Loading...
HomeMy WebLinkAbout051 75RESOLUTICNd NO. SZL- s� COUNTY ROAD PROJECT NO. X97 BEFORE THE BOARD OF JEFFERSON COUNTY COME= SSIOXERS, STATE OF WASHINGTON In the matter of the Gardiner -Grant Rd.) Resoiutioii to improve by Widening, and Co. Rd. #104 -0.22, State Rd. Log ) Grading, and Draining, and Surfacing . #3886 (A.K.A., Gardiner Beach Loop Rd.� IT IS HEREBY RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS that it is their intention to improve 0.5 miles, more or less, by Widening, Grading, Draining, and Surfacing; a portion of the Gardiner Grant Road. BE IT FURTHER RESOLVED THAT for the foregoing proper county road purpose there is hereby appropriated sums in the following detail: ALLOCATIONS: Road Funds Previous Total Location Engineering $ 2 000.00 $ $ 2non_nr Right of Way 5,000.00 5-non on Items of Work: Day Labor 16,000.00 16.00n_on Contract Construction Engineering 2,000.00 Total $ 25,000.00 25'nnn n0 The county road purpose herein described is HEREBY DECLARED to be a public necessit' and the Count; Road Engineer is HEREBY ORDERED AND AUTHORIZED TO report and proceed thereon as by law provided. BE IT FURTHER RESOLVED that this purpose be performed by DAY LABOR in accordance with State of Washington Standard. Specifications for Road and Bridge Construction as adopted by th s Board. ADOPTED THIS 18 t day of AUGUST 19 7_ �QgNTY "ttv low i a p a I le SEAL ATTEST: oun ditor an - officio Clerk the Boar VOL BOARD OF JEFFERSON COUNTY COMMISSIONERS Member —'� 1 wU 0 104