Loading...
HomeMy WebLinkAboutCAM2022-002777/28/22, 2:37 PM Online Appointment Scheduling Software :: Free Scheduler for Appointments https://secure.acuityscheduling.com/appointments/view/844460030?print=1 1/6 Kirsten Woodsmith Tuesday, July 5, 2022 3:00pm - 3:30pm 30min Land Use CAM Phone Call with Customer Assistance Meeting (CAM) Calendar Phone (360) 8406985 Email kwoodsmith89@gmail.com Time zone (GMT7:00) Pacic Time Scheduled by a client on June 15, 2022 at 1:53pm View all changes & notications sent LO C AT I O N Phone Call (Sta will call the phone # given) C L I E N T U S E R They haven't registered for an account Notes N OT E S A B O U T T H I S A P P O I N T M E N T No notes N OT E S A B O U T T H I S C L I E N T No notes Notes about this client show on all of their appointments Label  7/28/22, 2:37 PM Online Appointment Scheduling Software :: Free Scheduler for Appointments https://secure.acuityscheduling.com/appointments/view/844460030?print=1 2/6 History P R E V I O U S A P P O I N T M E N T None N E X T A P P O I N T M E N T Land Use CAM Phone Call CAM Details PA R C E L N U M B E R 966000401, 966000701 I N F O R M AT I O N R E Q U E S T E D - L I S T A L L Q U E S T I O N S A N D A N Y I N F O R M AT I O N YO U W O U L D L I K E T O A D D R E S S . Running electicity- Running water- Installing Septic- on parcel 966000701 in 12 years We want to make sure we are able to run electricity and water immediately after we purchase the land. We want to make sure we will be able to put in a septic system once we are ready to build. My husband and I are in the process of buying a piece of property that has two parcels. 966000701 and 966000401. The ller address is 999 Oak Bay Road Port Hadlock. We have a closing date set for July 15, 2022 if we determine feasibility for building a three bedroom home in the near future (23 years from now). Our plan is to push a driveway and a at building spot for a three bedroom house, run electricity and water to the building site and put in a septic system before building. We are able to see that it falls within a pre-1971 plat “KUHNSVILLE BLK7 lots18 less R/W” and we will need to submit an application to see if it is aected by the moratorium. I will have a question about the moratorium and whether or not that will allow me to put a septic system on the property. I have attached a document regarding a septic hole dug by Shold’s in case it has any eect on the moratorium. Our rst step will be to submit a new address application, which requires a site plan. What exactly needs to be in a site plan? How specic? Can it be a simple sketch of the driveway? Our main question for the meeting will be: Are there any reasons why we can’t build a three bedroom home with a septic on parcel 966000701 in the near future? 7/28/22, 2:37 PM Online Appointment Scheduling Software :: Free Scheduler for Appointments https://secure.acuityscheduling.com/appointments/view/844460030?print=1 3/6 P L E A S E U P L O A D A N Y D O C U M E N T S E .G . S U R V E Y S , S I T E P L A N S , M A P S E T C . T H AT M AY B E H E L P F U L F O R S TA F F T O P R O V I D E C U S T O M E R A S S I S TA N C E . Septic System Forms _ oak bay.pdf I F Y O U H AV E M O R E T H A N O N E D O C U M E N T T O U P LO A D, C L I C K "C H O O S E F I L E ..." B E LO W T O A D D A S E C O N D D O C U M E N T. Site Evaluation Info_ oak bay.pdf I F Y O U H AV E M O R E T H A N T W O D O C U M E N T S T O U P L O A D, C L I C K "C H O O S E F I L E ..." B E L O W T O A D D A T H I R D D O C U M E N T. — D O YO U N E E D T O M E E T W I T H A L A N D U S E P L A N N E R O R B U I L D I N G P L A N S E X A M I N E R ? Land Use Planner CAM Notes (internal use only) C A M # CAM202200277 P L A N N E R O R P L A N S E X A M I N E R Helena Smith Z O N I N G Rural Residential 5 acres S H O R E L I N E D E S I G N AT I O N N/A S P E C I F I C R E Q U E S T E D I N F O R M AT I O N 1. Moratorium: Yes, the parcels are impacted by the moratorium. They were subdivided in 1886. Jeerson County DCD and Environmental Public Health cannot accept applications for these parcels at this time. This includes septic, address, and building permits. The Board of County Commissioners shares updates on the moratorium during their meetings. Their website is https://www.co.jeerson.wa.us/492/Board-of-County- Commissioners 2. Building a single-family residence in the near future: Under our current code, there are no apparent barriers to building residences on these two parcels, or combining the parcels to build a single residence. It is unknown how our regulations will change when the moratorium ends, which may impact the buildability of these parcels. Please note that customer 7/28/22, 2:37 PM Online Appointment Scheduling Software :: Free Scheduler for Appointments https://secure.acuityscheduling.com/appointments/view/844460030?print=1 4/6 assistance meetings are not building or permit approvals. 3. Site Plan requirements for address application Site plans for address applications should be to scale and show the approximate driveway location, driveway length, and planned location of the residence. They can be sketched but must be to scale. 4. Site Plan requirements for building application: Here is a checklist of required information on a building site plan: https://www.co.jeerson.wa.us/DocumentCenter/View/547/Site-Plan-Checklist-PDF G E O L O G I C A L LY H A Z A R D O U S A R E A S no G E O L O G I C A L LY H A Z A R D O U S A R E A S N O T E S Jeerson County GIS shows no mapped geologically hazardous on the property. W E T L A N D S no W E T L A N D S N O T E S Jeerson County GIS shows no mapped wetlands on the property. F I S H & W I L D L I F E H A B I TAT C O N S E R VAT I O N A R E A S no F I S H & W I L D L I F E H A B I TAT C O N S E R VAT I O N A R E A S N O T E S Jeerson County GIS shows no mapped habitat conservation areas on the property. F E M A F L O O D no F E M A F L O O D N O T E S Jeerson County GIS shows no mapped FEMA ood zones on the property. C R I T I C A L A Q U I F E R R E C H A R G E A R E A no C R I T I C A L A Q U I F E R R E C H A R G E A R E A N O T E S Jeerson County GIS shows no mapped critical aquifer recharge areas on the property. 7/28/22, 2:37 PM Online Appointment Scheduling Software :: Free Scheduler for Appointments https://secure.acuityscheduling.com/appointments/view/844460030?print=1 5/6 S E AWAT E R I N T R U S I O N P R O T E C T I O N Z O N E (S I P Z ) yes S E AWAT E R I N T R U S I O N P R O T E C T I O N Z O N E (S I P Z ) N OT E S According to the Jeerson County GIS Maps, there is a Coastal SIPZ located on the subject property. If a private water source is proposed, additional measures may be required. Marine shorelines and islands are susceptible to a condition that is known as seawater intrusion. Seawater intrusion is a condition in which the saltwater/freshwater interface in an aquifer moves inland so that wells drilled on upland areas cannot obtain freshwater suitable for public consumption without signicant additional treatment and cost. Maintaining a stable balance in the saltwater/freshwater interface is primarily a function of the rate of aquifer recharge (primarily through rainfall) and the rate of ground water withdrawals (primarily through wells). The Washington Department of Ecology is the agency with statutory authority to regulate groundwater withdrawal for individual wells in Jeerson County. New development, redevelopment, and land use activities on islands and in close proximity to marine shorelines in particular should be developed in such a manner to maximize aquifer recharge and maintain the saltwater/freshwater balance to the maximum extent possible by inltrating storm water runo so that it recharges the aquifer. R E P O R T S R E Q U I R E D F O R D E V E L O P M E N T O R P R O J E C T no R E P O R T S R E Q U I R E D F O R D E V E L O P M E N T O R P R O J E C T N O T E S Our review found no critical areas that would require special reports to develop these parcel.s S E T B A C K N O T E S S P E C I F I C TO P R O P E R T Y The setback from all property lines is 20 feet. S T O R M W AT E R N OT E S — Z O N I N G N OT E S — S H O R E L I N E N OT E S N/A PA R C E L TA G N OT E S No parcel tags on either parcel. R E C O M M E N D E D N E X T S T E P S 7/28/22, 2:37 PM Online Appointment Scheduling Software :: Free Scheduler for Appointments https://secure.acuityscheduling.com/appointments/view/844460030?print=1 6/6 1. Track updates on the moratorium from the Board of County Commissioners oce. 2. After the moratorium ends, consider contacting the Jeerson County Department of Public Works to discuss a road vacation. The road vacation would eliminate the space between the parcels for creating a road. 3. Following a road vacation, the two parcels could be combined using a boundary line adjustment lot consolidation. The application form is available here: https://www.co.jeerson.wa.us/DocumentCenter/View/4918/BLALot-Consolidation-Complete-Packet A D D I T I O N A L N OT E S —