COOES: CPTW 1221 1221 F.A. PROJ NO. PE R/W CON TOT 0 0 -------------------------------------------------------------------------------------------------------------------------------.---- 2308 S. DISCOVERY RD RD. NO. 601508 M.P. 3.62 TO M.P. 4.56 S. DISCOVERY ROAD IMPROVEMENT INCLUDING WIDENING, DRAINAGE, GUARDRAIL, AND BIKE FACILITIES p 1 I 1 6761 MJR CLASS of WK: WORK COOES: ABDFO TOTAL LENGTH: .94 UTILITY COOES: PTWC 6761 1951 4811 F.A. PROJ NO. PE R/W CON TOT 0 0 ----------------------------.----------------..------------------------------------------------------------------------------------- 2408 DUCKABUSH ROAD RD. NO. 227408 M.P. 0.00 TO M.P. 1.02 DUCKABUSH ROAD IMPROVEMENT RECONSTRUCTION WITH CLEAR ZONES Ip 1 1 I 6261 MJR CLASS of WK: 35 WORK COOES: ABD TOTAL LENGTH: 1.02 UTILITY COOES: 6261 1331 4931 F.A. PROJ NO. PE R/W CON TOT 0 0 --------------------------------------------------------------.--------------------------------------------------------------------- 2508 E. QUILCENE RD. RD. NO. 327508 2.57 TO 4.43 WIDEN, MINOR REALIGNMENT, SURFACE WITH BST. p 1 I 1 11201 11201 3841 7361 PE MJR CLASS of WK: 34 R/W WORK COOES: ABC CON TOTAL LENGTH: 1.86 F.A. PROJ NO. UTILITY COOES: P TOT 0 0 ------------------------------------------------------------------------------------------------.----------------------------------- 2617 MILL TRUCK ROUTE, VARIOUS RD. NOS. LOUISA STREET TO PAPER MILL CONSTRUCT NEW ALIGNMENT AND IMPROVE EXISTING ROUTES TO PROVIDE ACCESS FOR TRUCKS TO MILL (GLEN COVE TRANSPORT ATiON PLAN) Ip 1 1 134311 34311 687127441 PE MJR CLASS of WK: 13 R/W WORK COOES: ABD CON TOTAL LENGTH: 1.33 F.A. PROJ NO. UTILITY COOES: TOT 0 0 -------------------------.------------------------------------------------------------------------------------------------------.--- 2707 BEAVER VALLEY ROAD RD. NO. 941507 M.P. 6.90 TO M.P. 7.67 BEAVER VALLEY ROAD IMPROVEMENT TO INCLUDE WIDENING, DRAINING, AND SURFACING WITH A.C. PVMNT. XIF 1741 1 I MJR CLASS of WK: 35 WORK COOES: ABDJ TOTAL LENGTH: .77 UTILITY COOES: 1741 351 1391 PE R/W CON rOT 0 0 ------------------------------------------------------------------------------------------------------------------------------------ 2807 BEAVER VALLEY ROAD RD. NO. 941507 M.P. 6.40 TO M.P. 6.90 BEAVER VALLEY ROAD IMPROVEMENT TO INCLUDE WIDENING, DRAINING, CLEAR ZONES AND SURFACING WITH A.C. PVMNT. XIF 3371 1 1 MJR CLASS of WK: 35 WORK COOES: ABDJ TOTAL LENGTH: .50 UTILITY COOES: F.A. PROJ NO. 3371 651 2721 PE R/W CON rOT 0 0 0 -------------------------------------------------------------------------------------------------------------------.---------.------ 2907 AIRPORT cur-OFF RD / SR-20 INTERSECTION M.P.0.00-0.19 & 7.57-8.02 REALIGN SR-20, WIDEN AND CHANNELIZE AIRPORT CUT-OFF, ILLUMINATION OF INTERSECTION XIF 26°1 3381 I MJR CLASS of WK: 16 WORK COOES: ABDHJ TOTAL LENGTH: .64 UTILITY COOES: F.A. PROJ NO. 5981 5981 F.A. PROJ NO. PE R/W CON TOT 0 0 ----------------.--------.-----------.-----------.----------------.--------------------.-------.-----------------------------.--.--- \'01- ì. 9 Ì'AG~ 00 688 - ~ 1 SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1994 TO 1999 JEFFERSON COUNTY Page 4 ==================================================================================================================================== P F R U I N PROJECT IDENTIFICATION / 0 CC DESCRIPTION OF WORK R TL I A T S Y S ----PROJECT COSTS IN THOUSANDS OF DOLLARS----- FEDERAL C F OBLIGATION AU ---EXPENDITURE PLAN--- - -- -- SOURCE -- - -- PLAN R N T L F R D 1ST 2ND 3RD 4TH 0 0 RAP E 1ST 4TH Y I YEAR YEAR YEAR 5TH T C CAPP D THRU THRU N 6TH A A UATA R 3RD 6TH G YEAR L L TIA L YEAR YEAR ==================================================================================================================================== 3007 FOUR CORNERS RD./ SR-19 INTERSECTION RD. NO. 601208 1.14 TO 1.33 Intersection improvement, including re-alignment of Four Corners Rd., left turn channelization and illumination on SR-19 XIF 2101 1 1 MJR CLASS of WK: 12 WORK CODES: ABDHJ TOTAL LENGTH: .39 UTILITY CODES: CPT 2101 1071 1031 PE R/W CON TOT -0 -0 F.A. PROJ NO. ------------------------------------------------------------------------------------------------------------------------------------ \'GI. t 9 rM,~ 00 :~ 88 - D "c l SIX YEAR TRANSPORTATION IMPROVEMENT PROGRAM 1994 TO 1999 JEFFERSON COUNTY Page 5 ------------------------------------------------------------------------------------------------------------------------------------ ------------------------------------------------------------------------------------------------------------------------------------ SUMMARY OF COSTS BY FUNDING CATEGORY EXPENDITURE PLAN FUNDING PLAN FEDERAL OBLIGATION PLAN ==================================================================================================================================== FUNDED PROJECTS 1st Year 2716 Local 2051 Years 1-3 Years 4-6 Totals 2nd Year 967 RAP 983 P E 178 0 178 3rd Year 694 CAPP 804 R/W 417 0 417 4-6 Year 672 TlA 0 CONST 616 0 616 UATA 0 Fed. 1211 T.otals ... 5049 5049 1211 0 1211 ------------------------~-------------------------------------------------------------------------------------------.--------------- UNFUNDED PROJECTS 1st Year 20 Local 2885 Years 1-3 Years 4-6 Totals (Proposed and Unknown) 2nd Year 537 RAP 1710 P E 26 0 26 3rd Year 548 CAPP 0 R/W 0 0 0 4-6 Year 6407 TIA 2744 CONST 147 0 147 UATA 0 Fed. 173 Totals ... 7512 7512 173 0 173 ------------------------------------------------------------------------------------------------------------------------------------ TOTAL ALL PROJECTS 1st Year 2736 Local 4936 Years 1-3 Years 4-6 Totals 2nd Year 1504 RAP 2693 P E 204 0 204 3rd Year 1242 CAPP 804 R/W 417 0 417 4-6 Year 7079 TlA 2744 CONST 763 0 763 UATA 0 Fed. 1384 Totals ... 12561 12561 1384 0 1384 ==================================================================================================================================== YOlo 19 tAl,~ 00 (,88 - IE