Loading...
HomeMy WebLinkAboutC 263 . - RESOLUT ION NO. ~ .,. .~ /, '3 COUNTY ROAD PROJECT NO. ~6 ".... BEFORE 'l.'HE BOA;\!) OF JEFFERSON COUNTY. COhNISSIONERS, STATE OF 1rJASHINGTON. In the matter of the Nordland Roa.d (County Road No. 53) . ) Resolution to re~lace the existing bridge ) with concrete culvert pipe and to ) realign the existing road by grading, draining and surfacing. ~ IS nEREBY RESOLVED BX THE BOARD OF CoUNTY CCt:HIS3IONERS that it is th"3i,r : !:'tcntion to replace the existing bridge with concrete 4ul.vert pipe and to realign the existing read by grading, draining and surfacing. BE I'l' lUR'rmm li.,SSCLVED THN!' for the foregoing proper county road purpose 'Lhere is hereby ap;J!'onriated sums in the following detail: Loc.. Engr. Right of Way Items of Work: Day Labor Contract Constr. Engr. Gas Tax Funds Donations, etc. Other $ $ $. Tot aJ. $ 7.0OQ",OO 7 .000.00_ Tot a1 $ 7.000,00 $ $ .._ $. 7 JlOOO.OO The county road purpose herein described is HEHEl3Y DECLf\filiD to be a public necessity and the County Road Engineer is HEREBY ORDERBD AND' AUT~IORIZED to report and proceed thereon as b:'f la'-1 provided. BE IT }'URl''!ER RESOLVED that this purpose be performed by . day labor in accordance with the Standard Roau and Bridge Specifications of the State of Washington as Rdopted by this Board. g ADOPTED this day of ~ 19~; - ,- ? -< SEAL . - - -:,,-: ~ /, ~_:~~ ountY-~ ~d Eoc-ofticio Clerk <>f' tho Board. By Deputy' Auditor. Hember ~~ \(~"-~ .6_:"'~-~ ,~'"