Loading...
HomeMy WebLinkAboutChange Order #1 Ovivo Department of Public Works 0 Consent Agenda Page 1 of 1 Jefferson County Board of Commissioners Agenda Request To: Board of Commissioners Mark McCauley, County Administrator From: Monte Reinders, P.E., Public Works Director/County Engineer//' Agenda Date: September 19, 2022 Subject: Change Order #1, Ovivo USA, LLC Port Hadlock Wastewater Project Statement of Issue: Execution of Change Order #1 to the contract with Ovivo USA, LLC for supply of the Membrane Bioreactor (MBR) wastewater treatment plant equipment for Port Hadlock. Analysis/Strategic Goals/Pro's Et Con's: Change Order #1 adds $6,098 to the contract for a larger Waste Activated Sludge (WAS) pump which is necessary to add sludge thickening to the process. Since the bid was submitted, the County and its engineers have determined that sludge thickening wilt provide an operational cost savings for the treatment process; however a larger pump is required. Fiscal Impact/Cost Benefit Analysis: Change Order #1 is for $6,098. Funding for this work comes from State Dept. of Commerce revenue that has been dedicated to this project. Recommendation: Public Works recommends that the Board sign Change Order #1 where indicated and return all three (3) originals to Public Works for further processing. Department Contact: Monte Reinders, Public Works Director x242. Reviewed By: ' /3 Mark McCau , County Administrato Date CHANGE ORDER NO.: 1 Owner: Jefferson County Engineer: Tetra Tech, Inc. Seller: Ovivo USA, LLC Project: Port Hadlock Wastewater Contract Name: Port Hadlock Wastewater Date Issued: 7/22/2022 Owner's Project No.: 405-1693-6 Engineer's Project No.: N/A Sellers Project No.: Effective Date of Change Order: Upon execution by all parties The Contract is modified as follows upon execution of this Change Order: Description: Increase WAS pump size at Owner's request to support sludge thickening. Attachments: See attached Change Order Proposal from Ovivo dated 7/22/2022 (8 pages). Change in Contract Price Changp in Contract Times Original Contract Price: Original Contract Times: Substantial Completion: Per Article 2, 2.02 $ 1,395,158 + WSST Ready for final payment. Per Article 2, 2.02 Increase from previously approved Change Orders No. Increase from previously approved Change Orders. N/A: N/A: Substantial Completion: N/A $ N/A Ready for final payment: N/A Contract Price prior to this Change Order: Contract Times prior to this Change Order: Substantial Completion: Per Article 2, 2.02 $ 1,395,158 + WSST Ready for final payment: Per Article 2, 2.02 Increase this Change Order: Increase this Change Order: Substantial Completion: None $ 6,098 Ready for final payment: None Contract Price incorporating this Change Order: Contract Times with all approved Change Orders: Substantial Completion: Per Article 2, 2.02 $ 1,401,256 + WSST Ready for final payment: Per Article 2, 2.02 Reco nded En ' d) By: Title: 212'W s Director/County Engineer Date: 7/22/22 9/9/2022 Authorized by Owner Approved by Funding Agency (if applicable) By: N/A Title: Date: EJCDC® C-941, Change Order EJCDC® C-941, Change Order, Rev.1. Copyright® 2018 National Society of Professional Engineers, American Council of Engineering Companies and American Society of Civil Engineers. All rights reserved. Page 1 of 1 Accepted by Seller 2GG �G� Ovivo USA, LLC M O 0- 0 r0 I` n Ovivo SiC Systems 2300 Greenhill Dr. #100 Round Rock, TX 78664 ECN 7 for Increase WAS Pump to Port Hadlock Date Prepared By 7/22/2022 Ovivo 2300 Greenhill Dr. tMO Round Rock, TX 78664 • • Worldwide Experts in Water Treatment Services Performed For: Port Hadlock 623 Sheridan SC Pori: Townsend, VVA 9?, 368 This External Change Notice (ECN) is issued pursuant to the current contract between Port Hadlock ("Client") and Ovivo ("Vendor"), effective July 22, 2022, This ECN is subject to the terms and conditions contained in the contract between t}1e parties and is made a part thereof_ Any term not otherwise dr=fined herein shall have the meaning specified in the contract. In the event of -any conflict or inconsistency between the leans of this ECN aria the terms of the contract, the terms of this ECN shall govern and prevail. Proposal Overview Cher eque_ a larger WAS pump to support their sludge thickening J dewat:erinE system, Change Order covers material cost price differential between current purnp and new larger pump size. Change Order covers labor cost to correctly size and specify new purrp along with update Ovivo documentation to reflect new pump on drawings (MID, PFD, General Arrangements, Electrical Drawings, etc.) and to update clocurnentation within submittal (Scope of Supply, Vendor Cutsheets, etc.) t• it . i}r��► • ' r Project Change Notice (ECN 7) for Port Hadlock 7/22/2022 1 Ovivo Scope of Supply w Ovivo to provide a new WAS pump, capable of 2-5-40FIprn; fully iristrdled and integrated on VicroRLOX skid In place of current WAS pump Out of Scope Items el No Oi;)n�,,e from previous scope, same ex(lusions, apply. Supporting Documentation & Attachments t Updated docurnent and drawing packape to be provided once Cl-ianpe Order signed Delivery Details 0 PUrnp to f)e procured vvitli rest of 0r'OjeCt eQUipMellt and dE,livered [Ulk/ iristalled and integrated on microlli-OX skid Delivery Terms 0 No (Jiaii,;c2 ft orn project contract Purchase Price IItem T Description Sell Price (US Dollars) 1 Increase WAS Pump $6,098 R. Project Change Notice (ECN 7) for Port Hadlock 7122.12022 2 Payment Schedule m Propose 100% of change order paid upon delivery of updated drawing and documentation package. This would allow, the current invoicing schedule and quantities for,the overall project to remain unchanged. Pricing and Commercial Terms • Standard -Perms arc 30 days NE'T, interest charged at .t /,.% per month (18%) Ex°r anriurn orl outstanding batance.s. Please refer to contract terms For a reference point • Pricing are net, taxes are not included • Prices are valid for 30 days from proposal issuance date, If a formal purchase order is not received and accepted within this validity period Ovivo reserves the right to review and adjust pricirig and lead times as necessary. • Price, are quotes in US Dollars unless otherwise noted I@ No allowances have h,,en included for bonds of any kind Warranty 0 Warranty terms will remain consistent with Ovivo project warranty statement General Notes Pricing is i)ased on the use of Wvo standard design, equipment engineering suurn UaIs (IF I), mate�rials of constnaction, QA/CSC procedures rmd documeritatioir Proprietary and Confidential Information The attached document contains proprietary and confidential information and is submitted under a confiderntial relationship, By accepting this document die, rer ipierit agrees; roject Change Notice (ECN 7) for Port Hadlock 7/22'2022 3 It will not disclose to third parties or use any drawings, specifications, designs, processes or information supplied by Ovivo in any manner detrimental to the interests of Ovivo; a Any special features particular to this design and information gained as a result of this document shall be treated as confidential and shall he the property of Ovivo and will not be incorporated in whole or in part in other projects unless recipient obtains written permission from Ovivo to do so; Not to copy in whole or in part nor reveal its contents in any manner or for any purpose except (or the purpose stated herein; The foregoing applies without limitation to all documents prepared by Ovivo in connection with this submission and the recipient acknowledges that this document involves confidential rights of Ovivo and all design, manufacturing, reproduction, use and sale rights regarding same are expressly reserved. Approval and Acceptance In order to move forward with this change request Ovivo requires that the below be signed off and returned to the Ovivo Project Manager. Upon acceptance, a revised PO will need to be issued to include additional scope. Port Hadlock By. By: Bob Wheeler: Eric Schaefer: Project Manager: Project Manager: 'e - Y Ovivo Project Manager i .ram.. Iva & Project Change Notice (ECN 7) for Port Hadlock 7/22/2022 4 Customer Number Customer Name Project Quote Number Quote Position Number Number of Pumps Pumping Temperature Viscosity Density Specific Gravity Liquid PH Chloride Content % Solids Solid Size NPSH-Available NPSH-Required Medium Pump Part Number Pump Model Material of Construction Cover Type Housing Segment Material Housing Segment Coating Housing Segment Form Radial Wear Plates Direction of Flow Rotary Lobe Material Rotary Lobe Coating Rotary Lobe Form Rotary Lobe # of Wings 0-Ring Material Lip Seal Material Wear Plate Material Wear Plate Coating Oil Bottle Drain Hose Specification Sheet (1/2) PROCESS CONDITIONS 113487 Abrasion FilterBoxx Water & Environmental Corp Abrasiveness (1-10) CAW432: Wasting Pump Quote - Angular Gear Box Suction Condition 12302000 Requested Capacity 1 Discharge Pressure 1 Discharge Head 100 °F Inlet Pressure not Provided Differential Pressure not Provided Actual Capacity not Provided Motor HP Reserve % 7 Rated Power not Provided Pump Speed not Provided Rated Volumetric Efficiency Starting Torque 31.14 ft, Running Torque 6.56 ft. Tag Number 1 Sludge, Waste Activated POSITIVE DISPLACEMENT PUMP INFORMATION IQ112-81 H4 Buffer Chamber Fluid IQ112-81 Mechanical Seal Type Grey Cast Iron Mechanical Seal Single/Double Seal Carrier Material 0.6025 (Grey Cast Iron) Material Block Ring 1 None Material Block Ring 2 Injection S (1) Material Mechanical Seal 1 N/A Material Mechanical Seal 2 Bi-Directional Thrust Washer Material NBR Strain Bolt Material Pump Shaft Top HiFlo® Pump Shaft Bottom 4 Pump Length NBR Pump Width HNBR Pump Weight High Wear Resistant Special Steel Pump Shaft Diameter Galvanized Pump Shaft Diameter (Flange) Standard Pressurized Oil Bottle Pump Shaft Length No Maximum Shaft Deflection Pump 20 Hz Pump Speed 214 72 Flow Rate (new) 40 1.4 Flow Rate (used) 1.3 -37.8 Starting Torque 733 733 Running Torque 413 408 Running Power 1.4 0.5 Efficiency (Volume) 69.2 7.2 Efficiency (Total) 249 26 Dynamic Pressure Reduction 0.19 002 NPSH-r 6.56 6.56 PERFORMANCE DATA 60 Hz 80 Hz 215 287 RPM 402 59.5 gpm 1.5 21.2 gpm 733 733 in.lbs. 413 416 in.lbs. 1.4 19 BHP 69.3 77.1 % 25 27.5 % 0.19 0.34 psi 6.56 6.56 ft EQ II06ELSANG Medium 2 - mild Abrasive like RAS, Must 0.0 ft. flooded 40 gpm 15.0 psi 0.0 psi 15.0 psi 40.2 gpm 10% 1.4 BHP 215 RPM 69.30% 733 in.lbs. 413 in.lbs. Not Specified Oil Cartridge Single Mechanical Seal Mild Steel 304 Stainless Steel (1 4301) None Duronit None Mild Steel Galvanized Motor Shaft Long Motor Shaft Short 15.4 inch 13.9 inch 75 Ibs 45 mm 28 mm 2.4 inch 0.0015 inch Specification Sheet (1/2) . �J VOGELSANG GEARED MOTOR INFORMATION Part Number USGM0004 Gearbox Service Factor 2.10 Manufacturer NORD Gear Corp. Motor Service Factor 1.15 Vendor Part Number SK92372.1V-100LP/4 CUS TW-215 Insulation Class F Motor Material Aluminum AGMA Class III Gearbox Material Cast Iron KVA Code Class I Div I No Inverter Rating Inverter Duty Class I Div II No VFD Turndown 10:1 Ratio Voltage 230/460 Duty Continuous Frequency 60 Hz Thermistors No Phase 3 Thermostats Yes HP 3 HP Weight 91 Ibs Efficiency % 90.0 230V Full Load Amps 7.7 A Motor Speed 1770 RPM 460V Full Load Amps 3.8 A RPM (Output) 215 RPM 575V Full Load Amps Output Torque 878 in.lbs. Speed at 9 Hz Gear Ratio 8.19 Speed at 90 Hz Frame Size 100LP Temp Rise Enclosure TEFC COUPLING INFORMATION Coupling Manufacturer TB Woods Coupling Flange Drive 6S1 Coupling Sleeve 6HS Coupling Flange Pump 6S28MM FLANGE CONFIGURATION Flange Size 4.0 inch Right Flange Type Mild Steel Galv., 45' (Facing Right) Left Flange Part Number IBS3104 Right Flange Material Hot Dipped Galvanized Steel Left Flange Type Mild Steel Galv., 90' Horizonal Bend (Facing Shaft) Marathon Flange Part Number N/A Left Flange Material Hot Dipped Galvanized Steel Marathon Flange Material N/A Right Flange Part Number IBS3105 Marathon Flange Configuration N/A WARRANTY INFORMATION Warranty Type Limited Industrial Warranty I-IsI., � X rOl < C S A w rJ„w N 2 r N F O ul -M U w W > CD O O O V O O N m w > p N O C13. V 0 0? i0 O O Ut S O O O O] V J A O O O m N O w m c c 3 a m 7 3 3 N '+• N O m m N ? O- w f/1 f/1 .� N A o > > z � r W � m w f/1 C/7 C7 p O r m m f w 6 t ° 3 CD W CD ° m coZ z CD lA o — a x ` C rT G m C1 o m ° U, o m 3 CD u ° m a CD a D m m w � 0 0 C z o n m r " CD 3 m N .Q. N 0 0 o a Q m fl Q I Ut 0 '� wET A O t j m c �'° C m , p� +- f m ur w f m D co °' W N r !— V E N O ' V Q 07 to m Nen w 00 A °1 •• W cn C N N � w w Lo D_ ('I Q w O p •A �I A TI O O `o (n w _ ..- eZ: 3 m ' n m O w O N IM A_ .°w' A A CD CD N N f0 0 S � 0(n7 U) O Gi 9 w m ° N w< 3 m 0 p c a o O CD 0 C, wz m zm S fD CD CDO CD 0_ O O o IC-O N w ] w J On A O OJ�, d Q {p m CDm N f}�W , �°-p i mCD° 3 z �v �°�- - 1. via o x z°0 o z 3 C m { Wb FT < m o V 0 A D ?t m N O cn Ln EO CD ❑. m nZ 3 CD w CD m ` + In O D w D_ N � L� cow 0 0 n 8 o o 1 cn m Ll _ m N � N O CD O a ic N cn O -U o m W m N O ni a < m m Cn a c m W cn O O O O O O Flowrate in GPM J � O O O O O �A \\ NX 4Ph \\ o \• N \ Ul \\ . en \\ . . . . . ... . . . . .. O N C31 O CJ1 O O O O O Power in HP N W Cn O O O SO w\, W rt CD cn m m fJ a N n & O N rt d 7 �D N C m Z O U) 0 a 2 fD fD ;p Z .. 0 a) N D W O O W 0 CN 01 cc N_ 7 T c 3