HomeMy WebLinkAboutCAM2022-00329Eric Dishington
Thursday, August 4, 2022
3:00pm - 3:30pm
30min
Land Use CAM Phone Call with Customer Assistance Meeting (CAM) Calendar
Phone (818) 468�5516
Email DISHINGTONE@GMAIL.COM
Time zone (GMT�7:00) Paci�c Time
Scheduled by a client on July 20, 2022 at 12:27pm
View all changes & noti�cations sent
LOCATION
Phone Call (Sta� will call the phone # given)
CLIENT USER
They haven't registered for an account
Notes
NOTES ABOUT THIS APPOINTMENT
No notes
NOTES ABOUT THIS CLIENT
No notes
Notes about this client show on all of their appointments
Label
History
PREVIOUS APPOINTMENT
None
NEXT APPOINTMENT
Land Use CAM Phone Call
CAM Details
PARCEL NUMBER
948602501, 021202039
INFORMATION REQUESTED - LIST ALL QUESTIONS AND ANY INFORMATION YOU WOULD LIKE TO ADDRESS.
1. May I build an industrial park on this property. Metal building with approximately 15 units, after
demolishing the existing building presently there?
2. Will I be required to upgrade my septic?
3. I do understand that the property is not zoned for Retail.
4. If I may build/develop this property, what is my next step?
Thanks
PLEASE UPLOAD ANY DOCUMENTS E.G. SURVEYS, SITE PLANS, MAPS ETC. THAT MAY BE HELPFUL FOR STAFF TO PROVIDE
CUSTOMER ASSISTANCE.
948602501.pdf
IF YOU HAVE MORE THAN ONE DOCUMENT TO UPLOAD, CLICK "CHOOSE FILE..." BELOW TO ADD A SECOND DOCUMENT.
—
IF YOU HAVE MORE THAN TWO DOCUMENTS TO UPLOAD, CLICK "CHOOSE FILE..." BELOW TO ADD A THIRD DOCUMENT.
—
DO YOU NEED TO MEET WITH A LAND USE PLANNER OR BUILDING PLANS EXAMINER?
Building Plans Examiner
CAM Notes (internal use only)
CAM #
CAM2022�00329
PLANNER OR PLANS EXAMINER
Helena Smith
ZONING
Light Industrial and Commercial for 948602501, Rural Residential 1:5 for 021202039
SHORELINE DESIGNATION
N/A
SPECIFIC REQUESTED INFORMATION
1. May I build an industrial park on 948602501. Metal building with approximately 15 units, after
demolishing the existing building presently there?
Zoning allows light industrial use. An industrial park would be allowed if all the industrial uses were
light. The park could not sell products, only services.
2. Will I be required to upgrade my septic?
The Department of Environmental Public Health sets septic standards. Contact their department to
learn septic requirements for this project. They have walk-in hours with a sanitarian every business day
from 9�10:30 AM. You can also visit their website at https://www.co.je�erson.wa.us/204/Environmental-
Public-Health
3. I do understand that the property is not zoned for Retail.
Correct. Per Je�erson County Code Chapter 18.20.220(c), "retail sales and services incidental to a
principally permitted use are allowable, provided:
(i) The operations are contained within the main structure which houses the primary use;
(ii) Retail sales occupy no more than 15 percent of the total building square footage;
(iii) No retail sales or display of merchandise occurs outside the structure; and
(iv) All products o�ered for retail sales on the site are manufactured, warehoused, or assembled on the
premises (except for products sold at colleges or technical schools)."
4. If I may build/develop this property, what is my next step?
See Recommended Next Steps section below.
5. What is the zoning for 021202039?
Our Public Land Records GIS map (available online at https://je�cowa.maps.arcgis.com
/apps/webappviewer/index.html?id=cad59b765ee942d4b49077da70a4b131 ) shows that the parcel is
zoned RR�5, Rural Residential. This zoning was most recently con�rmed by the Je�erson County
Comprehensive Plan of 2018. Exhibit 1�8, the Land Use/Zoning Map on Page 1�16, shows the parcel
within Rural Residential Zoning. The County Comprehensive Plan is available at
https://test.co.je�erson.wa.us/WeblinkExternal/DocView.aspx?id=1924551&dbid=0&repo=Je�erson
GEOLOGICALLY HAZARDOUS AREAS
no
GEOLOGICALLY HAZARDOUS AREAS NOTES
No geologically hazardous areas are mapped on the parcel.
WETLANDS
no
WETLANDS NOTES
No wetlands are mapped on the parcel.
FISH & WILDLIFE HABITAT CONSERVATION AREAS
no
FISH & WILDLIFE HABITAT CONSERVATION AREAS NOTES
No Fish & Wildlife Habitat Conservation areas are mapped on the parcel.
FEMA FLOOD
no
FEMA FLOOD NOTES
No FEMA �ood zones are mapped on the parcel.
CRITICAL AQUIFER RECHARGE AREA
no
CRITICAL AQUIFER RECHARGE AREA NOTES
No Critical Aquifer Recharge areas are mapped on the parcel.
SEAWATER INTRUSION PROTECTION ZONE (SIPZ)
no
SEAWATER INTRUSION PROTECTION ZONE (SIPZ) NOTES
No Seawater Intrusion Protection Zones are mapped on the parcel.
REPORTS REQUIRED FOR DEVELOPMENT OR PROJECT
no
REPORTS REQUIRED FOR DEVELOPMENT OR PROJECT NOTES
—
SETBACK NOTES SPECIFIC TO PROPERTY
55 ft setback from Highway 20
10 ft setback from other parcels
Area within setbacks is approximately 20,640 square feet, or 0.47 acres. Allowable impervious surface
coverage is 0.41 acres.
STORMWATER NOTES
This project would require a Large Stormwater Application, which is available online at:
https://www.co.je�erson.wa.us/DocumentCenter/View/7444/Large-Stormwater-Packet-_combined
Stormwater Manual:
https://fortress.wa.gov/ecy/ezshare/wq/Permits/Flare/2019SWMMWW/2019SWMMWW.htm#Topics
/VolumeV/DispersionBMPs/BMPt530.htm
An Engineered Stormwater Plan will be required if the project meets any of the criteria below:
- Sites with greater than 15% slopes may require applicants hire a geologist to recommend if a drainage
method is appropriate.
- If you cannot do full dispersion on parcels larger than 5 acres, engineering is required.
- Discharging directly to a marine water via tight line must be engineered.
- Other site constraints (i.e. critical areas, setbacks, lot size, etc.) that would require engineered
consultation and design
ZONING NOTES
Light Industrial/Commercial zoning.
Allowable uses for this zoning are listed in Je�erson County Code Chapter 18.15 Table 3�1. That chapter
is available online at:
https://www.codepublishing.com/WA/Je�ersonCounty/#!/Je�ersonCounty18
/Je�ersonCounty1815.html#18.15.040
SHORELINE NOTES
N/A
PARCEL TAG NOTES
Parcel tag noting that the setback from Highway 20 is 55 ft. Additional parcel tag noting the well on site
in the Southwest corner approximately 15 ft from both lines. See SEP1976�00128.
RECOMMENDED NEXT STEPS
1. Contact Environmental Public Health to learn about septic requirements for a new industrial park, and
for setbacks from the well in the Southwest corner.
2. Review Je�erson County Code Chapter 18.20.220 -- Industrial uses – Standards for site development,
to ensure any businesses in the industrial park meet the following requirements:
"(1) All Industrial Uses. The following standards apply to all industrial uses as listed in Table 3�1, all
industrial uses identi�ed in Chapter 18.18 JCC (Irondale and Port Hadlock UGA Implementing
Regulations), and to those other uses determined by the administrator to be industrial uses:
(a) The use of chemicals, industrial solvents, or other noxious or hazardous substances shall comply
with all federal, state, and county safety, �re, structural, storage, and disposal standards.
(b) Water supplies, wastewater, and sewage disposal facilities adequate to serve the proposed use
shall be provided. Industrial wastewaters shall not be discharged into an on-site septic system and are
subject to waste discharge permit requirements established by the water quality program of the
Washington Department of Ecology.
(c) Retail sales and services incidental to a principally permitted use are allowable, provided:
(i) The operations are contained within the main structure which houses the primary use;
(ii) Retail sales occupy no more than 15 percent of the total building square footage;
(iii) No retail sales or display of merchandise occurs outside the structure; and
(iv) All products o�ered for retail sales on the site are manufactured, warehoused, or assembled on the
premises (except for products sold at colleges or technical schools).
(d) No use shall be made of equipment or material which produces unreasonable vibration, noise, dust,
smoke, heat, glare, odor, or electrical interference to the detriment of the quiet use and enjoyment of
adjoining property.
(e) Use of a county access road or private road for access to new industrial development shall be
permitted only if the applicant demonstrates that public health, safety and welfare will be protected,
and if tra�c and maintenance impacts to the private road are minimized by conditions on the permit.
(f) Development standards, including parking, visual screening and landscaping requirements, shall be
as speci�ed in Chapter 18.30 JCC, Development Standards, for rural industrial uses and as speci�ed in
Chapter 18.18 JCC (Irondale and Port Hadlock UGA Implementing Regulations) for urban industrial uses,
except as otherwise provided for in this chapter.
(2) Light Industrial Uses – Additional Standards. All operations other than loading and unloading shall
be conducted within a fully enclosed building, except for concrete batch plants located in an urban
district subject to the requirements of this chapter. [Ord. 8�06 § 1]"
3. Apply for a demolition permit to remove the current structure. That form is on our website at
https://www.co.je�erson.wa.us/DocumentCenter/View/530/Demolition-Permit-Application-PDF
4. Apply for a Type I building permit to construct the industrial park. The permit application should
include a Large Stormwater Packet. Those permit application forms are available on the county website
at: https://www.co.je�erson.wa.us/283/Building-Permit-Forms
ADDITIONAL NOTES
https://www.codepublishing.com/WA/Je�ersonCounty/#!/Je�ersonCounty18
/Je�ersonCounty1820.html#18.20.220