STATE OF WASHINGTON
COUNTY OF JEFFERSON
In the matter of:
x
RESOLUTION NO.
82-95
Revising a County road
project designated as CR1219.
x
x
IT IS HEREBY RESOLVED that all bids for Oak Bay Road. (emergency
road repair). County Road No. 569908, in the area of M.P. 9.38 ,
declared an emergency by PROCLAMATION OF EMERGENCY. Resolution 23-
95, dated March 27, 1995, and includes waiver of bid procedure as
per RCW 36.40.180, be rejected for the following reason:
The extreme price differential between the Engineer's estimate of
$450,018.02 and the low bid of $746,574.80.
IT IS FURTHER RESOLVED that a temporary repair for the project will be
performed by County Forces, and that a permanent repair will be made in the
Spring/Summer of 1996.
IT IS FURTHER RESOLVED that:
The construction is to be accomplished by contract in accordance with
R.C.W. 36.77.020 et. seg.
xx
The construction is to be accomplished by County forces in
accordance with R.C.W. 36.77.060 and W.A.C. 136.18.
PASSED AND ADOPTED THIS
//~
DAY OFSf~~' F1?5.
BOARD OF JEFFERSON COUNTY COMMISSIONERS
SEAL:
".
"
,
WjST' ~ ~
n~~~E~~:" d DOC ~
"'(i1.
21 :.'C:
-' t..
n ~ttO3
JEFFERSON COUNTY
DEPARTMENT OF PUBLIC WORKS
\
1820 Jefferson Street
P.O. Box 1220
Port Townsend, WA 98368
(360) 385-9160
DATE:
September 6, 1995
TO:
Board of County Commissioners
FROM:
Klara Fabry, Director of Public Works
k:: It-I~
SUBJECT:
Recommendation for rejection of all bids for Oak Bay Road,
Emergency Road Repair, project No. CR1219.
Due to the extreme price differential between the Engineer's estimate of$450,018.02 and
the low bid amount of $746,574.80, the Public Works Department recommends that all
bids be rejected for the above referenced project.
In lieu of a complete and permanent repair at this date, Public Works recommends a
temporary repair by removal and replacement of the sloughing material with light weight
fill, armored on the surface with a moisture barrier. This work would be performed by
County forces.
The best, most feasible permanent repair will be detailed in regular contract form, to be
constructed in Spring/Summer 1996.
xc CR1219 corresp.