Loading...
HomeMy WebLinkAboutSEP2021-00060 - 02 PERMITPERMIT #: SITE ADDRESS APPLICANT ON.SITE SEWAGE DISPOSAL PERMIT SEp2021-00060 Date Received: 04t07t21 2370 HASTTNGS AVE W Date lssued: O7lO7l21 poRT TSWNSEND, WA 98368 Date Expires: 07107124 CHARLES M HANSON PHONE: 360-301-9638 7635 MILLS RD MONTEREY CA 93940-7319 LEGAL DESCRIPTION: 55 T3O RI W TX 14 PARCEL #:001 05401 7 Section: 5 Township: 30N Range: 1W #- JEFFERSON COUNTY ENV!RONMENTAL PUBLIC HEALTH 615 Sheridan St Porl Townsend, WA 98368 www.jeffersoncountypublichealth org Phone 360-385-9444 Fax 360-379-4487 DESIGNER:JESS GODSALVE P O BOX 179 PORT HADLOCK WA 98339 PHoNE: 360-551-9973 SYSTEM DESCRIPTION: No. of Gallons per Day: 600 Drainfield-- Length: 350 feet CONVENTIONAL TRENCH Type of work.NEW ------Trench --------Septic Tank------ Size: 1,500 gallonsWidth: 3 feet Depth: 24 inches DISCLAIMER- This approval is for an on-site sewage system that meets the state and county standards in effect on the date of application. This approval for an on-site sewage system DOES NOT assure you of any other County approvals. For example, it DOES NOT GUARANTEE that you will later obtain permission to build a permanent residence or other structure on this parcel. Any future application will be separately judged by the rules and Iaws in effect at that time. All construction and development activities must comply with all permit conditions, state and local codes, and Recommended Standards and Guidance documents in effect when the permit is issued. The property owner is responsible for the accurate location of all property lines. Any removal of or major disturbance of soil in the primary or reserve drainfield area may create site conditions that are unacceptable for the installation of a sewage disposal system. Any change in drainfield or tank location may invalidate this permit unless prior approval is obtained from the Jefferson County Environmental Health Division. lf during excavation or development of the site an area of potential archeological significance is uncovered, all activity in the immediate area shall be halted, and the UDC Administrator shall be notified at once. SPECIAL CONDITIONS APPLY . SEE REVERSE & ADDITIONAL PAGES Permit issued to CONSTRUCT, ALTER, REPAIR OR MODIFY AN INDIVIDUAL SEWAGE DISPOSAL SYSTEM IN JEFFERSON COUNTY, WASHINGTON This permit is issued for a period of three years (unless otherwise stated above) in accordance with Jefferson County Rules and Regulations for On-Site Sewage Systems, codified in JCC 8.15 as amended. This permit may not be renewed. ,a //.rrlL 6, p*rd,/. kna.r* Jefferson County =nr,ronr#, *"*n a*"*, This permit with conditions must be onsite during al! phases of construction HEALTH DEPARTMENT ]I'IUST BE CONTACTED FOR FINAL INSPECTION. CONDITIONS OF APPROVAL - PERMIT NO.: SEP2021-00060 1.) H - Prior to final of this permit, demo of the existing building under BLD2O21-00379 must be complete and in final status. 2.) The project shall adhere to the Best Management Practices (BMPs) for the control of stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. 3.) Approval/issuance of a sewage disposal permit or installation of a septic system does not guarantee the approval of other development or a building permit on this site. Future buildings that require connection to an on-site sewage system (OSS) shall only be approved if the OSS meets the current standards and codes in effect at the time of the building application. 4.) All construction and development activities must comply with all permit conditions, Washington State and Jefferson County Codes and Recommended Standards and Guidance documents in effect when the permit is issued. 5.) H - AS pER WAC 246-272AAND JEFFERSON COUNTY CODE 8.15 ALL ONSTTE SEWAGE SYSTEMS REQUIRE THATA RESTRICTIVE COVENANT REGARDING THE MONITORING OF THE ONSITE SEPTIC SYSTEM BE RECORDED TO THE PROPERTY TITLE. THE PROPERTY OWNER SHALL ASSURE THAT MONITORING IS PROVIDED BY AN APPROVED ENTITY AT THE FREQUENCY DEFINED PER STATE WAC 246-272AAND JEFFERSON COUNTY CODE 8.15 AS ADOPTED OR AMENDED. 6.) 7.) 8.) e.) 10) A COPY OF THE RECORDED OPERATIONS AND MONITORING AGREEMENT IS REQUIRED PRIOR TO FINALAPPROVAL OF THE SEWAGE DISPOSAL PERMIT Designer must be contacted prior to start of construction and for inspections during installation. DESIGNER IS REQUIRED TO DO A PRECOVER INSPECTION ON ALL TYPES OF SYSTEMS. Notification of the start of construction shall be faxed or emailed to Jefferson County Public Health ONE WORKING DAY prior to start. H - An asbuilt drawing and certification of completion by the Designer is required prior to final approval. Before final approval is given, the designer shall provide an operations and maintenance manual to the property owner and the Health Department. The manual must instruct the owner of the on site sewage system on the ways to properly operate and maintain all components of the system. Setback to surface waters- 100' required from drainfield and reserve areas. 50' required from tanks. All components of the septic system are to be completely protected from vehicular traffic or mechanical disturbance. Divert all sources of drainage, including roof drains away from septic tank and drainfield area. Approval of this sewage disposal permit does not preclude the permit holder from complying with the Unified Development Code for other/future development on the site. 11 .) 12.) 13.) sEP2021 -00060 \\tidemark\data\forms\F_SEP_Permitmod. rpt Page 2 of 2 7t7t2021