Loading...
HomeMy WebLinkAboutSEP2021-00166 - 02 PERMIT^"\ll e9.-r &)#w Public l'leolth JEFFERSON COUNTY ENVIRONMENTAL PUBLIC HEALTH 6'15 Sheridan St. Port Townsend, WA 98368 www jefferso ncou ntypu bl ichea lth. o rg Phone 360-385-9444 Fax 360-379-4487 ON.SITE SEWAGE DISPOSAL PERMIT pERMIT #: SEp202i-00166 Date Received: 09t22121 sTTEADDRESS: 3g EDGEWATER cr Date lssued: 11118121 poRT HADL'CK, wA 98339 Date Expires: 11118124 APPLICANT: BARI D BOOKOUT PHONE: 206-972-3226 4702 S ALASKA ST SEATTLE WA98118-1849 LEGAL DESCRIPTION: VILLAS BY THE SEA LOT I9(REVISED) PARCEL#: 997900019 Section: 1 Township: 29N Ranqe: 1W DESIGNER CHRISTOPHE MORTON 4091 BLUE MOUNTAIN RD PORT ANGELES WA 98362 PHONE: 360-860-2326 SYSTEM DESCRIPTION: No. of Gallons per Day: 240 Drainfield- Length: feet SEPTIC TANK TO COM SYS Type of work:NEW -Qa ptic Tank-------- width feet Depth inches Size: 1,000 gallons DISCLAIMER- This approval is for an on-site sewage system that meets the state and county standards in effect on the date of application. This approval for an on-site sewage system DOES NOT assure you of any other County approvals. For example, it DOES NOT GUARANTEE that you will later obtain permission to build a permanent residence or other structure on this parcel. Any future application wil! be separately judged by the rules and laws in effect at that time. All construction and development activities must comply with all permit conditions, state and local codes, and Recommended Standards and Guidance documents in effect when the permit is issued. The property owner is responsible for the accurate location of all property lines. Any removal of or major disturbance of soil in the primary or reserve drainfield area may create site conditions that are unacceptable for the installation of a sewage disposal system Any change in drainfield or tank location may invalidate this permit unless prior approval is obtained from the Jefferson County Environmental Health Division. lf during excavation or development of the site an area of potential archeological significance is uncovered, all activity in the immediate area shall be halted, and the UDC Administrator shall be notified at once. Permit issued to CONSTRUCT, ALTER, REPAIR OR tttODlFY AN INDIVIDUAL SEWAGE DISPOSAL SYSTEM IN JEFFERSON COUNTY, WASHINGTON This permit is issued for a period of three years (unless otherwise stated above) in accordance with Jefferson County Rules and Regulations for On-Site Sewage Systems, codified in JCC 8.15 as amended. This permit may not be renewed. Jefferson County Envi Ith Specialist This permit with conditions must be onsite during all phases of construction HEALTH DEPARTMENT MUST BE CONTACTED FOR FINAL INSPECTION. SPECIAL CONDITIONS APPLY. SEE REVERSE & ADDITIONAL PAGES CONDITIONS OF APPROVAL - PERMIT NO.: SEP2021-00166 1.) At the time of installation, the community drainfield system owner, Bob or Lisa Wise, must be notified at 360-385-6368 by the Designer when tank(s) are installed. 2.) Any portion of transport line under a driven way is to be sleeved/cased or equivalent. 3.) 10' separation required between a Water line and all portions of the onsite sewage system; effluent transport line and tanks. 4.) Approval/issuance of a sewage disposal permit or installation of a septic system does not guarantee the approval of other development or a building permit on this site. Future buildings that require connection to an on-site sewage system (OSS) shall only be approved if the OSS meets the current standards and codes in effect at the time of the building application. 5.) All construction and development activities must comply with all permit conditions, Washington State and Jefferson County Codes and Recommended Standards and Guidance documents in effect when the permit is issued. 6.) This system must be constructed by an installer certified by the Jefferson County Public Health Department per Jefferson County Code 8.1 5.120 (9) and state code WAC246-272A-0250. for setback to surface water 7.) Designer must be contacted prior to start of construction and for inspections during installation. DESIGNER IS REQUIRED TO DO A PRECOVER INSPECTION ON ALL TYPES OF SYSTEMS. 8.) Notification of the start of construction shall be faxed or emailed to Jefferson County Public Health ONE WORKING DAY prior to start. 9.) Divert all sources of drainage, including roof drains away from septic tank and drainfield area. 10.) Approval of this sewage disposal permit does not preclude the permit holder from complying with the Unified Development Code for other/future development on the site. 11 ) The project shall adhere to the Best Management Practices (BMPs) for the control of stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. 12 ) H - An asbuilt drawing and certification of completion by the Designer is required prior to final approval. 13.) H - AS PER WAC 246-272AAND JEFFERSON COUNTY CODE 8.15 ALL ONSTTE SEWAGE SYSTEMS REQUIRE THATA RESTRICTIVE COVENANT REGARDING THE MONITORING OF THE ONSITE SEPTIC SYSTEM BE RECORDED TO THE PROPERTY TITLE. THE PROPERTY OWNER SHALLASSURE THAT MONITORING IS PROVIDED BYAN APPROVED ENTITYAT THE FREQUENCY DEFINED PER STATE WAC 246-272AAND JEFFERSON COUNTY CODE 8.15 AS ADOPTED ORAMENDED. A COPY OF THE RECORDED OPERATIONS AND MONITORING AGREEMENT IS REQUIRED PRIOR TO FINALAPPROVAL OF THE SEWAGE DISPOSAL PERMIT sEP2021-00166 \\tidemark\data\forms\F_SEP_Perm itmod. rpt Page 2 ol 2 11t18t2021