HomeMy WebLinkAboutPRE2022-00044Scan the QR code to access the digital form.
DEPARTMENT OF COMMUNITY DEVELOPMENT
621 Sheridan Street, Port Townsend, WA 98368
Tel: 360.379.4450 | Fax: 360.379.4451
Web: www.co.jefferson.wa.us/communitydevelopment
E-mail: dcd@co.jefferson.wa.us
PRE-APPLICATION CONFERENCE
Purpose
The purpose of the pre-application process is to ensure consistency with the applicable sections of JCC Title 18.
Process
1. Submit an application for a pre-application conference with the required items below.
2. Once submitted, staff will be assigned to the case, and they will coordinate with you on potential meeting dates.
3. Discuss project at meeting with all required departments. If necessary meeting will be held on site.
4. Receive written report from Jefferson County on process to move forward with project.
5. Submit all required applications for project; once approvals are issued, start project!
The Jefferson County Code (JCC) 18.40.090 & 18.25.640: When Required. Pre-application conferences are required
for all Type II, Type III, Type IV and Type V project applications and Type I project applications proposing impervious
surfaces of 10,000 square feet or more and/or non-single-family structures of 5,000 square feet or more.
Additionally, pre-application conferences are required for industrial, commercial, and critical area stewardship plan
applications. The administrator may exercise discretion not to require a pre-application conference if the
administrator determines that the conference information is self-evident, already transmitted, or would not add
value to the subsequent application. Pre-application conferences for all other types of applications are optional,
and requests for conferences will be considered by the administrator on a time-available basis. The consultation
includes preliminary review and administrative assistance. This service does not include extensive field inspection
or correspondence. Pre-application consultation does not limit subsequent administrative review.
At the conference, Department of Community Development personnel shall provide the applicant with:
1. A list of the requirements for a completed application;
2. A general summary of the procedures to be used to process the application;
3. The references to relevant code provisions or development standards that may apply to the approval of
the application; and
4. A list of any applicable hourly review fees that may be charged by one or more County agencies upon
the filing of a project permit application with the County.
Discussions at the conference or the information provided by the staff shall not bind or prohibit the County’s future
application or enforcement of all applicable laws and regulations. No statements or assurances made by County
representatives shall in any way relieve the applicant of their duty to submit an application consistent with all
relevant requirements of County, state and federal codes, laws, regulations and land use plans.
Required Submittal Items
Pre-Application Conference Application
Conceptual Design plan – see pg. 2
Permit Fees based on departments requested/required to attend for project type
List of everybody who will be involved in the meeting and/or project
Attach any special reports already completed for the project/parcel
G:\PermitCenter\%%%FORMS%%%\Land Use\Pre-App\pre-app conference form QR code.docx REV. 2/20/2020 Page 2
Application Directions
1. Please answer all questions on this form completely.
2. Attach one sketch of the Conceptual Design plan for the proposed use or activity, showing the following information:
a. Vicinity sketch;
b. North arrow and scale;
c. Property boundaries and identification of land uses on adjacent properties;
d. Means of ingress and egress;
e. Property/lot drainage;
f. Possible locations of sewage disposal and water supply systems;
g. Location of utility easements; and
h. Proposed location of buildings, including setbacks to property boundaries.
3. Attach payment of the applicable fee, as set forth in the Jefferson County Fee Ordinance.
Applicant Name:
Mailing address:
Telephone: email:
Representative:
Mailing address:
Telephone: email:
representative:
Telephone: email:
Representative:
Telephone: email:
Representative:
Telephone: email:
Include additional names on a separate sheet.
Property Description
General Location:
Legal Description (from Property Tax Statement):
9-Digit Parcel Number:
Total Acreage:
Zone:
% Lot Coverage:
This is the % of your property
that is covered by impervious
surface.
Applicant: Owner Lessee
Contract Purchaser Other ____________________________
G:\PermitCenter\%%%FORMS%%%\Land Use\Pre-App\pre-app conference form QR code.docx REV. 2/20/2020 Page 3
Project Description (attach additional pages if necessary)
Standard Disclosure
Information provided to a prospective applicant during the pre-application consultation is based on County regulations in effect at the
time of the pre-application consultation. Revised or new County regulations could affect a future development application. A pre-
application consultation does not vest a future development application.
By signing the application form, the applicant/owner attests that the information provided herein is true and correct to the best of their
knowledge. I also certify that this application is being made with the full knowledge and consent of all owners of the affected property.
Any material falsehood or any omission of a material fact made by the applicant/owner with respect to this application packet may result
in this permit being null and void.
I further agree to save, indemnify and hold harmless Jefferson County against all liabilities, judgments, court costs, reasonable attorney’s
fees and expenses which may in any way accrue against Jefferson County as a result of or in consequence of the granting of this permit.
I further agree to provide access and right of entry to Jefferson County and its employees, representatives or agents for the sole purpose
of application review and any required later inspections. This right of entry shall expire when the County (through the Administrator or
the Administrator’s representatives) concludes the application has complied with all applicable laws and regulations. Access and right of
entry to the applicant’s property shall be requested and shall occur only during regular business hours.
(Applicant signature)(Date)
I hereby designate ___________________________________________to act as my agent in matters related to this pre-application
conference.
______________________________________________________________________________ ______________________________
(Landowner signature) (Date)
OFFICE USE ONLY
Pre-Application Conference Fees
Land Use $510.00
Environmental Health – if requested/required to attend ($232.00)
Building – if requested/required to attend ($102.00)
Public Works – if requested/required to attend ($144.00)
Fire Marshall – if requested/required to attend ($102.00)
Scan Fee $25.50
Site Visit – optional ($204.00)
Subtotal
Technology Fee – 5% $
Total Fees $
Fees based on project and departments requested/required to attend.
EH035
DCD010
DCD029
DCD020
DCD022
DCD018
DCD003
DCD018
G:\PermitCenter\%%%FORMS%%%\Land Use\Pre-App\pre-app conference form QR code.docx REV. 2/20/2020 Page 4
CONCEPTUAL DESIGN PLAN
Please submit (or attach) a site map that graphically shows the required conceptual design items listed on page 2.
#Ä
#Ä
August 22, 2022
421 MUMBY LLC
7200 W RIDGE RD
MERCER ISLAND WA 98040-5565
RE: SITE ADDRESS: 421 MUMBY RD
JEFFERSON COUNTY
DEPARTMENT OF COMMUNITY DEVELOPMENT
621 Sheridan Street | Port Townsend, WA 98368
360-379-4450 | email: dcd@co.jefferson.wa.us
www.co.jefferson.wa.us/commdevelopment
CASE #: SEP2022-00082
Dear 421 MUMBY LLC:
The Department of Community Development (DCD) is in the process of reviewing your application.
The following information is needed to continue review of your project.
There is a 6-Year Moratorium on Non-Forest Permits on this parcel associated with Forest Practices
Application (FPA) 2616970, completed by 421 Mumby LLC on 04/20/21 and approved on 4/25/2021
by the Washington Department of Natural Resources (DNR).
Forest Practices Applications fall under the provisions of JCC 18.20.160(5)(b) "Mandatory six-year
development moratorium. For six years after the date of the application the county shall deny any
and all applications for permits and approvals, including building permits and subdivision approvals,
relating to or for non-forestry uses of land subject to the application". No portion of the septic
system, including the transport line, can be located in the FPA harvest area.
The proposed location for the 2-Bedroom ADU septic system is within the harvest area mapped and
accepted by the DNR in FPA 2616970. Based on the findings that the current property owner is the
same as the applicant for FPA 2616970, and that the location of the proposed septic is within the
accepted harvest area in the FPA, DCD will deny this application. The applicant will have to move
the proposed septic components outside of the harvest area accepted in FPA 2616970, or wait for
the Moratorium to be released after 6-years have elapsed from the approval date of the FPA.
Please submit the above information to the Department of Community Development (DCD) within 90
days of the date of this letter which would be 11/20/2022. Please call 360-379-4463 to speak with the
assigned planner if you have any questions.
Sincerely,
Emilie Uemura_____________________________________
Department of Community Development Staff
1
Helena Smith
From:Drum, Chelsea (DNR) <Chelsea.Drum@dnr.wa.gov>
Sent:Wednesday, September 21, 2022 3:47 PM
To:Amanda Hunt
Cc:Puksta, Levi (DNR); ALLISON, TED (DNR)
Subject:FW: Notice of Conversion to a Nonforestry Use #110866
Attachments:OLY-NCNU-22-110866.pdf; NCNU 110866 Letter.pdf; fp2616970.pdf; RCW 76.09.460.pdf
ALERT: BE CAUTIOUS This email originated outside the organization. Do not open attachments or click on links if you
are not expecting them.
Hello Amanda,
Please see the attached information regarding a NCNU issued yesterday.
Thank you,
Chelsea
Chelsea Drum
Forest Practices Coordinator
DNR Olympic Region
Cell: (360) 640‐1578
chelsea.drum@dnr.wa.gov
From: Drum, Chelsea (DNR)
Sent: Tuesday, September 20, 2022 1:54 PM
To: 'Planning' <planning@co.jefferson.wa.us>
Cc: Puksta, Levi (DNR) <Levi.Puksta@dnr.wa.gov>; ALLISON, TED (DNR) <TED.ALLISON@dnr.wa.gov>; Kerschner, Kate
(DNR) <Kate.Kerschner@dnr.wa.gov>
Subject: Notice of Conversion to a Nonforestry Use #110866
Jefferson County Planning,
Forest Practices issued the attached Notice of Conversion to a Nonforestry Use today. Materials are also being sent in
the mail to you.
Please reach out if you have any questions.
Sincerely,
Chelsea Drum
Chelsea Drum
Forest Practices Coordinator
Olympic Region
Washington State Department of Natural Resources
Main Office: (360) 374‐2800 | Cell: (360) 640‐1578
chelsea.drum@dnr.wa.gov
JUNE 2020 VERSION
Forest Practices Application/Notification
Office Checklist Page 1
FPA/N #:___________________
Received Date:___________________
Completed Date:___________________
WDFW Concurrence Due Date:___________________
WDFW Concurrence Review
Completed:___________________
Comments Due Date: ___________________
Decision Due Date:___________________
FP Forester:___________________
Shutdown Zone:___________________
FPA/N CLASSIFICATION: II III IVG IVS Biomass Salvage FFFPP 20/ac Exempt
Landowner
Name:
Project
Name:
____________
WRIA:____________________________________________ WAU:____________________________________________
WRIA:____________________________________________ WAU:____________________________________________
Legal:____________________________________________ County:__________________________________________
Activity Type(s): Harvest ac Crossing(s) #Rock Pit ac
Spoils cy Construction ft Abandonment ft
ALTERNATIVE PRESCRIPTIONS
Alternate Plan Fixed-Width Overstocked
Urban Growth Area (Resource Review)
Statement of Intent (UGA)
Ten-Year Forest Management Plan
App. Watershed Analysis:_______________________
Habitat Conservation Plan HCP Crosswalk(s)
Landowner Option Plan for Northern Spotted Owl
Cooperative Habitat Enhancement Agreement
Columbia River Gorge National Scenic Area
RESOURCE REVIEW
Potentially Unstable Slopes
Soils Map Highly Erodible Highly Unstable
SLPSTAB
Landslide Inventory Polygon
Avalanche WSDOT FP
Rain-on-Snow Outside Approved WA
Hydric Soils
Wetland Forested A B
In WMZ of A B Wetland
In RMZ/ELZ of Type S F N water
Bald Eagle nest or roost within 660 feet
Group A or B Water Supply
Hatchery | Name:_____________________________
Even-Aged Harvest greater than 120 Acres
Ground-based Equipment on Slopes at or greater than 40%
Road Construction on Slopes at or greater than 65%
Saltwater Islands (Marrowstone)
Long Term Commitment Area
In or Over Typed Water S F Np Ns
Water Verification
ASSOCIATED NON-SCANNED DOCUMENTS – On file with the FPA/N at the Region office.
SEPA Checklist/Documents Large Forest LO RMAP #_____________
ASSOCIATED SCANNED DOCUMENTS
COHP SEPA DNS/MDNS LGE Permit(s)/Info
FPHP Plans & Specifications
Qualified Expert Report | Type:____________________
Slope Stability Informational Form
Shoreline Permit
Natural Regeneration Plan
Hardwood Conversion Form
Marbled Murrelet Form
SFLO RMAP Checklist # _______________FFFPP
New Old | WTMF #_______________________________
Water Classification Worksheet
Watershed Analysis Worksheet (Approved)
DFC Printout
CMZ Assessment Form
Water Protocol Surveys
Np RMZ Worksheet
Shade Documentation Shade Worksheet
Wetland Mitigation Plan
ICN SWO NTC #_______________ WDFW BIOLOGIST:___________________________________
EARR Tax Credit Yes No
Olympic Region
Form completed by _______
1$
1$
.0
2616970
4/20/2021
4/20/2021
4/25/2021
4/25/2021
1621
653 S
✔
421 Mumby LLC 421 Mumby Rd
Quilcene-SnowWRIA: ________________________________ WAU:_Chimakum___________________________________________
20(30-1E)Jefferson
Siu
KJ
6
2616970Olympic4/21/2021
2616970
2616970
2616970
2616970
2616970
2616970
2616970
2616970
2616970