Loading...
HomeMy WebLinkAboutSEP2022-00003 - 02 PERMITJEFFERSON COUNTY ENVIRONMENTAL PUBLIC HEALTH 615 Sheridan St Port Townsend, WA 98368 www leffersoncountypu blichea lth org Phone 360-385-9444 Fax 360-379-4487 ON.SITE SEWAGE DISPOSAL PERMIT pERMIT #: SEq2O22-00003 Date Received: 01t06t22 SITE ADDRESS: 638 FoRT GATE RD DAIE ISSUEd: 06106122 N9RDLAND, WA 98358 Date Expires: 06/06/25 APPLICANT: CATHLEEN BINGAMAN PHONE: 425-280-5523 MICHAEL BINGAMAN 9504 18OTH ST SE sNoHoMrsH wA 98296-8056 LEGAL DESCRIPTION: Sl9 T30 RIE TAx #18 (S l/2) LESS N 140'T.L. TAX F (S l/2 LESS Nl40') PARCEL#021 1 91 006 Section: 19 Township. 30N Ranqe: 1E ^^ \\ /1 g+i\U )itrt*,9/" Gnht Public l-leollh DESIGNER:NATHAN CLEAVER NATHAN CLEAVER SEPTIC DESIGN 262 NW THOMPSON RD POULSBO WA 98370 PHONE: 360-598-6546 SYSTEM DESCRIPTION: No. of Gallons per Day: 240 Drainfield-- Length: 200 feet PRESSURIZED TRENCH TYPe of work: NEw ---Trench -------Septic Tank----- Size: 1,000 gallonsWidth: 3 feet Depth: 6 inches DISCLAIMER- This approval is for an on-site sewage system that meets the state and county standards in effect on the date of application. This approval for an on-site sewage system DOES NOT assure you of any other County approvals. For example, it DOES NOT GUARANTEE that you will later obtain permission to build a permanent residence or other structure on this parcel. Any future application wil! be separately judged by the rules and laws in effect at that time. All construction and development activities must comply with all permit conditions, state and local codes, and Recommended Standards and Guidance documents in effect when the permit is issued. The property owner is responsible for the accurate location of all prope(y lines. Any removal of or major disturbance of soil in the primary or reserve drainfield area may create site conditions that are unacceptable for the installation of a sewage disposal system. Any change in drainfield or tank location may invalidate this permit unless prior approval is obtained from the Jefferson County Environmental Health Division. lf during excavation or development of the site an area of potential archeological significance is uncovered, all activity in the immediate area shall be halted, and the UDC Administrator shall be notified at once. Permit issued to CONSTRUCT, ALTER, REPAIR OR MODIFYAN INDIVIDUAL SEWAGE DISPOSAL SYSTEM IN JEFFERSON COUNTY, WASHINGTON This permit is issued for a period of three years (unless otherwise stated above) in accordance with Jefferson County Rules and Regulations for On-Site Sewage Systems, codified in JCC 8.15 as amended. This permit may not be renewed. , J _bw- Jefferson County Environmental Health Specialist This permit with conditions must be onsite during all phases of construction HEALTH DEPARTMENT MUST BE CONTAGTED FOR FINAL INSPECTION. SPECIAL CONDITIONS APPLY - SEE REVERSE & ADDITIONAL PAGES CONDITIONS OF APPROVAL - PERMIT NO.: SEP2022-00003 1.) This system is mapped in a CriticalAquifer Recharge Area which requires Nitrogen reducing BMP's. The system must be installed with a maximum trench depth of 6" to meet the required BMP's. 4.) 2.) 3.) 5.) 6.) 7.) Any portion of transport line under a driven way is to be sleeved/cased or equivalent. H - Permanent barriers are required along/around primary and reserve drainfield areas to protect from parking, driving, and other land disturbing activities prior to final. 10' separation required between a Water line and all portions of the onsite sewage system; effluent transport line, tanks, treatment and disposal components. ln areas where the 10'setback cannot be maintained, water line shall be sleeved as shown in the approved design. MAXIMUM TRENCH DEPTH 6 INCHES Contact designer prior to installation for staking of drainfield area. H - A soil log will be dug in the reserve area duing installation for observance by JCEPH at install or pressure test. Approval/issuance of a sewage disposal permit or installation of a septic system does not guarantee the approval of other development or a building permit on this site. Future buildings that require connection to an on-site sewage system (OSS) shall only be approved if the OSS meets the current standards and codes in effect at the time of the building application. All construction and development activities must comply with all permit conditions, Washington State and Jefferson County Codes and Recommended Standards and Guidance documents in effect when the permit is issued. H - AS PER WAC 246-272AAND JEFFERSON COUNTY CODE 8.15 ALL ONSITE SEWAGE SYSTEMS REQUIRE THATA RESTRICTIVE COVENANT REGARDING THE MONITORING OF THE ONSITE SEPTIC SYSTEM BE RECORDED TO THE PROPERTY TITLE. THE PROPERTY OWNER SHALL ASSURE THAT MONITORING IS PROVIDED BY AN APPROVED ENTITY AT THE FREQUENCY DEFINED PER STATE WAC 246-272AAND JEFFERSON COUNTY CODE 8.15 AS ADOPTED ORAMENDED. 8.) e.) 10.) A COPY OF THE RECORDED OPERATIONS AND MONITORING AGREEMENT IS REQUIRED PRIOR TO FINALAPPROVAL OF THE SEWAGE DISPOSAL PERMIT 11 ) Health Dept. required to observe pressure test with system designer when system fully installed/complete, 48 hours notice to be provided for scheduling. 12.) This system must be constructed by an installer certified by the Jefferson County Public Health Department per Jefferson County Code 8.15.120 (9) and state code WAC246-272A-0250. 13.) Designer must be contacted prior to start of construction and for inspections during installation. DESIGNER IS REQUIRED TO DO A PRECOVER INSPECTION ON ALL TYPES OF SYSTEMS. 14.) Notification of the start of construction shall be faxed or emailed to Jefferson County Public Health ONE WORKING DAY prior to start. 15 ) H - An asbuilt drawing and certification of completion by the designer is required prior to final approval. 16.) Before final approval is given, the designer shall provide an operations and maintenance manualto the property owner and the Health Department. The manual must instruct the owner of the on site sewage system on the ways to properly operate and maintain all components of the system. 17.) Divert all sources of drainage, including roof drains away from septic tank and drainfield area. sEP2022-00003 \\tidemark\data\forms\F_SEP_Perm itmod. rpt Page 2 of 3 6t6t2022 ) '"i , 18.) 1e.) Approval of this sewage disposal permit does not preclude the permit holder from complying with the Unified Development Code for other/future development on the site. The project shall adhere to the Best Management Practices (BMPs) for the control of stormwater, erosion and sediment during construction. BMPs shall address permanent measures to stabilize soil exposed during construction, and in the design and operation of stormwater and drainage control systems. sEP2022-00003 \\tidemark\data\forms\F_SEP_Permitmod. rpt Page 3 of 3 6t6t2022