Loading...
HomeMy WebLinkAboutBLD2020-00545 - 09A Geotech Report 1 Stratum Group File: 3.10.21 PO Box 2546, Bellingham, Washington 98227 Phone: (360) 714-9409 July 22, 2022 Patrick Sheehy & Amy Poisson 8746 19th Avenue NW Seattle, WA 98117 pssheehy@gmail.com | amypoissonrocks@gmail.com tkdesignbuild@gmail.com Re: Geology Site Inspection Talons Roost Road Jefferson County Parcels 502023025 & 502023024 Brinnon, WA 98320 Jefferson County has requested that we verify that the ADU construction on the site met the following: 1) 10 foot setback of the building foundation from the face of the fill slope, 2) Stormwater management methods installed per the approved stormwater plan and 2019 SMM Standards. 3) No concentrated stormwater discharge within 10 feet from the top edge of fill slopes on the construction site, and 4) No yard waste and/or cut vegetation piled on or near slopes. We had previously completes a geology hazard assessment on the property dated April 2, 2021. Since the completion of the report, an ADU has been constructed on the building pad on the property. The ADU construction was completed in accordance to our recommendations and we have verified that four items that Jefferson County requested that we verify. Stratum Group appreciates the opportunity to be of service to you. Should you have any questions regarding this assessment please contact our office at (360) 714-9409. Sincerely yours, Stratum Group Dan McShane, L.E.G., M.Sc. Licensed Engineering Geologist