Loading...
HomeMy WebLinkAbout070 75RESOLUTION N0. 'fAt' COUNTY ROAD PROJECT NO. 375 BEFORE THE BOARD OF JEFFERSON COUNTY COI&fISSIONERS, STATE OF WASHINGTON In the matter of the Black Point Road County Road Number 62 Resolution to improve by grading, draining, and surfacing about 1.14 miles thereof. IT IS HEREBY RESOLVED BY THE BOARD OF COUNTY COMISSIONERS that it is their intention to improve by grading, draining, and surfacing 1.14 miles of the Black Point County Road Number 62. BE IT FURTHER RESOLVED THAT for the foregoing proper county road purpose there is hereby appropriated sums in the following detail: ALLOCATIONS: Road Funds Previous Total Location Engineering Right of ;lay Items of Work: Day Labor Contract Construction Engineering Total $ o 270.00 , 2900.00 1720.00 5481.05 $in, 371 o5 $ 7,500 12,500 0 75,000.00 5000.00 $ 7,500.00 2900.00 76,720.00 10481.05 The county road purpose herein described is HEREBY DECLARED to be a public necessit„ and the County Road Engineer ,.s HEREBY ORDERED AND AUTHORIZED TO report and proceed thereon as by law provided. BE IT FURTHER RESOLVED that this purpose be performed by DAY LABOR and Coa�t,faet accordance with State of Washington Standard Specifications for Road and Bridge Construction as adopted by th s Board. ADOPTED THIS —th day of October 19 75 SEAL ATTEST: , u BOARD OF JEFFERSON COUNTY Chairman Member Cbu�3 Auditor and -of ficid -� Cleri: of the Board V0+. 1 FAu 01213