HomeMy WebLinkAboutPRE2022-00031 EPH COMMENTS 10262022PRE2022-00031, Rathvon
Drinking Water
Emma Erickson EErickson@co.jefferson.wa.us
• No approval is given nor implied for the well site shown on the site plan.
• The well’s 100’ protective radius (as you have shown) is recommended to be completely located
on your property.
• You are required to submit a Application for Well Construction Inspection to this office prior to
drilling your well.
• After your well application is released, you are required to submit 24hr start notification to our
office prior to beginning construction of the well.
• The well must be drilled by a Washington State licensed well driller.
• Prior to building permit application, you will need to drill your well and have the water tested to
show it is potable.
• Your property is located in a coastal Seawater Intrusion Protection Zone (SIPZ) – no known sea
water intruded wells are within 1000’ of your property boundaries
• Your property is located in the WRIA17 Toandos subbasin – this is a coastal management area
with water conservation standard of use up to 5000 gpd.
• A water meter will be required as a condition of future building permit approval.